flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

2012 LEED for Homes Award recipients announced

2012 LEED for Homes Award recipients announced

USGBC recognizes excellence in the green residential building community at its Greenbuild Conference & Expo in San Francisco


By Posted by Tim Gregorski, Senior Editor | November 13, 2012

The U.S. Green Building Council (USGBC) has named the recipients of the 2012 LEED for Homes Awards, recognizing projects, developers and homebuilders that have demonstrated leadership in the residential green building marketplace. The awards will be presented during the Residential Summit reception on Thursday, Nov. 15, 2012, at the Greenbuild International Conference & Expo held in San Francisco. The award categories recognize innovative multi- and single-family projects, production builders, affordable housing projects and developers, an overall commitment to LEED for Homes and Project of the Year.

“This year’s leadership recipients represent a dynamic field showcasing the range of residential developments that certify under USGBC’s LEED for Homes program each year,” said Nate Kredich, vice president, Residential Market Development, USGBC. “The fact that our project of the year is an affordable housing development that achieved LEED Platinum certification is a shining example of how diversified the LEED for Homes portfolio has become.”

Winners for this year include:

  • Project of the Year – The Puyallup Longhouse’s the Place of Hidden Waters: This LEED Platinum certified housing project is a culturally and environmentally responsive new model for the Puyallup Tribe in the Pacific NW. It’s located on the Puyallup reservation on a hill overlooking the Puget Sound tide flats, which were traditional Puyallup tribal lands. The buildings are designed to emulate the rectangular, shed roofed form of a traditional Coast Salish longhouse using a variation of the modern townhouse courtyard building. Structural insulated panels with excellent air sealing for a well-insulated envelope, triple pane windows and ground source heat pumps for both domestic hot water and hydronic heating systems are some of the sustainable features.
  • Outstanding Production Builder – Clarum Communities for Cambridge Plaza: Located in Palo Alto, Calif., Cambridge Plaza is a three-story townhome project constructed by Clarum Homes that achieved a LEED Platinum rating thanks to sustainable building materials and a commitment to energy and water efficiency. Its “smart” design features include a photovoltaic system and a thermal solar hot water system using a 80 gallon pre-heat storage tank and a G.E. GeoSpring electric heat pump back up waterheater.
  • Outstanding Affordable Developer - Avesta Housing for Oak Street Lofts: This project is the first affordable multifamily building to achieve LEED Platinum in Maine. The building is a four-story, 37-unit building located in the heart of Portland's Art District. The project stands out as it incorporates many design innovations, which illustrate that even affordable housing projects, with limited capital budgets, can achievehigh rates of energy efficiency and enhanced comfort for occupants. The building achieved a preliminary energy savings of 35 percent better than ASHRAE with a 40.94 percent energy cost savings.
  • Outstanding Affordable Project – Rio Vista Apartments, Abode Communities: This is the first development in LA County to co-locate affordable housing with an educational component owned and operated by the Los Angeles Unified School District on the District’s surplus land. The LEED Platinum apartments transform a vacant parking lot into a model joint-use development addressing the needs of 50 low-income families. The site is a high-density infill, a former brownfield with existing infrastructure, and is located with access to outstanding community resources. Rio Vista is energy efficient (exceeds Title 24 by 40 percent) and includes an edible garden atop the roof with a central trellised courtyard providing a shaded outdoor space to reduce heat island effects.
  • Outstanding Commitment to LEED for Homes – McGuyer Homebuilders, Inc. (MHI): The Texas-based company is the only national-scale production homebuilder that has successfully implemented LEED for Homes across multiple communities and across multiple product offerings. MHI is a practical, profit-oriented builder who pursues LEED as a strategy to meet client needs. MHI strives to find ways to successfully compete with the publically traded homebuilding companies by offering something new and different.
  • Outstanding Multifamily Project – Specialized Real Estate Group for Eco Modern Flats: This LEED Platinum project is a gut rehab of a 96-unit market rate apartment complex built between 1968 and1972 and located in Fayetteville, Ark. The developers’ goals were to deliver a product that was not currently available in the market—modern, urban, green multifamily rental—and to save operations costs through energy and water-saving updates. In addition to the rehab itself, a blog and other informational resources were developed, and hundreds of people toured a model unit highlighting 32 sustainable strategies employed in the project.
  • Outstanding Single Family Project – Brooks Residence (architect Isabelle Duvivier): Located in Venice, Calif., the Brooks Residence is a 1,700 sq. ft. LEED Platinum home. Homeowner and architect, Isabelle Duvivier, purchased the 100-year-old home in a well-established, low-income neighborhood in order to restore it. The goal was to reduce the footprint/impact of the house on the planet through water, energy and material efficiency. Above and beyond that goal, the home designworks to restore habitats for birds, bees and butterflies and creates educational opportunities for the local community. +

Related Stories

Student Housing | Apr 19, 2024

$115 million Cal State Long Beach student housing project will add 424 beds

A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.

Construction Costs | Apr 18, 2024

New download: BD+C's April 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.

MFPRO+ New Projects | Apr 16, 2024

Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn

The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.

Construction Costs | Apr 16, 2024

How the new prevailing wage calculation will impact construction labor costs

Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.

Healthcare Facilities | Apr 16, 2024

Mexico’s ‘premier private academic health center’ under design

The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.

Market Data | Apr 16, 2024

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024

Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.

Laboratories | Apr 15, 2024

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.

Codes and Standards | Apr 12, 2024

ICC eliminates building electrification provisions from 2024 update

The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.

Urban Planning | Apr 12, 2024

Popular Denver e-bike voucher program aids carbon reduction goals

Denver’s e-bike voucher program that helps citizens pay for e-bikes, a component of the city’s carbon reduction plan, has proven extremely popular with residents. Earlier this year, Denver’s effort to get residents to swap some motor vehicle trips for bike trips ran out of vouchers in less than 10 minutes after the program opened to online applications.

Laboratories | Apr 12, 2024

Life science construction completions will peak this year, then drop off substantially

There will be a record amount of construction completions in the U.S. life science market in 2024, followed by a dramatic drop in 2025, according to CBRE. In 2024, 21.3 million sf of life science space will be completed in the 13 largest U.S. markets. That’s up from 13.9 million sf last year and 5.6 million sf in 2022.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021