flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

2019 Data Center Giants Report: AEC firms stretch to keep up with data center demand

Giants 400

2019 Data Center Giants Report: AEC firms stretch to keep up with data center demand

This and more data center sector trends from Building Design+Construction's 2019 Giants 300 Report. 


By John Caulfield, Senior Editor  | August 28, 2019
2019 Data Center Giants Report DPR - Digital realty Ashburn, Va Photo Ulf Wallin

Last January, Digital Realty opened a 230,000-sf data center in Ashburn, Va., one of this sector’s most robust zones. Built by DPR Construction using concrete tilt-up panels, this was the Digital Realty’s first deployment of its mega-scale prototype, and the time from groundbreaking to IST/Occupancy took only eight months. Phase 1 includes a 6-MW data hall, the first of six halls with equal critical power planned over the data center’s three-year buildout period. Photo: Ulf Wallin

  

In 2018, Holder Construction did $1.38 billion in data center construction. As of May 2019, it had 28 data center projects in the works, and the firm expects construction this year to approach $3 billion. One such project—in Phoenix, for a large REIT—opened in July 2019 with 6 MW of processing capacity, and will reach 48 MW when it’s eventually built out to around 500,000 sf.

To keep pace with this sector’s expansion, Holder is increasing its headcount by 25%. “The AEC industry is very close to being overwhelmed by data center demand, especially for electricians,” says Tony TeVault, Vice President with Holder’s office in Atlanta. “Every market is at full capacity and equipment vendors are super-stretched.”

Data center sector growth is creating opportunities for AEC firms, as owners scramble to build facilities as fast as they can. “Speed to market” is this sector’s abiding objective, in part to accommodate looming 5G technology.

 

ALSO SEE: Top 35 Data Center Architecture Firms
ALSO SEE: Top 50 Data Center Engineering Firms
ALSO SEE: Top 45 Data Center Construction Firms

 

“As soon as a client receives a positive capacity demand signal in a region, the race is on to design and build a data center at rapid pace,” says James Coe, PE, Senior Principal with Syska Hennessy, whom BD+C interviewed with Joshua Fluecke, PE, LEED AP, Associate Principal. They note that engineering design teams are under pressure to adapt a provider’s prescriptive design within an eight- to 12-week window, and to offer construction administration support for an accelerated build schedule that typically falls between seven and nine months.

“Contractors need to use every tool at their disposal to ensure just-in-time delivery of materials and methods like prefabrication to shorten schedules,” says John Arcello, Advanced Tech Core Market Co-Leader with DPR Construction. “The magic will happen in the planning stages: preconstruction and VDC services have the tools to drive the process,” especially in design-build collaborations that he says are more common within this sector.

Another “tool” some AEC firms have availed themselves of is the acquisition of talent and market share to serve a consolidating sector with fewer and bigger players. Last December, the engineering firm Morrison Hershfield merged with CCG Facilities, a mission-critical engineering firm. And last March, HED joined forces with the data-center specialty firm IDG.

 

Hyperscale and edge data center facilities prevail

The sector is polarized between two dominant building types: massive hyperscale facilities and much smaller data centers for edge computing, which are usually located near population centers to ensure smooth content delivery.

Hyperscale data centers are simply getting bigger. Robert Sty, PE, LEED AP, Director of the Tech Sector for HDR, says that it wasn’t too long ago when data centers with 20 MW of capacity were considered large. Now, hyperscale campuses are being planned for 200 to 300 MW of power and millions of square feet. Gary Murphy, a Principal with HED, says data centers are being designed for 500+ MW. “Data centers are becoming more industrialized: as demand grows, so does their scale and performance.”

Water cooling for cabinets is becoming more prevalent, as owners push the envelope on higher allowable temperatures to lower their operational costs. Terence Deneny, Vice President of Structure Tone’s Mission Critical division, has seen some users locate IT racks in parking lots to test equipment tolerances and take advantage of free air cooling. Matt Lamont, HKS’s Vice President and Mission Critical Team Leader–America West Region, adds that a key discussion among clients revolves around driving the power usage effectiveness (PUE) ratio—the power entering the data center over the power used—to sub 1.15 levels.

These hyperscale facilities put pressure on local utilities to provide the power, water, and industrial wastewater required for their operations, says Ken Gilmartin, Jacobs’ Senior Vice President and GM–Advanced Facilities and Federal Solutions.

For one client, construction engineer McKinstry led the testing of four different power generation solutions within a live data center to determine the best solution for a rollout across multiple locations. (The client chose natural gas.) Dan Ronco, McKinstry’s Director of Electrical Construction, adds that more clients are considering renewable energy sources. He cautions, however, that “the hard part is making intermittent renewables work in critical, always-on environments.”

Edge computing facilities support the market’s time-critical functions (e.g., streaming). Coe of Syska Hennessy has seen micro data centers as small as one cabinet within a facility to 150 kW self-contained modular buildings. HKS’s Lamont says that the “maximum load” of edge centers his firm has worked on has been 1,000 kW, and they often run without human personnel.

“These types of facilities must be approached as a product design, and not as a custom solution for each location,” says Bruce Edwards, RA, a Principal with Morrison Hershfield. He elaborates that because edge data centers are pretty similar, their standardized design and construction lend themselves to prefabrication or modular options.

“Prefabrication and modular construction for data centers is becoming more consistent and reliable,” says Annette Allen, Fluor’s Vice President, Business Development–Life Sciences and Advanced Manufacturing. “They can reduce the amount of engineering required, and drive capital efficiencies, meaning cost and scheduling certainty.”

 

MORE FROM BD+C'S 2019 GIANTS 300 REPORT

Tags

Related Stories

Giants 400 | Sep 6, 2017

Top 55 university engineering firms

AECOM, Affiliated Engineers, and Arup top BD+C’s ranking of the nation’s largest university sector engineering and EA firms, as reported in the 2017 Giants 300 Report.

Giants 400 | Aug 29, 2017

Top 110 healthcare construction firms

Turner, McCarthy, and Skanska top BD+C’s ranking of the nation’s largest healthcare sector contractor and construction management firms, as reported in the 2017 Giants 300 Report.

Giants 400 | Aug 29, 2017

Top 80 healthcare engineering firms

WSP, AECOM, and KJWW top BD+C’s ranking of the nation’s largest healthcare sector engineering and EA firms, as reported in the 2017 Giants 300 Report.

Giants 400 | Aug 29, 2017

Top 125 healthcare architecture firms

HDR, HKS, and Perkins+Will top BD+C’s ranking of the nation’s largest healthcare sector architecture and AE firms, as reported in the 2017 Giants 300 Report.

Giants 400 | Aug 18, 2017

Life after Obamacare

Hospital systems are finding ways to get facilities built with a lot less money.

Giants 400 | Aug 16, 2017

Turning R&D into practice

Charlie Pankow’s mandate was simple: Use research to create even better buildings.

Giants 400 | Aug 14, 2017

U.S. engineering firms channel startup mentality to spark innovation

Here’s a recap of the noteworthy innovations reported by engineering and E/A firms as part of BD+C's Giants 300 survey process.

Giants 400 | Aug 11, 2017

Top 35 engineering/architecture firms

AECOM, WSP, and Thornton Tomasetti are among the nation’s largest engineering/architecture firms, according to Building Design+Construction’s 2017 Giants 300 Report.

Giants 400 | Aug 11, 2017

Top 60 engineering firms

Fluor, Arup, and Jensen Hughes top Building Design+Construction’s ranking of the largest engineering firms in the U.S., as reported in the 2017 Giants 300 Report.

Giants 400 | Aug 11, 2017

Top 60 construction management firms

Jacobs, Kraus-Anderson, and Hill International are among the nation’s largest construction management and project management firms, as reported in Building Design+Construction’s 2017 Giants 300 Report.

boombox1
boombox2
native1

More In Category




Giants 400

Call for surveys: 2024 Giants 400 Report

Building Design+Construction's annual Giants 400 Report ranks the nation's top architecture, architecture/engineering (AE), engineering/architecture (EA), general contractors, and fee-based construction management (CM) firms, by revenue. You’ll want to be sure your firm is on the Giants 400 lists, as potential clients look to these rankings for prospective firms to design and construct their future projects.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021