flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Zurich defies center-core office archetype with stacked, cantilevered HQ

Office Buildings

Zurich defies center-core office archetype with stacked, cantilevered HQ

The top bar is 500 feet long, spans 180 feet between the bottom two bars, and cantilevers out 60 feet to the east.


By David Malone, Associate Editor | February 3, 2017

©James Steinkamp Photography

Spanning 783,800 sf across its 11 stories, Zurich’s new North American headquarters in Schaumburg, Ill., houses almost 3,000 employees and contractors in a “stacked bars” office complex. Designed by Goettsch Partners, with Clayco as the developer and design-builder, the LEED Platinum-certified building breaks free from the typical center-core suburban office form with a trio of rectangular boxes that are offset and stacked. The top bar is 500 feet long, spans 180 feet between the bottom two bars, and cantilevers out 60 feet to the east, directly on axis with downtown Chicago, 28 miles to the southeast. 

The HQ’s unusual arrangement offers numerous benefits, including optimal views of the surrounding landscape, improved solar orientation for amenities, and programmatic flexibility for Zurich. It also creates multiple spaces and amenities to encourage collaboration and wellness among employees, including green roofs, outdoor terraces, and a system of walking trails. 

The project’s interior designer and workplace strategist, CannonDesign, led an extensive workplace pilot program and employee survey project (1,300 responses were recorded) to optimize the design scheme. More than 150 employees spent three weeks testing four uniquely configured office neighborhoods, each with different styles of desks, chairs, enclaves, conference rooms, and informal meeting spaces. The final design, which incorporates adjustable sit/stand desks, a variety of formal and informal meeting spaces, and decentralized break areas, was selected based on performance and feedback, including increased interaction among teams, decreased waiting times, and more flexibility.   

Also on the Building Team: JLL (client’s rep.), WSP/Halvorson and Partners (SE), V3 Companies (CE), Thornton Tomasetti (sustainability consultant), and Hoerr Schaudt Landscape Architects.

 

©James Steinkamp Photography

 

​©James Steinkamp Photography

Related Stories

Office Buildings | Mar 24, 2021

JEA Headquarters tops out in Jacksonville

The building has recently topped out.

Energy Efficiency | Mar 23, 2021

ASHRAE’s new headquarters walks the talk about net-zero energy

The conversion of a 1970s’-era building demonstrates how older structures can be made more efficient and sustainable.

Office Buildings | Mar 16, 2021

Perkins&Will unveils design of its New York Studio

The studio supports hybrid work models with agile layouts and integrated broadcast technologies.

Laboratories | Mar 10, 2021

8 tips for converting office space to life sciences labs

Creating a successful life sciences facility within the shell of a former office building can be much like that old “square peg round hole” paradigm. Two experts offer important advice.

Office Buildings | Mar 4, 2021

1905 industrial building set to become Acciona’s new office in Madrid

Foster + Partners is designing the project.

Office Buildings | Mar 3, 2021

Turano Baking Company’s new HQ and test kitchen completes in Oak Park, Ill.

Wright Heerema Architects designed the project.

Office Buildings | Feb 26, 2021

KWK Architects repurposes industrial site and warehouse into office space for Washington University School of Medicine

The project’s first two phases have been completed with the third and final phase under way.

Coronavirus | Feb 24, 2021

COVID-19 spurs need for specific building solutions

A medical supply house’s new call center and a vaccination module that can handle more patients faster are among the latest projects.

Market Data | Feb 24, 2021

2021 won’t be a growth year for construction spending, says latest JLL forecast

Predicts second-half improvement toward normalization next year.

boombox1
boombox2
native1

More In Category



Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.


MFPRO+ News

San Francisco unveils guidelines to streamline office-to-residential conversions

The San Francisco Department of Building Inspection announced a series of new building code guidelines clarifying adaptive reuse code provisions and exceptions for converting office-to-residential buildings. Developed in response to the Commercial to Residential Adaptive Reuse program established in July 2023, the guidelines aim to increase the viability of converting underutilized office buildings into housing by reducing regulatory barriers in specific zoning districts downtown. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021