flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

15 stellar historic preservation, adaptive reuse, and renovation projects

15 stellar historic preservation, adaptive reuse, and renovation projects

Meet the winners of Building Design+Construction's 2013 Reconstruction Awards


By BD+C Editor | October 30, 2013
Historic preservation adaptive reuse project: 510 Fifth Reno
Historic preservation adaptive reuse project: 510 Fifth Reno

The winners of the 2013 Reconstruction Awards showcase the best work of distinguished Building Teams, encompassing historic preservation, adaptive reuse, and renovations and additions.

 

 

 

 

 

Platinum Awards

 

Nation's first glass curtain wall exterior restored in San Francisco

The Hallidie Building's glass-and-steel skin is generally recognized as the forerunner of today’s curtain wall facilities. Read the story.
 
 
 
 

 

High-rise Art Deco courthouse gets a makeover in Amarillo, Texas

Recognized as one of the most significant Art Deco courthouses in Texas, the Potter County Courthouse is modernized and restored to its 1930s aesthetic. Read the story.
 
 
 
 

 

Toronto Maple Leafs arena converted to university recreation facility

Using steel reinforcement and massive box trusses, a Building Team methodically inserts four new floors in the landmark arena while preserving and restoring its historic exterior. Read the story.
 
 
 

 

Gold Awards

Cass Gilbert's landmark St. Louis Central Library gets a reboot

A $70 million project returns large sections of the building to their original Beaux Arts beauty, while modernizing the spaces to make them more inviting and useful for today’s patrons. Read the story.
 
 
 
 

From power plant to office: Ambler Boiler House conversion

The shell of a 19th-century industrial plant is converted into three levels of modern office space. Read the story.
 
 
 
 
 

SOM gets second crack at iconic modernist structure in New York

More than 50 years after SOM completed the Manufacturers Hanover Trust building, the firm is asked to restore and modernize the space. Read the story.
 
 
 
 
 

Statue of Liberty update brings patrons closer to the action

While past renovation and restoration work on Liberty Island received more fanfare, the latest update arguably has had a greater impact on the three million people that visit the monument each year. Read the story.
 
 
 

 

Silver Awards

 

Manhattan's landmark Marble Collegiate Church modernized

Marble Collegiate Church, built in 1854 on a dirt road, is now surrounded by a densely populated Manhattan neighborhood. Gaining national recognition during the 52-year tenure of Norman Vincent Peale, the Romanesque Revival landmark still serves more than 2,200 congregants. Read the story.
 
 
 
 
 

Everyman Theatre, Baltimore, Md.

The Baltimore structure that opened as the Empire Theatre in 1911 has seen stints as a vaudeville house, burlesque theater, cinema, bingo parlor, boxing venue, adult-movie theater, and parking garage. In 1990, the dilapidated building was abandoned. Everyman Theatre—a professional repertory company—took possession 16 years later through a $1 transfer from the Bank of America and the Harold A. Dawson Trust. Read the story. (TO COME)
 
 
 
 
 

Conrad B. Duberstein U.S. Bankruptcy Courthouse, Brooklyn, N.Y.

The narrative of this exterior restoration centers on the sheer scale of the project. The six-year, $61.7 million effort involved meticulously inspecting, cataloging, and restoring more than 75,000 sf of granite and terra cotta cladding. Read the story. (TO COME)
 
 
 
 
 

Thomas P. O’Neill Jr. Federal Building, Washington, D.C.

The District of Columbia, famed for neoclassical landmarks, also has its share of modernist behemoths. The Thomas P. O’Neill Jr. Federal Building is typical—more than half a million square feet in a nine-story structure occupying most of a city block. Built in 1965 for the FDA, the laboratory facility was recently transformed into green, Class A office space for several federal tenants, incorporating some bold interior changes and a thoughtful exterior upgrade. Read the story. (TO COME)
 
 
 
 
 

Paramount Theatre, Cedar Rapids, Iowa

In Stephen Sondheim’s musical “Follies,” an aging chorine sings of life’s ups and downs, punctuated by the refrain “I’m still here.” The phrase would be a fitting theme for the Paramount Theatre of Cedar Rapids, Iowa—a beloved building that has survived an entertainment revolution, economic upheavals, and a natural disaster. Read the story. (TO COME)
 
 
 

 

Bronze Awards

 

Oregon Department of Transportation, Salem, Ore.

Oregon’s Department of Transportation occupies one of the last state government facilities in Salem to receive an energy and seismic retrofit. The 1951 structure has been transformed with a reconstruction that significantly improved efficiency and occupant comfort. Read the story. (TO COME)
 
 
 
 
 

Wrigley Building, Chicago

The Wrigley Building, erected in two phases in the early 1920s, has always been a jewel of Chicago’s busy Michigan Avenue. The building’s two towers are connected by a 14th-floor bridge, but few passersby would know that the original design intent was to have an open plaza between the towers. Read the story. (TO COME)
 
 
 

 

Special Recognition

 

‘Daylighting’ the Saw Mill River at Larkin Plaza, Yonkers, N.Y.

A “daylighting” plan uncovered the Saw Mill River and made it the centerpiece of a new public park, restoring a long-absent feature of downtown Yonkers, N.Y. Read the story. (TO COME)
 
 
 

 

2013 Reconstruction Awards Judges

 
 
Judges for Building Design+Construction’s 30th Annual Reconstruction Awards (left to right): Bonnie McDonald, K. Nam Shiu, Rick Juneau, Daniel Doyle, Walker Johnson, Stephen Martinez, Gary Keclik. Not pictured: Martha Bell
 
 
HONORARY CHAIR
Walker C. Johnson, FAIA
Principal
Johnson Lasky Architects
Chicago, Ill.
 
DISTINGUISHED MEMBERS
Martha Bell, FAIA, LEED AP
Principal
Tilton, Kelly + Bell
Chicago, Ill.
 
Daniel L. Doyle, PE, LEED AP O+M
President
Grumman/Butkus Associates
Evanston, Ill.
 
Rick Juneau, LEED AP
President, Residential & Restoration
Bulley & Andrews
Chicago, Ill.
Gary B. Keclik, AIA, CSI, GGA, LEED AP
Principal Architect
Keclik Associates
Hoffman Estates, Ill.
 
Stephen L. Martinez, LEED AP
Senior VP,  Project Management & Development Services
Transwestern
Chicago, Ill.
 
Bonnie McDonald
President
Landmarks Illinois
Chicago, Ill.
 
K. Nam Shiu, SE, PE
Senior VP, Director of Restoration Services
Walker Restoration Consultants
Chicago, Ill.

Related Stories

| Nov 17, 2014

Mastering natural ventilation: 5 crucial lessons from design experts

By harnessing natural ventilation, Building Teams can achieve a tremendous reduction in energy use and increase in occupant comfort. Engineers from SOM offer lessons from the firm’s recent work.

| Nov 14, 2014

Bjarke Ingels unveils master plan for Smithsonian's south mall campus

The centerpiece of the proposed plan is the revitalization of the iconic Smithsonian castle.

| Nov 14, 2014

Haskell acquires FreemanWhite, strengthens healthcare design-build business

The combination expands Haskell’s geographic presence by adding FreemanWhite’s offices in Chicago, Charlotte, Nashville, and San Diego. FreemanWhite will retain its name and brand.

| Nov 14, 2014

What college students want in their living spaces

In a recent workshop with 62 college students, architects from Little explored the changing habits and preferences of today's students, and how those changes affect their living spaces.

| Nov 14, 2014

JetBlue opens Gensler-designed International Concourse at JFK

The 175,000-sf extension includes the conversion of three existing gates to international swing gates, and the addition of three new international swing gates.

Sponsored | | Nov 12, 2014

Eye-popping façade highlights renovation, addition at Chaffin Junior High School

The new distinctive main entrance accentuates the public face of the school with an aluminum tube “baguette” system. 

| Nov 12, 2014

Collaboration as competitive advantage

A collaborative planning and design process may seem like a common-sense goal, but the concept can be a challenge to achieve in the fragmented AEC industry. SPONSORED BLOG

Sponsored | | Nov 12, 2014

Williams Scotsman plugs into the jobsite

Many of our customers conduct important business from their temporary modular jobsite office and most require access to technology to get their job done effectively and efficiently. SPONSORED CONTENT

| Nov 12, 2014

Chesapeake Bay Foundation completes uber-green Brock Environmental Center, targets Living Building certification

More than a decade after opening its groundbreaking Philip Merrill Environmental Center, the group is back at it with a structure designed to be net-zero water, net-zero energy, and net-zero waste.

| Nov 12, 2014

Refocusing the shifted line

A recent trend in the practice of architecture that I’ve been noticing is the blurring of responsibility between design and construction coordination. I’m not sure why this trend began, but the subject is worth exploring, writes FXFOWLE's Mark Nusbaum.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021