This year marked BD+C's 21st annual Building Team Awards. The submissions were judged based on two criteria:
- Design/engineering/construction quality and excellence (50%)
- How the Building Team (architects, engineers, contractors, CMs, subcontractors, building owners, developers, government entities, etc.) collaborated to overcome obstacles and make the project succeed (50%)
Platinum
Isaac Maiselman Photography.
1. McCormick Square
2. Iowa Correctional Institution for Women
Gold
Bruce Damonte, courtesy SOM.
1. San Diego Central Courthouse
2. United States Tennis Association National Campus
3. Cleveland Clinic Taussig Cancer Center
4. Nursing and Science Building at Rutgers University
Silver
Benjamin Benschneider Photography.
1. Park West
2. Everett University Center at Washington State University
3. Wilshire Grand Center
4. The Spark at Washington State University
Bronze
Verny Capital / Astana Property Management.
1. Talan Towers
2. Wentz Science Center at North Central College
Honorable Mention
Photo: Celso Rojas.
1. Janet Durgin Guild and Commons at Sonoma Academy
Judges
Dan Ulbricht
Vice President
Skender
Chicago
Jennifer Suerth, LEED AP
Vice PResident, Technical Services
Pepper Construction Group
Chicago
Beau Sanders, PE, SE
Project Manager, Associate
GRAEF
Milwaukee, Wis.
Anantha Chittur, PE
Senior Associate
BASE
Chicago
Edoarda Corradi Dell'Acqua
Adjunct Professor
Illinois Institute of Technology
Chicago
The 2018 Building Team Awards jury convened on march 27 at the Cliff Dwellers club in Chicago to judge the 21st annual awards program.
Related Stories
Building Team Awards | Apr 9, 2015
IPD-driven fusion facility serves science and student life in Chicago
In dire need of modern science labs and a student union, North Park University built both—in the same building.
Building Team Awards | Apr 9, 2015
‘Prudent, not opulent’ sets the tone for this Catholic hospital
This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.
Building Team Awards | Apr 9, 2015
9/11 museum triumphs over controversy
The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.
Building Team Awards | Apr 7, 2015
Unique test facility will help make wind power more feasible
A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.
Building Team Awards | Apr 5, 2015
UK's leading foot and mouth disease lab turns containment design inside out
A daring Building Team breaks the bunker mentality common to research containment with this light-filled, open facility in the English countryside.
Building Team Awards | Apr 5, 2015
‘Project first’ philosophy shows team’s commitment to a true IPD on the San Carlos Center
Skanska and NBBJ join forces with Sutter Health on a medical center project where all three parties share the risk.