flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

2019 Healthcare Giants Report: The ‘smart hospital’ is on the horizon

Giants 400

2019 Healthcare Giants Report: The ‘smart hospital’ is on the horizon

These buildings perform functions like a medical practitioner. This and more healthcare sector trends from Building Design+Construction's 2019 Giants 300 Report. 


By Peter Fabris, Contributing Editor | August 16, 2019
Beverly Knight Olson Children’s Hospital, 2019 Healthcare Giants Report, 2019 Giants 300 Report, Robins Morton Mount Sinai Photo 3_Beverly Knight Olson Children’s Hospital exterior_Robins & Morton

The Beverly Knight Olson Children’s Hospital, built by Robins & Morton for Navicent Health. The five-story addition to The Medical Center of Macon, Ga., includes a new emergency center, imaging suites, a new pediatric unit, and a new 66-bed NICU and CCU. Photo: Tom Harris

  

Upgrades to medical equipment and systems and improvements to building systems are the current focus in the healthcare market.

Healthcare consolidation contributes to this trend. After larger health systems acquire smaller, rural facilities, there’s typically a push to renovate them and upgrade technology, says Robin Savage, President/COO, Robins & Morton. “A lot of this work is centered on diagnostic and imaging and service areas like women’s services,” says Savage.

The next big advancement: the so-called “smart hospital.” With multiple systems able to communicate with each other, such a building perform functions like another medical practitioner.

At the $1.6 billion Mackenzie Vaughan Hospital, now under construction in Toronto, building systems and medical technology will be linked. When a patient’s monitor detects a heart attack, it will send a silent alert to critical care response team members equipped with wearable location services badges. The badges will automatically override elevator controls, giving team members express service to the patient’s floor.

 

ALSO SEE: Top 150 Healthcare Architecture Firms
ALSO SEE: Top 90 Healthcare Engineering Firms
ALSO SEE: Top 100 Healthcare Construction Firms

 

Engineering giant WSP is examining ways to deploy Amazon Echo to aid HIPAA compliance and patient safety, says WSP’s Gary Hamilton, Senior Vice President and Eastern Healthcare Lead. Alerts could be sent to surgical recovery nurses every four hours to ensure that patients receive pain medication on time.

Smart hospitals will also boost energy efficiency. Artificial intelligence would analyze data from building management systems and scheduling software to determine how best to use space. Knowing that a patient was just discharged, smart building technology could turn down the HVAC in the empty room and punch it back up when the room is scheduled to be reoccupied. 

Using fiber optic systems throughout the building, MEP systems can be integrated with low-voltage systems such as AV and alarm systems. Once linked, these systems can enable smart hospital features. “In five years, the occupant-aware building is going to be commonplace in healthcare,” says Hamilton.

BIM and virtual reality are being used to analyze how healthcare medical professionals use space. “As we design key clinical spaces, we are mapping travel distances,” says Kate Renner, AIA, LEED AP BD+C, Design Researcher and Architect, HKS Inc. The data populates detailed behavior maps, which inform the creation of digital renderings that can be experienced in VR. 

HKS also creates full-scale cardboard mockups of key spaces such as inpatient rooms and surgical suites that provide valuable feedback from medical personnel on the positioning of equipment, cabinetry, and sinks.

Coping with natural disasters also figures into the early stages of programming and design. A sudden influx of patients from a hurricane, tornado, or earthquake could be accommodated if emergency rooms were equipped with double medical gas outlets in headwalls so that trauma victims could be doubled up in each room. Post-anesthesia care units outfitted with extra medical gas and headwall capacity could also function as emergency care units following a disaster, says Renner. 

Structural dampeners and reinforced stabilizers for overhead MEP systems are being required in earthquake-prone areas. After Mercy Hospital, Joplin, Mo., was destroyed by a tornado in 2011, collapsed MEP assemblies were found to be the major source of damage, says Renner. To make the replacement structure more resilient, the design also included reinforced stabilizers for the MEP systems, laminated safety glass, reinforced stairwells, battery-powered lights, and wall hooks that can be used to ease patients down stairs with sleds and ropes.

Owners of critical facilities have increased their supply of water storage and generator fuel, Hamilton says. The Veteran’s Administration now requires a two-week supply of water, not the previous one-week standard. 

 

Offsite construction ON THE UPSWING in healthcare sector

Prefab construction of mechanical systems continues to grow. “At least one headwall manufacturer is now including ductwork and insulation,” says Hamilton. “At most trade shows, we’re seeing four or five prefab bathroom manufacturers.” 

Prefab exterior wall systems are an increasingly compelling option, says Tim Johnson, Vice President/Division Manager, Brasfield & Gorrie. Evaluating prefab options is a task owners now count on their project teams to assess.

Lean construction is also in demand. “At least three out of four RFPs that we see address Lean management and Lean construction,” Savage says. Contractors must be involved earlier than ever to provide cost and constructability analysis. “Architects and GCs are now being selected at about the same time,” says Johnson.

“During pre-construction, owners require you to commit expensive and knowledgeable resources at the beginning—as much as 12 months before breaking ground,” says Savage. The extra effort does make for an improved architect-contractor relationship, says Hannah Wickham, Vice President, Business Development, Brasfield & Gorrie.

 

MORE FROM BD+C'S 2019 GIANTS 300 REPORT

Related Stories

Giants 400 | Oct 5, 2018

Top 85 State Government Architecture + AE Firms [2018 Giants 300 Report]

Stantec, SmithGroup, and LMN Architects top Building Design+Construction's ranking of the nation's largest state government sector architecture and architecture/engineering (AE) firms, as featured in the 2018 Giants 300 Report.

Giants 400 | Oct 5, 2018

Top 40 Federal Government Contractors + CM Firms [2018 Giants 300 Report]

BL Harbert, Fluor, and Webcor lead Building Design+Construction's ranking of the nation's largest federal government sector contractors and construction management (CM) firms, as featured in the 2018 Giants 300 Report.  

Giants 400 | Oct 5, 2018

Top 50 Federal Government Engineering + EA Firms [2018 Giants 300 Report]

Jacobs, AECOM, and Mason & Hanger head Building Design+Construction's ranking of the nation's largest federal government sector engineering and engineering/architecture (EA) firms, as featured in the 2018 Giants 300 Report.

Giants 400 | Oct 5, 2018

Top 60 Federal Government Architecture + AE Firms [2018 Giants 300 Report]

Page, HOK, and SOM top Building Design+Construction's ranking of the nation's largest federal government sector architecture and architecture/engineering (AE) firms, as featured in the 2018 Giants 300 Report.

Giants 400 | Oct 4, 2018

Top 90 Government Sector Contractors + CM Firms [2018 Giants 300 Report]

Turner, Clark Group, and Fluor lead Building Design+Construction's ranking of the nation's largest government sector contractors and construction management (CM) firms, as featured in the 2018 Giants 300 Report. 

Giants 400 | Oct 4, 2018

Top 85 Government Sector Engineering + EA Firms [2018 Giants 300 Report]

Jacobs, AECOM, and Dewberry head Building Design+Construction's ranking of the nation's largest government sector engineering and engineering/architecture (EA) firms, as featured in the 2018 Giants 300 Report.

Giants 400 | Oct 4, 2018

Top 155 Government Sector Architecture + AE Firms [2018 Giants 300 Report]

Stantec, HOK, and HDR top Building Design+Construction's ranking of the nation's largest government sector architecture and architecture/engineering (AE) firms, as featured in the 2018 Giants 300 Report.

Giants 400 | Oct 4, 2018

Top 70 Cultural Facilities Contractors + CM Firms [2018 Giants 300 Report]

Turner, Whiting-Turner, and Gilbane lead Building Design+Construction's ranking of the nation's largest cultural facilities contractors and construction management (CM) firms, as featured in the 2018 Giants 300 Report. 

Giants 400 | Oct 4, 2018

Top 70 Cultural Facilities Engineering + EA Firms [2018 Giants 300 Report]

Thornton Tomasetti and Morrison Hershfield head Building Design+Construction's ranking of the nation's largest cultural facilities engineering and engineering/architecture (EA) firms, as featured in the 2018 Giants 300 Report.

Giants 400 | Oct 4, 2018

Top 115 Cultural Facilities Architecture + AE Firms [2018 Giants 300 Report]

Gensler and Adrian Smith + Gordon Gill Architecture top Building Design+Construction's ranking of the nation's largest cultural facilities architecture and architecture/engineering (AE) firms, as featured in the 2018 Giants 300 Report.

boombox1
boombox2
native1

More In Category




Giants 400

Call for surveys: 2024 Giants 400 Report

Building Design+Construction's annual Giants 400 Report ranks the nation's top architecture, architecture/engineering (AE), engineering/architecture (EA), general contractors, and fee-based construction management (CM) firms, by revenue. You’ll want to be sure your firm is on the Giants 400 lists, as potential clients look to these rankings for prospective firms to design and construct their future projects.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021