flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

$300 million mixed-use project in Chicago’s medical district wins key approval

$300 million mixed-use project in Chicago’s medical district wins key approval

Plans call for medical offices, apartments, retail space, and parking garage


By BD+C Staff | August 6, 2014
Rendering: Epstein
Rendering: Epstein

The Illinois Medical District Commission approved a 1.16 million sf, $300 million mixed-use project in Chicago’s Illinois Medical District. The decision is an important step for the IMD Gateway Center project, a scaled-up version of an earlier $162 million proposal by Higgins Development.

Gateway Center will sit on a 9.5-acre site of mostly surface parking lots. Current plans include a 10-story, 225-room hotel; a 16-story, 200-unit apartment building; a second apartment building, of 224,000 sf; 92,000 sf of retail space; an 88,000 sf medical office building; 100,000 sf of lab space; and a five-story parking garage.

Lead developer, Gateway Development Partners L.L.C., is composed of Higgins Development Partners, Thomas Samuels Enterprises, East Lake Management & Development Corp. and Isiah Real Estate L.L.C., which is headed by former NBA star Isiah Thomas.

A groundbreaking is expected to be held within a year. The developer will hold a 75-year ground lease expected to provide the IMDC with more than $1 million annually.

(http://www.cpexecutive.com/regions/midwest/illinois-medical-districts-300m-gateway-center-moves-forward/1004101228.html)

Related Stories

| Feb 19, 2014

USGBC introduces new online educational platform

The U.S. Green Building Council has introduced “Education @USGBC” a new educational platform.

| Feb 17, 2014

Channeling weather forecasts to building systems can yield significant energy savings

Using weather forecasts to predict outdoor temperature changes can lead to significant energy savings, exceeding 10%, researchers say.

| Feb 17, 2014

Lawmakers may take away control of Florida hospital project from the VA

The project is $100 million over budget and has missed its scheduled completion date.

| Feb 17, 2014

Business, labor at odds over toughening of OSHA silica dust rule

OSHA says the rules will protect workers and prevent 700 fatalities annually. Others say the rules would hurt businesses and jobs. 

| Feb 17, 2014

Tulsa, Okla., mulls code change to require storm shelters in new schools

State and city officials are pushing for increased bonding capacity to pay for the storm shelters.

| Feb 13, 2014

Appraisal Institute issues guidelines on evaluating green property

The Appraisal Institute and the Institute for Market Transformation have issued guidelines for training property appraisers to evaluate green buildings.

| Feb 7, 2014

New LEED Dynamic Plaque system will measure building performance

The U.S. Green Building Council recently unveiled the LEED Dynamic Plaque, which is a new system designed for benchmarking and comparing post-occupancy building performance on a global scale.

| Feb 7, 2014

Los Angeles officials struggle to deal with needed seismic retrofits

Sixteen years ago, the Los Angeles City Council decided against requiring retrofits of existing buildings because of the projected cost and the threat of losing 20,000 apartment buildings.

| Feb 7, 2014

Los Angeles officials struggle to deal with needed seismic retrofits

Sixteen years ago, the Los Angeles City Council decided against requiring retrofits of existing buildings because of the projected cost and the threat of losing 20,000 apartment buildings.

| Feb 7, 2014

EPA, Freddie Mac collaborate on energy- and water-efficient apartments

Freddie Mac will gather data on energy and water use from property owners, and encourage lenders to spend on energy-efficient investments for multifamily housing. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021