flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

$27.5 million renovation of Salah Foundation Children’s Hospital completes in Fort Lauderdale

Healthcare Facilities

$27.5 million renovation of Salah Foundation Children’s Hospital completes in Fort Lauderdale

Skanska USA built the project.


By David Malone, Associate Editor | November 28, 2018
Nautical theme at Salah Foundation Children's Hospital

Courtesy Salah Foundation Children's Hospital

Beginning in 2015, the multi-phase $27.5 million renovation of the Salah Foundation Children’s Hospital at Broward Health Medical Center in Fort Lauderdale, Fla. saw the renovation of inpatient and outpatient areas in various pediatric units across the hospital.

The most significant aspect of the renovation was the addition of 30 private rooms to the Neonatal Intensive Care Unit (NICU), raising its total bed capacity to 63. The rooms were designed to create more space for patients, their families, and hospital staff. Additionally, 12 beds were added to the Pediatric Intensive Care Units, 20 to the Pediatric Step-down Units, and 12 to the Oncology and Hematology departments.

 

Patient room in Salah Foundation Children's HospitalCourtesy Salah Foundation Children's Hospital.

See Also: Orthopedic Associates of Hartford unveils plans for 45,000-sf surgical center

 

A nautical design theme connects all the new rooms throughout each department. This includes custom-built headwalls that feature different sea creatures such as seahorses, dolphins, and sea turtles. Themed play spaces for patients are also included.

Thanks to special precautions taken by Skanska USA during construction, such as utilizing the firms InSite Monitor app that tracks noise, vibration, dust, and differential pressure, the hospital was able to remain open during the duration of the project.

Related Stories

| Jan 3, 2012

VDK Architects merges with Harley Ellis Devereaux

Harley Ellis Devereaux will relocate the employees in its current Berkeley, Calif., office to the new Oakland office location effective January 3, 2012.

| Jan 3, 2012

New Chicago hospital prepared for pandemic, CBR terror threat

At a cost of $654 million, the 14-story, 830,000-sf medical center, designed by a Perkins+Will team led by design principal Ralph Johnson, FAIA, LEED AP, is distinguished in its ability to handle disasters. 

| Jan 3, 2012

BIM: not just for new buildings

Ohio State University Medical Center is converting 55 Medical Center buildings from AutoCAD to BIM to improve quality and speed of decision making related to facility use, renovations, maintenance, and more. 

| Dec 12, 2011

Skanska to expand and renovate hospital in Georgia for $103 Million

The expansion includes a four-story, 17,500 square meters clinical services building and a five-story, 15,700 square meters, medical office building. Skanska will also renovate the main hospital.

| Dec 1, 2011

Nauset Construction breaks ground on Massachusetts health care center

The $20 million project is scheduled to be completed by December 2012. 

| Nov 29, 2011

Report finds credit crunch accounts for 20% of nation’s stalled projects

Persistent financing crunch continues to plague design and construction sector.

| Nov 28, 2011

Nauset Construction completes addition for Franciscan Hospital for Children

The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.

| Nov 11, 2011

AIA: Engineered Brick + Masonry for Commercial Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam. 

| Nov 11, 2011

How Your Firm Can Win Federal + Military Projects

The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021