The healthcare sector faces grave financial uncertainties, even with the June 28 Supreme Court decision upholding the Affordable Care Act. To help us sort out the factors impacting this lucrative segment, we turned to Philip Tobey, a Fellow of both the AIA and the American College of Healthcare Architects and Senior Vice President with SmithGroupJJR.
“Health industry providers legitimately expect significant efficiencies and lower costs for design and construction services, to go along with the economies that they themselves face with tighter and value-based reimbursement terms under health reform,” says Tobey, a member of Building Design+Construction’s Editorial Board.
In other words, AEC firms are going to have to share some of their healthcare clients’ pain. The drive for greater operational efficiency and lower cost in healthcare will be unrelenting, with bundled payments and shared savings models in lieu of traditional fee-for-service reimbursement forcing healthcare providers to eliminate wasteful practices.
Tobey sees three major trends emerging: 1) growing emphasis on ambulatory care, 2) medical systems integration, and 3) the “bundling/unbundling” of services.
SCROLL DOWN FOR GIANTS 300 TOP 25 AEC HEALTHCARE FIRM RANKINGS
1. PUSHING AMBULATORY CARE FACILITIES OUT
“The trend to push services out of the hospital into ambulatory settings will only intensify,” says Tobey. He notes, however, that there will be an “overwhelming need” to expand the front end of delivery—primary care, urgent care, and emergency departments—and to rationalize procedural and imaging resource capacity. At the same time, freestanding surgery and imaging centers may not be as prevalent in the future, and may need to be consolidated into larger hospital centers.
“Hospitals are not going away,” says Tobey, even though inpatient volumes are predicted to fall 5%, vs. 30% growth in outpatient volume. The sheer increased volume of patients, especially as baby boomers age, will inevitably drive up acute-care admissions. In the face of these seemingly countervailing trends, says Tobey, “The need to renovate outdated or obsolete facilities will be a strong driver in the healthcare business.”
2. INTEGRATING MEDICAL SYSTEMS MORE TIGHTLY
Tobey says the need for greater efficiency and ever-higher quality of care are not new goals for medical care or medical design, but hospital systems are being encouraged further by healthcare reform to streamline processes, with more mergers, acquisitions, and hospital-physician staff integrations on the horizon. “The industry’s even been talking about including services like long-term care and home care into this integrated approach,” he says.
Although there will always be a need for acute-care hospitals, Tobey sees a possible shift toward more community-based portals. As health systems continue to integrate, they will rely more and more on treatment venues outside the hospital to provide patients with coordinated preventive care and treatment for chronic conditions.
The IT component of hospital systems is already a natural for systems integration. “Providing the right information where it’s needed is essential for clinical care,” says Tobey, who foresees greater implementation of electronic medical records.
Are hospitals ready for lean?
“Everybody’s talking about it, but many hospital owners are wary of taking on lean,” says SmithGroupJJR’s Phil Tobey, FAIA, FACHA, whose firm is on the team for Sutter Health’s California Pacific Medical Center in San Francisco, the largest lean project in the U.S. “You have Sutter, which is totally lean, then you have clients who tell us not even to mention the word,” he says. “Others are applying the basic principles of lean construction without carrying the heavy weight of all that lean entails.”
Applying Lean/Six Sigma principles to healthcare, says Jeffrey C. Stouffer, AIA, a Principal with HKS, would result in “measurable outcomes and even risk sharing as part of the design and construction process” by eliminating unnecessary waste in construction and operations and increasing staff efficiency and safety, while reducing energy and staff costs for the hospital.
3. UNBUNDLING/BUNDLING OF HEALTHCARE SERVICES
Healthcare providers are “decanting” non-core functions—services like pharmacy, lab support, materials handling, and environmental management—from the mother ship into cheaper B-occupancy buildings. “Anything soft, anything that’s not high-tech, is being taken out,” says Tobey. “That’s the unbundling.”
However, once the unbundling of less-intense services has been accomplished, says Tobey, some hospital systems are opting to bundle the remaining hospital space, by placing beds back on top of the structure’s base diagnostic and support block, instead of having the traditional diagnostic/support chassis with attached nursing wings.
“You unbundle and decant the support services, then take the remaining high-intensity hospital base and put the beds on top,” says Tobey. A recent study for a 100-bed community hospital found that following such a scheme would result in 39% savings in construction costs per bed. +
TOP 25 HEALTHCARE SECTOR ARCHITECTURE FIRMS
Rank | Company | 2011 Healthcare Revenue ($) |
1 | HDR Architecture | 205,200,000 |
2 | HKS | 124,736,964 |
3 | Perkins+Will | 122,895,589 |
4 | Cannon Design | 121,000,000 |
5 | NBBJ | 116,401,000 |
6 | HOK | 102,695,248 |
7 | SmithGroupJJR | 74,600,000 |
8 | RTKL Associates | 68,421,405 |
9 | Perkins Eastman | 63,700,000 |
10 | Hammel, Green and Abrahamson | 61,900,000 |
11 | ZGF Architects | 54,338,355 |
12 | Heery International | 48,583,000 |
13 | HMC Architects | 42,715,899 |
14 | PageSoutherlandPage | 38,670,000 |
15 | IBI Group | 37,349,554 |
16 | Skidmore, Owings & Merrill | 33,950,000 |
17 | FKP Architects | 33,947,200 |
18 | Gresham, Smith and Partners | 32,876,981 |
19 | FreemanWhite | 28,500,000 |
20 | RBB Architects | 28,500,000 |
21 | LEO A DALY | 26,900,325 |
22 | BSA LifeStructures | 26,323,759 |
23 | EwingCole | 24,000,000 |
24 | KMD Architects | 20,161,678 |
25 | Ennead Architects | 19,875,000 |
TOP 25 HEALTHCARE SECTOR ENGINEERING FIRMS
Rank | Company | 2011 Healthcare Revenue ($) |
1 | AECOM Technology Corp. | 314,000,000 |
2 | Stantec | 109,980,000 |
3 | URS Corp. | 41,298,918 |
4 | Smith Seckman Reid | 38,300,000 |
5 | Jacobs | 32,950,000 |
6 | Parsons Brinckerhoff | 30,600,000 |
7 | KPFF Consulting Engineers | 28,000,000 |
8 | TTG|TMAD TAYLOR & GAINES | 27,677,900 |
9 | Mazzetti Nash Lipsey Burch | 24,988,296 |
10 | Degenkolb Engineers | 22,454,591 |
11 | Allen & Shariff | 21,577,769 |
12 | Bard, Rao + Athanas Consulting Engineers | 18,000,000 |
13 | ccrd partners | 17,100,000 |
14 | Atkins North America | 16,173,240 |
15 | AKF Group | 15,200,000 |
16 | KJWW Engineering Consultants | 14,607,369 |
17 | Syska Hennessy Group | 14,462,238 |
18 | Zak Companies | 13,882,705 |
19 | TLC Engineering for Architecture | 13,874,283 |
20 | Dewberry | 10,613,564 |
21 | Thornton Tomasetti | 9,860,000 |
22 | Sparling | 9,658,825 |
23 | Walter P Moore | 7,718,326 |
24 | M/E Engineering | 7,700,000 |
25 | Rutherford & Chekene | 7,650,000 |
TOP 25 HEALTHCARE SECTOR CONSTRUCTION FIRMS
Rank | Company | 2011 Healthcare Revenue ($) |
1 | Turner Corporation, The | 1,807,050,000 |
2 | McCarthy Holdings | 1,231,000,000 |
3 | Gilbane Building Co. | 1,091,777,000 |
4 | Clark Group | 1,067,411,678 |
5 | PCL Construction Enterprises | 869,130,091 |
6 | Brasfield & Gorrie | 833,522,003 |
7 | Skanska USA | 724,418,042 |
8 | JE Dunn Construction | 636,206,095 |
9 | Robins & Morton | 599,073,000 |
10 | DPR Construction | 588,199,172 |
11 | Whiting-Turner Contracting Co., The | 464,779,240 |
12 | Mortenson | 455,620,000 |
13 | Lend Lease | 434,626,482 |
14 | Hensel Phelps Construction | 425,760,000 |
15 | Suffolk Construction | 420,343,563 |
16 | Pepper Construction Group | 415,064,000 |
17 | Tutor Perini Corp. | 409,583,000 |
18 | Balfour Beatty US | 389,253,907 |
19 | Hunt Construction Group | 369,500,000 |
20 | Hoar Construction | 313,937,000 |
21 | Flintco | 291,400,000 |
22 | Layton Construction | 287,300,000 |
23 | HBE Corp. | 279,200,000 |
24 | Power Construction | 275,000,000 |
25 | Swinerton | 274,627,440 |
Related Stories
| May 15, 2014
Paints, coatings, and sealants: 10 new ways to seal the deal
Color-shifting finishes, dry-erase surfaces, and stain-blocking paints are highlighted in this round up of new offerings in paints, coatings, sealants, and finishes.
| May 15, 2014
Biking to work up by 60 percent, according to Census Bureau report
Many U.S. cities are seeing an increase in bicycle commuters, according to new a U.S. Census Bureau report. While bicyclists still account for just 0.6% of all commuters, some of the nation's largest cities have more than doubled their rates since 2000.
| May 15, 2014
'Virtually indestructible': Utah architect applies thin-shell dome concept for safer schools
At $94 a square foot and "virtually indestructible," some school districts in Utah are opting to build concrete dome schools in lieu of traditional structures.
| May 15, 2014
First look: 9/11 Memorial Museum opens to first-responders, survivors, 9/11 families [slideshow]
The 110,000-sf museum is filled with monumental artifacts from the tragedy and exhibits that honor the lives of every victim of the 2001 and 1993 attacks.
| May 14, 2014
New study shows employees aren't happier working in green buildings
People working in buildings certified under LEED’s green building standard appear no more satisfied with their workplace environments than those in conventional buildings, according to new research from the University of California, Berkeley, and the University of Nottingham.
| May 14, 2014
Construction growth looking up: Gilbane Spring 2014 Economic Report
Construction spending for 2014 should finish 6.6% higher than in 2013, with nonresidential work contributing substantially.
| May 14, 2014
Prefab payback: Mortenson quantifies cost and schedule savings from prefabrication techniques
Value-based cost-benefit analysis of prefab approaches on the firm's 360-bed Exempla Saint Joseph Heritage Project shows significant savings for the Building Team.
| May 13, 2014
First look: Nadel's $1.5 billion Dalian, China, Sports Center
In addition to five major sports venues, the Dalian Sports Center includes a 30-story, 440-room, 5-star Kempinski full-service hotel and conference center and a 40,500-square-meter athletes’ training facility and office building.
| May 13, 2014
Drexel University case study report: Green Globes cheaper, faster than LEED
GBI’s Green Globes certification process is significantly less expensive to conduct and faster to complete than LEED certification, says Drexel prof.
| May 13, 2014
Steven Holl's sculptural Institute for Contemporary Art set to break ground at VCU
The facility will have two entrances—one facing the city of Richmond, Va., the other toward VCU's campus—to serve as a connection between "town and gown."