15 stellar historic preservation, adaptive reuse, and renovation projects

15 stellar historic preservation, adaptive reuse, and renovation projects

Meet the winners of Building Design+Construction's 2013 Reconstruction Awards


By BD+C Editor | October 30, 2013
Historic preservation adaptive reuse project: 510 Fifth Reno
Historic preservation adaptive reuse project: 510 Fifth Reno

The winners of the 2013 Reconstruction Awards showcase the best work of distinguished Building Teams, encompassing historic preservation, adaptive reuse, and renovations and additions.

 

 

 

 

 

Platinum Awards

 

Nation's first glass curtain wall exterior restored in San Francisco

The Hallidie Building's glass-and-steel skin is generally recognized as the forerunner of today’s curtain wall facilities. Read the story.
 
 
 
 

 

High-rise Art Deco courthouse gets a makeover in Amarillo, Texas

Recognized as one of the most significant Art Deco courthouses in Texas, the Potter County Courthouse is modernized and restored to its 1930s aesthetic. Read the story.
 
 
 
 

 

Toronto Maple Leafs arena converted to university recreation facility

Using steel reinforcement and massive box trusses, a Building Team methodically inserts four new floors in the landmark arena while preserving and restoring its historic exterior. Read the story.
 
 
 

 

Gold Awards

Cass Gilbert's landmark St. Louis Central Library gets a reboot

A $70 million project returns large sections of the building to their original Beaux Arts beauty, while modernizing the spaces to make them more inviting and useful for today’s patrons. Read the story.
 
 
 
 

From power plant to office: Ambler Boiler House conversion

The shell of a 19th-century industrial plant is converted into three levels of modern office space. Read the story.
 
 
 
 
 

SOM gets second crack at iconic modernist structure in New York

More than 50 years after SOM completed the Manufacturers Hanover Trust building, the firm is asked to restore and modernize the space. Read the story.
 
 
 
 
 

Statue of Liberty update brings patrons closer to the action

While past renovation and restoration work on Liberty Island received more fanfare, the latest update arguably has had a greater impact on the three million people that visit the monument each year. Read the story.
 
 
 

 

Silver Awards

 

Manhattan's landmark Marble Collegiate Church modernized

Marble Collegiate Church, built in 1854 on a dirt road, is now surrounded by a densely populated Manhattan neighborhood. Gaining national recognition during the 52-year tenure of Norman Vincent Peale, the Romanesque Revival landmark still serves more than 2,200 congregants. Read the story.
 
 
 
 
 

Everyman Theatre, Baltimore, Md.

The Baltimore structure that opened as the Empire Theatre in 1911 has seen stints as a vaudeville house, burlesque theater, cinema, bingo parlor, boxing venue, adult-movie theater, and parking garage. In 1990, the dilapidated building was abandoned. Everyman Theatre—a professional repertory company—took possession 16 years later through a $1 transfer from the Bank of America and the Harold A. Dawson Trust. Read the story. (TO COME)
 
 
 
 
 

Conrad B. Duberstein U.S. Bankruptcy Courthouse, Brooklyn, N.Y.

The narrative of this exterior restoration centers on the sheer scale of the project. The six-year, $61.7 million effort involved meticulously inspecting, cataloging, and restoring more than 75,000 sf of granite and terra cotta cladding. Read the story. (TO COME)
 
 
 
 
 

Thomas P. O’Neill Jr. Federal Building, Washington, D.C.

The District of Columbia, famed for neoclassical landmarks, also has its share of modernist behemoths. The Thomas P. O’Neill Jr. Federal Building is typical—more than half a million square feet in a nine-story structure occupying most of a city block. Built in 1965 for the FDA, the laboratory facility was recently transformed into green, Class A office space for several federal tenants, incorporating some bold interior changes and a thoughtful exterior upgrade. Read the story. (TO COME)
 
 
 
 
 

Paramount Theatre, Cedar Rapids, Iowa

In Stephen Sondheim’s musical “Follies,” an aging chorine sings of life’s ups and downs, punctuated by the refrain “I’m still here.” The phrase would be a fitting theme for the Paramount Theatre of Cedar Rapids, Iowa—a beloved building that has survived an entertainment revolution, economic upheavals, and a natural disaster. Read the story. (TO COME)
 
 
 

 

Bronze Awards

 

Oregon Department of Transportation, Salem, Ore.

Oregon’s Department of Transportation occupies one of the last state government facilities in Salem to receive an energy and seismic retrofit. The 1951 structure has been transformed with a reconstruction that significantly improved efficiency and occupant comfort. Read the story. (TO COME)
 
 
 
 
 

Wrigley Building, Chicago

The Wrigley Building, erected in two phases in the early 1920s, has always been a jewel of Chicago’s busy Michigan Avenue. The building’s two towers are connected by a 14th-floor bridge, but few passersby would know that the original design intent was to have an open plaza between the towers. Read the story. (TO COME)
 
 
 

 

Special Recognition

 

‘Daylighting’ the Saw Mill River at Larkin Plaza, Yonkers, N.Y.

A “daylighting” plan uncovered the Saw Mill River and made it the centerpiece of a new public park, restoring a long-absent feature of downtown Yonkers, N.Y. Read the story. (TO COME)
 
 
 

 

2013 Reconstruction Awards Judges

 
 
Judges for Building Design+Construction’s 30th Annual Reconstruction Awards (left to right): Bonnie McDonald, K. Nam Shiu, Rick Juneau, Daniel Doyle, Walker Johnson, Stephen Martinez, Gary Keclik. Not pictured: Martha Bell
 
 
HONORARY CHAIR
Walker C. Johnson, FAIA
Principal
Johnson Lasky Architects
Chicago, Ill.
 
DISTINGUISHED MEMBERS
Martha Bell, FAIA, LEED AP
Principal
Tilton, Kelly + Bell
Chicago, Ill.
 
Daniel L. Doyle, PE, LEED AP O+M
President
Grumman/Butkus Associates
Evanston, Ill.
 
Rick Juneau, LEED AP
President, Residential & Restoration
Bulley & Andrews
Chicago, Ill.
Gary B. Keclik, AIA, CSI, GGA, LEED AP
Principal Architect
Keclik Associates
Hoffman Estates, Ill.
 
Stephen L. Martinez, LEED AP
Senior VP,  Project Management & Development Services
Transwestern
Chicago, Ill.
 
Bonnie McDonald
President
Landmarks Illinois
Chicago, Ill.
 
K. Nam Shiu, SE, PE
Senior VP, Director of Restoration Services
Walker Restoration Consultants
Chicago, Ill.

Related Stories

| Feb 11, 2011

RS Means Cost Comparison Chart: Office Buildings

This month's RS Means Cost Comparison Chart focuses on office building construction.

| Feb 11, 2011

Sustainable features on the bill for dual-building performing arts center at Soka University of America

The $73 million Soka University of America’s new performing arts center and academic complex recently opened on the school’s Aliso Viejo, Calif., campus. McCarthy Building Companies and Zimmer Gunsul Frasca Architects collaborated on the two-building project. One is a three-story, 47,836-sf facility with a grand reception lobby, a 1,200-seat auditorium, and supports spaces. The other is a four-story, 48,974-sf facility with 11 classrooms, 29 faculty offices, a 150-seat black box theater, rehearsal/dance studio, and support spaces. The project, which has a green roof, solar panels, operable windows, and sun-shading devices, is going for LEED Silver.

| Feb 11, 2011

BIM-enabled Texas church complex can broadcast services in high-def

After two years of design and construction, members of the Gateway Church in Southland, Texas, were able to attend services in their new 4,000-seat facility in late 2010. Located on a 180-acre site, the 205,000-sf complex has six auditoriums, including a massive 200,000-sf Worship Center, complete with catwalks, top-end audio and video system, and high-definition broadcast capabilities. BIM played a significant role in the building’s design and construction. Balfour Beatty Construction and Beck Architecture formed the nucleus of the Building Team.

| Feb 11, 2011

Kentucky’s first green adaptive reuse project earns Platinum

(FER) studio, Inglewood, Calif., converted a 115-year-old former dry goods store in Louisville, Ky., into a 10,175-sf mixed-use commercial building earned LEED Platinum and holds the distinction of being the state’s first adaptive reuse project to earn any LEED rating. The facility, located in the East Market District, houses a gallery, event space, offices, conference space, and a restaurant. Sustainable elements that helped the building reach its top LEED rating include xeriscaping, a green roof, rainwater collection and reuse, 12 geothermal wells, 81 solar panels, a 1,100-gallon ice storage system (off-grid energy efficiency is 68%) and the reuse and recycling of construction materials. Local firm Peters Construction served as GC.

| Feb 11, 2011

Former Richardson Romanesque hotel now houses books, not beds

The Piqua (Ohio) Public Library was once a late 19th-century hotel that sat vacant and deteriorating for years before a $12.3 million adaptive reuse project revitalized the 1891 building. The design team of PSA-Dewberry, MKC Associates, and historic preservation specialist Jeff Wray Associates collaborated on the restoration of the 80,000-sf Richardson Romanesque building, once known as the Fort Piqua Hotel. The team restored a mezzanine above the lobby and repaired historic windows, skylight, massive fireplace, and other historic details. The basement, with its low ceiling and stacked stone walls, was turned into a castle-like children’s center. The Piqua Historical Museum is also located within the building.

| Feb 11, 2011

Justice center on Fall River harbor serves up daylight, sustainable elements, including eucalyptus millwork

Located on historic South Main Street in Fall River, Mass., the Fall River Justice Center opened last fall to serve as the city’s Superior and District Courts building. The $85 million facility was designed by Boston-based Finegold Alexander + Associates Inc., with Dimeo Construction as CM and Arup as MEP. The 154,000-sf courthouse contains nine courtrooms, a law library, and a detention area. Most of the floors have the same ceiling height, which will makes them easier to reconfigure in the future as space needs change. Designed to achieve LEED Silver, the facility’s elliptical design offers abundant natural daylight and views of the harbor. Renewable eucalyptus millwork is one of the sustainable features.

| Feb 11, 2011

Research facility separates but also connects lab spaces

California State University, Northridge, consolidated its graduate and undergraduate biology and mathematics programs into one 90,000-sf research facility. Architect of record Cannon Design worked on the new Chaparral Hall, creating a four-story facility with two distinct spaces that separate research and teaching areas; these are linked by faculty offices to create collaborative spaces. The building houses wet research, teaching, and computational research labs, a 5,000-sf vivarium, classrooms, and administrative offices. A four-story outdoor lobby and plaza and an outdoor staircase provide orientation. A covered walkway links the new facility with the existing science complex. Saiful/Bouquet served as structural engineer, Bard, Rao + Athanas Consulting Engineers served as MEP, and Research Facilities Design was laboratory consultant.

| Feb 11, 2011

A feast of dining options at University of Colorado community center, but hold the buffalo stew

The University of Colorado, Boulder, cooked up something different with its new $84.4 million Center for Community building, whose 900-seat foodservice area consists of 12 micro-restaurants, each with its own food options and décor. Centerbrook Architects of Connecticut collaborated with Denver’s Davis Partnership Architects and foodservice designer Baker Group of Grand Rapids, Mich., on the 323,000-sf facility, which also includes space for a career center, international education, and counseling and psychological services. Exterior walls of rough-hewn, variegated sandstone and a terra cotta roof help the new facility blend with existing campus buildings. Target: LEED Gold.

| Feb 11, 2011

Chicago high-rise mixes condos with classrooms for Art Institute students

The Legacy at Millennium Park is a 72-story, mixed-use complex that rises high above Chicago’s Michigan Avenue. The glass tower, designed by Solomon Cordwell Buenz, is mostly residential, but also includes 41,000 sf of classroom space for the School of the Art Institute of Chicago and another 7,400 sf of retail space. The building’s 355 one-, two-, three-, and four-bedroom condominiums range from 875 sf to 9,300 sf, and there are seven levels of parking. Sky patios on the 15th, 42nd, and 60th floors give owners outdoor access and views of Lake Michigan.

| Feb 11, 2011

Iowa surgery center addresses both inpatient and outpatient care

The 12,000-person community of Carroll, Iowa, has a new $28 million surgery center to provide both inpatient and outpatient care. Minneapolis-based healthcare design firm Horty Elving headed up the four-story, 120,000-sf project for St. Anthony’s Regional Hospital. The center’s layout is based on a circular process flow, and includes four 800-sf operating rooms with poured rubber floors to reduce leg fatigue for surgeons and support staff, two substerile rooms between each pair of operating rooms, and two endoscopy rooms adjacent to the outpatient prep and recovery rooms. Recovery rooms are clustered in groups of four. The large family lounge (left) has expansive windows with views of the countryside, and television monitors that display coded information on patient status so loved ones can follow a patient’s progress.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021