flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

40 Under 40 retrospective: Where are they now?

40 Under 40 retrospective: Where are they now?

BD+C catches up with two past 40 Under 40 honorees: a designer who credits trapeze work with boosting her confidence, and a security expert who also knows a lot about squash.


By Julie Higginbotham, Senior Editor | October 2, 2013

BD+C catches up with two past 40 Under 40 honorees: a designer who credits trapeze work with boosting her confidence, and a security expert who also knows a lot about squash.

 

 

 

 

 

 

 

 

BRET EMERSON

President and Owner
Commtech Design, Rockford, Mich.
Class of 2006

ACCOMPLISHMENTS
Emerson continues as owner of Commtech, which specializes in networking, security, and A/V design. Government clients who need video security and access control systems are a key market. “We are a growing company that has survived the recession well. The world wants more cameras and access control.”

Working with Michigan’s Department of Corrections to design a new video security system for all facilities statewide.

Also working on: court building for Kalamazoo County; health sciences building for Baker College, Muskegon, Mich.; new telephone system for 26 buildings operated by the Traverse City Area Public Schools.

EXTRACURRICULAR
Regular presenter on security technology design at conferences and meetings (Michigan Department of Corrections, Michigan Department of Education).

Member, Plainfield (Mich.) Township Zoning Board of Appeals.

OFF THE CLOCK
Emerson is building a house, runs to stay in shape, and dabbles in farming. “I have started growing pumpkins as a hobby. It isn’t office work, and it gets me outside. It ties me back to my youth growing up on a farm.”

 

 

 

LORI JAMES
IIDA, NCIDQ, LEED AP ID+C

Principal
SmithGroupJJR, Detroit
Class of 2012

ACCOMPLISHMENTS
Since her U40 recognition, James has been promoted to a Principal and stockholder, and elevated to lead the Interior Design group in Detroit.

Represents her site in the companywide Interior Design Discipline Committee, which develops standards and best practices.  Has assumed new responsibilities with the firm’s Workplace Practice and led virtual training to teach nationwide staff about the proprietary WorkSIM database and planning tool.

Participated in a two-day Client Advisory Board hosted by the firm’s Learning Practice, attended by leaders in the nursing and allied health community.

EXTRACURRICULAR
Selected for the Urban Land Institute-Michigan’s Larson Center for Leadership, an eight-month program covering land use and economic, governmental, and infrastructure issues.

Mentors interior design students at Wayne State and Michigan State universities.

Leads the firm’s local involvement in Herman Miller’s annual holiday WeCare event, benefiting the Boys & Girls Clubs of America.

Committee member, DIFFA Dining by Design auction and gala supporting the Michigan AIDS Coalition.

OFF THE CLOCK
James has recently taken up aerial yoga. “There is something incredibly exhilarating about suspending yourself in a fabric trapeze. It is physically and mentally challenging. You have to trust in your personal strength and flexibility, as well as the trapeze.”

 


 

LAST CHANCE! SIGN UP FOR THIS YEAR'S U40 LEADERSHIP SUMMIT

Join our 40 Under 40 alumni and other outstanding young AEC professionals nominated by their firms at the 3rd Annual Under 40 Leadership Summit (Hyatt Regency San Francisco, October 9-11). Visit our website for information about this inspiring, AIA-accredited opportunity for learning and networking: www.BDCnetwork.com/Under40Summit/index.html.

Related Stories

| Feb 2, 2012

Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012

Winning projects will be featured in the May issue of BD+C. 

| Feb 2, 2012

VLK Architects selected for new Cypress, Texas elementary school

The Bridgeland Elementary School will be a new prototype school for the District. Designed to meet the requirements of The Collaborative for High Performance Schools.

| Feb 2, 2012

Mortenson Construction to build 2.4 MW solar project in North Carolina

Located on a 12 acre site in the Sandhills region, the 2.4 megawatt (MW) system is expected to generate approximately 3.5 million kilowatt hours (kWhs) of clean electricity on an annual basis.

| Feb 2, 2012

Shawmut Design and Construction launches sports venues division

Expansion caps year of growth for Shawmut.

| Feb 2, 2012

Fire rated glazing helps historic university preserve its past

When the University embarked on its first major addition since the opening of Hutchins Hall in 1933, preserving the Collegiate Gothic-style architecture was of utmost importance.

| Feb 2, 2012

Delk joins Gilbane Building Co.

Delk to focus on healthcare construction programs and highly complex higher education facilities for Gilbane Building Company’s Southwest region.

| Feb 2, 2012

Next phase of construction begins on Scripps Prebys Cardiovascular Institute

$456 million Institute will be comprehensive heart center for 21st Century.

| Feb 1, 2012

Increase notched in construction jobs, but unemployment rate still at 16%

AGC officials said that construction employment likely benefited from unseasonably warm weather across much of the country that extended the building season.

| Feb 1, 2012

Replacement windows eliminate weak link in the building envelope

Replacement or retrofit can help keep energy costs from going out the window.

| Feb 1, 2012

‘Augmented reality’ comes to the job site

A new software tool derived from virtual reality is helping Building Teams use the power of BIM models more effectively.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021