A new aquatic center on Tinnerbäck Lake in Linköping, Sweden, will take its form from the motion of waves washing ashore. 3XN is the architect for the project after its Vågen proposal won a competition against other entrants such as Zaha Hadid Architects and Henning Larsen Architects.
Vågen, which unsurprisingly means The Wave, will connect the urban fabric to the water in both form and function, according to ArchDaily. Curving curtain walls undulate along the lakefront to achieve the desired wave effect and, as the landscape rises, the building masses step up naturally to meet the city.
A plaza will provide access into the building as well as to several new restaurants. A double height lobby will welcome visitors and create an easily navigable space to access each of the building’s functions and its four different pool areas. A wooden screen, selected for its strength to weight ratio and environmental qualities, will cover the façade of the building and pass over large panoramic windows that open to views of the neighboring lake.
Construction is expected to begin in September 2017 and complete in 2021 for a total cost of $85 million.
Rendering courtesy of 3XN Architects.
Rendering courtesy of 3XN Architects.
Rendering courtesy of 3XN Architects.
Related Stories
| Sep 3, 2014
New designation launched to streamline LEED review process
The LEED Proven Provider designation is designed to minimize the need for additional work during the project review process.
| Sep 2, 2014
Ranked: Top green building sector AEC firms [2014 Giants 300 Report]
AECOM, Gensler, and Turner top BD+C's rankings of the nation's largest green design and construction firms.
| Aug 29, 2014
The new College Football Hall of Fame opens in Atlanta
Adjacent to the Georgia World Congress Center and Centennial Olympic Park, the three-story, 94,250-sf attraction is designed to celebrate the traditions of college football.
| Aug 27, 2014
Ranked: Top sports facility sector AEC firms [2014 Giants 300 Report]
Populous, AECOM, and Turner head BD+C's rankings of the nation's largest sports facility design and construction firms, as reported in the 2014 Giants 300 Report.
| Aug 27, 2014
Survey of NCAA athletic directors reveals strong demand for new facilities, fan amenities
More than 80% of college athletic directors plan to make significant investments in facilities over the next five years to target potential recruits and spectators, according to a new survey by AECOM and Ohio University.
| Aug 20, 2014
WELL Building: The next step in green sports construction
The WELL Building Standard, a new protocol that focuses on human wellness within the built environment, is a particularly good fit for sports facilities, write Skanska's Tom Tingle and Beth Heider.
| Aug 19, 2014
HOK to acquire 360 Architecture
Expected to be finalized by the end of October, the acquisition of 360 Architecture will provide immediate benefits to both firms’ clients worldwide as HOK re-enters the sports and entertainment market.
| Jul 28, 2014
Reconstruction market benefits from improving economy, new technology [2014 Giants 300 Report]
Following years of fairly lackluster demand for commercial property remodeling, reconstruction revenue is improving, according to the 2014 Giants 300 report.
| Jul 28, 2014
Reconstruction Sector Construction Firms [2014 Giants 300 Report]
Structure Tone, Turner, and Gilbane top Building Design+Construction's 2014 ranking of the largest reconstruction contractor and construction management firms in the U.S.
| Jul 28, 2014
Reconstruction Sector Engineering Firms [2014 Giants 300 Report]
Jacobs, URS, and Wiss, Janney, Elstner top Building Design+Construction's 2014 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.