flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

40 Under 40 retrospective: Where are they now?

40 Under 40 retrospective: Where are they now?

BD+C catches up with two past 40 Under 40 honorees: a designer who credits trapeze work with boosting her confidence, and a security expert who also knows a lot about squash.


By Julie Higginbotham, Senior Editor | October 2, 2013

BD+C catches up with two past 40 Under 40 honorees: a designer who credits trapeze work with boosting her confidence, and a security expert who also knows a lot about squash.

 

 

 

 

 

 

 

 

BRET EMERSON

President and Owner
Commtech Design, Rockford, Mich.
Class of 2006

ACCOMPLISHMENTS
Emerson continues as owner of Commtech, which specializes in networking, security, and A/V design. Government clients who need video security and access control systems are a key market. “We are a growing company that has survived the recession well. The world wants more cameras and access control.”

Working with Michigan’s Department of Corrections to design a new video security system for all facilities statewide.

Also working on: court building for Kalamazoo County; health sciences building for Baker College, Muskegon, Mich.; new telephone system for 26 buildings operated by the Traverse City Area Public Schools.

EXTRACURRICULAR
Regular presenter on security technology design at conferences and meetings (Michigan Department of Corrections, Michigan Department of Education).

Member, Plainfield (Mich.) Township Zoning Board of Appeals.

OFF THE CLOCK
Emerson is building a house, runs to stay in shape, and dabbles in farming. “I have started growing pumpkins as a hobby. It isn’t office work, and it gets me outside. It ties me back to my youth growing up on a farm.”

 

 

 

LORI JAMES
IIDA, NCIDQ, LEED AP ID+C

Principal
SmithGroupJJR, Detroit
Class of 2012

ACCOMPLISHMENTS
Since her U40 recognition, James has been promoted to a Principal and stockholder, and elevated to lead the Interior Design group in Detroit.

Represents her site in the companywide Interior Design Discipline Committee, which develops standards and best practices.  Has assumed new responsibilities with the firm’s Workplace Practice and led virtual training to teach nationwide staff about the proprietary WorkSIM database and planning tool.

Participated in a two-day Client Advisory Board hosted by the firm’s Learning Practice, attended by leaders in the nursing and allied health community.

EXTRACURRICULAR
Selected for the Urban Land Institute-Michigan’s Larson Center for Leadership, an eight-month program covering land use and economic, governmental, and infrastructure issues.

Mentors interior design students at Wayne State and Michigan State universities.

Leads the firm’s local involvement in Herman Miller’s annual holiday WeCare event, benefiting the Boys & Girls Clubs of America.

Committee member, DIFFA Dining by Design auction and gala supporting the Michigan AIDS Coalition.

OFF THE CLOCK
James has recently taken up aerial yoga. “There is something incredibly exhilarating about suspending yourself in a fabric trapeze. It is physically and mentally challenging. You have to trust in your personal strength and flexibility, as well as the trapeze.”

 


 

LAST CHANCE! SIGN UP FOR THIS YEAR'S U40 LEADERSHIP SUMMIT

Join our 40 Under 40 alumni and other outstanding young AEC professionals nominated by their firms at the 3rd Annual Under 40 Leadership Summit (Hyatt Regency San Francisco, October 9-11). Visit our website for information about this inspiring, AIA-accredited opportunity for learning and networking: www.BDCnetwork.com/Under40Summit/index.html.

Related Stories

| Nov 29, 2011

SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China

Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.

| Nov 29, 2011

Turner Construction establishes partnership with Clark Builders

Partnership advances growth in the Canadian marketplace.

| Nov 29, 2011

AIA launches stalled projects database

To populate this database with both stalled projects and investors interested in financing them, the AIA in the last week initiated a communications campaign to solicit information about stalled projects around the country from its members and allied professionals.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 28, 2011

Armstrong acquires Simplex Ceilings

Simplex will become part of the Armstrong Building Products division.

| Nov 28, 2011

Nauset Construction completes addition for Franciscan Hospital for Children

The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.

| Nov 23, 2011

Lord, Aeck & Sargent opens fourth U.S. office, acquiring architecture firm in Austin, Texas

Strategic move offers growth opportunity and strengthens the firm’s historic preservation portfolio.

| Nov 23, 2011

Griffin Electric completes Gwinnett Tech project

Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices.

| Nov 22, 2011

Corporate America adopting revolutionary technology

The survey also found that by 2015, the standard of square feet allocated per employee is expected to drop from 200 to estimates ranging from 50 to 100 square feet per person dependent upon the industry sector. 

| Nov 22, 2011

Report finds that L.A. lags on solar energy, offers policy solutions

Despite robust training programs, L.A. lacks solar jobs; lost opportunity for workers in high-need communities.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021