flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

3XN Architects wins competition to design Swedish aquatic center

Sports and Recreational Facilities

3XN Architects wins competition to design Swedish aquatic center

The Danish firm beat entries from Zaha Hadid Architects and Henning Larsen Architects for the project.


By David Malone, Associate Editor | February 22, 2017

Rendering courtesy of 3XN Architects.

A new aquatic center on Tinnerbäck Lake in Linköping, Sweden, will take its form from the motion of waves washing ashore. 3XN is the architect for the project after its Vågen proposal won a competition against other entrants such as Zaha Hadid Architects and Henning Larsen Architects.

Vågen, which unsurprisingly means The Wave, will connect the urban fabric to the water in both form and function, according to ArchDaily. Curving curtain walls undulate along the lakefront to achieve the desired wave effect and, as the landscape rises, the building masses step up naturally to meet the city.

A plaza will provide access into the building as well as to several new restaurants. A double height lobby will welcome visitors and create an easily navigable space to access each of the building’s functions and its four different pool areas. A wooden screen, selected for its strength to weight ratio and environmental qualities, will cover the façade of the building and pass over large panoramic windows that open to views of the neighboring lake. 

Construction is expected to begin in September 2017 and complete in 2021 for a total cost of $85 million.

 

Rendering courtesy of 3XN Architects.

 

Rendering courtesy of 3XN Architects.

 

Rendering courtesy of 3XN Architects.

Related Stories

| Mar 11, 2011

Community sports center in Nashville features NCAA-grade training facility

A multisport community facility in Nashville featuring a training facility that will meet NCAA Division I standards is being constructed by St. Louis-based Clayco and Chicago-based Pinnacle.

| Mar 11, 2011

Slam dunk for the University of Nebraska’s basketball arena

The University of Nebraska men’s and women’s basketball programs will have a new home beginning in 2013. Designed by the DLR Group, the $344 million West Haymarket Civic Arena in Lincoln, Neb., will have 16,000 seats, suites, club amenities, loge, dedicated locker rooms, training rooms, and support space for game operations.

| Feb 23, 2011

London 2012: What Olympic Park looks like today

London 2012 released a series of aerial images that show progress at Olympic Park, including a completed roof on the stadium (where seats are already installed), tile work at the aquatic centre, and structural work complete on more than a quarter of residential projects at Olympic Village.

| Jan 21, 2011

Sustainable history center exhibits Fort Ticonderoga’s storied past

Fort Ticonderoga, in Ticonderoga, N.Y., along Lake Champlain, dates to 1755 and was the site of battles in the French and Indian War and the American Revolution. The new $20.8 million, 15,000-sf Deborah Clarke Mars Education Center pays homage to the French magasin du Roi (the King’s warehouse) at the fort.

| Jan 20, 2011

Houston Dynamo soccer team plans new venue

Construction is scheduled to begin this month on a new 22,000-seat Major League Soccer stadium for the Houston Dynamo. The $60 million project is expected to be ready for the 2012 MLS season.

| Jan 20, 2011

Construction begins on second St. Louis community center

O’Fallon Park Recreation Complex in St. Louis, designed by local architecture/engineering firm KAI Design & Build, will feature an indoor aquatic park with interactive water play features, a lazy river, water slides, laps lanes, and an outdoor spray and multiuse pool.

| Nov 16, 2010

Brazil Olympics spurring green construction

Brazil's green building industry will expand in the coming years, spurred by construction of low-impact venues being built for the 2016 Olympics. The International Olympic Committee requires arenas built for the 2016 games in Rio de Janeiro meet international standards for low-carbon emissions and energy efficiency. This has boosted local interest in developing real estate with lower environmental impact than existing buildings. The timing couldn’t be better: the Brazilian government is just beginning its long-term infrastructure expansion program.

| Nov 3, 2010

Park’s green education center a lesson in sustainability

The new Cantigny Outdoor Education Center, located within the 500-acre Cantigny Park in Wheaton, Ill., earned LEED Silver. Designed by DLA Architects, the 3,100-sf multipurpose center will serve patrons of the park’s golf courses, museums, and display garden, one of the largest such gardens in the Midwest.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021