YotelPAD Miami, a 31-story hotel/condo project, is currently under construction in Miami’s downtown urban core at 227 NE 2nd Street. Stantec is providing all-inclusive architecture, interior design, and engineering services for the project.
The 327,356-sf tower will feature 222 Yotel-branded “cabins” (hotel rooms) and 231 “PADs” (condominiums). Building amenities will include a Skytop Lounge, a pool deck with a restaurant and bar, a fitness center, co-working space, and a pet spa.
An amenity deck on the 12th floor will separate the building into two distinct elements. The bottom portion of the building (floors 2-12) is the hotel and features a simple geometric design. The condominiums will be located above the amenity pad (floors 15-30) and feature floor-to-ceiling windows and balconies.
See Also: The year-end U.S. hotel construction pipeline continues steady growth trend
The ground level will include separate lobbies for guests and residences, a restaurant, a lounge, an organic matcha bar, and co-working space. Also included for residents are smart lockers for package deliveries, bike storage, and individual storage. Condo units will range from studios to one- and two-bedrooms and range in size from 417 sf to 708 sf.
Aria Development Group and AQARAT are the project’s developers. YotelPAD Miami is slated for completion in early 2021.
Related Stories
| Sep 19, 2013
What we can learn from the world’s greenest buildings
Renowned green building author, Jerry Yudelson, offers five valuable lessons for designers, contractors, and building owners, based on a study of 55 high-performance projects from around the world.
| Sep 19, 2013
6 emerging energy-management glazing technologies
Phase-change materials, electrochromic glass, and building-integrated PVs are among the breakthrough glazing technologies that are taking energy performance to a new level.
| Sep 19, 2013
Roof renovation tips: Making the choice between overlayment and tear-off
When embarking upon a roofing renovation project, one of the first decisions for the Building Team is whether to tear off and replace the existing roof or to overlay the new roof right on top of the old one. Roofing experts offer guidance on making this assessment.
| Sep 17, 2013
Healthcare project will merge outpatient clinic with YMCA to promote wellness and prevention
Penrose-St. Francis Health Services and the YMCA of the Pikes Peak Region announce collaboration, along with developer The Boldt Company, to create next-generation wellness facility.
| Sep 16, 2013
Study analyzes effectiveness of reflective ceilings
Engineers at Brinjac quantify the illuminance and energy consumption levels achieved by increasing the ceiling’s light reflectance.
| Sep 13, 2013
Loews Hotels & Resorts announces major cross-portfolio upgrades
Loews Hotels & Resorts is currently in the midst of a major growth and property redesign initiative, reflecting a strong national trend in hospitality renovation.
| Sep 11, 2013
BUILDINGChicago eShow Daily – Day 3 coverage
Day 3 coverage of the BUILDINGChicago/Greening the Heartland conference and expo, taking place this week at the Holiday Inn Chicago Mart Plaza.
| Sep 10, 2013
The new medical office building: 7 things to know about today’s outpatient clinic
Regulatory pressures, economic constraints, and emerging technologies are transforming healthcare. Learn how Building Teams are responding with efficient, appealing, boundary-blurring outpatient buildings.
| Sep 10, 2013
BUILDINGChicago eShow Daily – Day 2 coverage
The BD+C editorial team brings you this real-time coverage of day 2 of the BUILDINGChicago/Greening the Heartland conference and expo taking place this week at the Holiday Inn Chicago Mart Plaza.
| Sep 4, 2013
Augmented reality goes mainstream: 12 applications for design and construction firms
Thanks to inexpensive mobile devices and increasingly advanced software apps, Building Teams are finally able to bring their BIM models to life on the job site.