flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

11 Tips for Breathing New Life into Old Office Spaces

11 Tips for Breathing New Life into Old Office Spaces

With the slowdown in new office building construction across the country, many design and construction firms are turning their attention to office building reconstruction and interior renovations—something Cincinnati-based Hixson Architecture Engineering Interiors has been doing since its founding, in 1948.


By By Robert Cassidy, Editorial Director | November 2, 2010
This article first appeared in the November 2010 issue of BD+C.

Building Design+Construction talked to experts from Hixson Architecture Engineering Interiors for their advice on renovating whole office buildings and office interiors: Colleen McCafferty, LEED AP, Corporate Interiors Team Leader; Bruce F. Mirrielees, AIA, SVP of Project Management; and John Hudson, Director of Client Development. Here are 11 lessons from their experience that may help you in planning your clients’ next office renovation projects.

11 Tips for Office Renovation Success

1. Ask the hard bottom-line questions first.

2. Take a realistic look at the surrounding neighborhood.

3. Look for local or regional economic incentives.

4. Develop an exit strategy for the property.

5. Create a communication plan for the current occupants.

6. Capitalize on the building’s strengths.

7. Determine what features can and should be saved.

8. Enhance the property’s curb appeal and interior finishes.

9. Have a clear picture of who the potential tenants might be, and design for their needs.

10. Don’t try to do everything at once. 

11. Make sustainability part of the process.

View all 11 tips on one page.

Related Stories

| May 30, 2012

Boral Bricks announces winners of “Live.Work.Learn” student architecture contest

Eun Grace Ko, a student at the Ryerson University in Toronto, Canada, named winner of annual contest.

| May 30, 2012

Hill International to manage construction of Al Risafa Stadium in Iraq

The three-year contract has an estimated value to Hill of approximately $3.3 million.

| May 29, 2012

Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos

McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 29, 2012

AIA expands Documents-On-Demand service??

Six new documents added, DOD offers nearly 100 contract documents.  

| May 29, 2012

Legrand achieves over 20% energy-intensity reduction in Presidential Challenge

West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 24, 2012

Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors

Anticipating increasing escalation in owner costs through 2014.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021