flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

11 Tips for Breathing New Life into Old Office Spaces

11 Tips for Breathing New Life into Old Office Spaces

With the slowdown in new office building construction across the country, many design and construction firms are turning their attention to office building reconstruction and interior renovations—something Cincinnati-based Hixson Architecture Engineering Interiors has been doing since its founding, in 1948.


By By Robert Cassidy, Editorial Director | November 2, 2010
This article first appeared in the November 2010 issue of BD+C.

Building Design+Construction talked to experts from Hixson Architecture Engineering Interiors for their advice on renovating whole office buildings and office interiors: Colleen McCafferty, LEED AP, Corporate Interiors Team Leader; Bruce F. Mirrielees, AIA, SVP of Project Management; and John Hudson, Director of Client Development. Here are 11 lessons from their experience that may help you in planning your clients’ next office renovation projects.

11 Tips for Office Renovation Success

1. Ask the hard bottom-line questions first.

2. Take a realistic look at the surrounding neighborhood.

3. Look for local or regional economic incentives.

4. Develop an exit strategy for the property.

5. Create a communication plan for the current occupants.

6. Capitalize on the building’s strengths.

7. Determine what features can and should be saved.

8. Enhance the property’s curb appeal and interior finishes.

9. Have a clear picture of who the potential tenants might be, and design for their needs.

10. Don’t try to do everything at once. 

11. Make sustainability part of the process.

View all 11 tips on one page.

Related Stories

Building Team Awards | Apr 10, 2015

New arts venue reinvigorates Virginia Tech's campus

The STV-led Building Team creates a world-class performance and arts venue with learning and entrepreneurial dimensions.

BIM and Information Technology | Apr 9, 2015

A carboard box by Google can bring virtual reality to architecture

The global search engine giant has launched a new product, Google Cardboard, that easily allows users to experience virtual reality.

Building Team Awards | Apr 9, 2015

Multifaced fitness center becomes campus landmark

A sloped running track and open-concept design put this Building Team to the test. 

Building Team Awards | Apr 9, 2015

Nation's first LEED-certified bus depot

A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.

Building Team Awards | Apr 9, 2015

Setting the bar for port-of-entry design

Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.

Building Team Awards | Apr 9, 2015

Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C

Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.

Building Team Awards | Apr 9, 2015

IPD-driven fusion facility serves science and student life in Chicago

In dire need of modern science labs and a student union, North Park University built both—in the same building.

Building Team Awards | Apr 9, 2015

‘Prudent, not opulent’ sets the tone for this Catholic hospital

This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.

Building Team Awards | Apr 9, 2015

9/11 museum triumphs over controversy

The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.

Building Team Awards | Apr 7, 2015

Unique test facility will help make wind power more feasible

A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021