flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

40 Under 40 retrospective: Where are they now?

40 Under 40 retrospective: Where are they now?

BD+C catches up with two past 40 Under 40 honorees: a designer who credits trapeze work with boosting her confidence, and a security expert who also knows a lot about squash.


By Julie Higginbotham, Senior Editor | October 2, 2013

BD+C catches up with two past 40 Under 40 honorees: a designer who credits trapeze work with boosting her confidence, and a security expert who also knows a lot about squash.

 

 

 

 

 

 

 

 

BRET EMERSON

President and Owner
Commtech Design, Rockford, Mich.
Class of 2006

ACCOMPLISHMENTS
Emerson continues as owner of Commtech, which specializes in networking, security, and A/V design. Government clients who need video security and access control systems are a key market. “We are a growing company that has survived the recession well. The world wants more cameras and access control.”

Working with Michigan’s Department of Corrections to design a new video security system for all facilities statewide.

Also working on: court building for Kalamazoo County; health sciences building for Baker College, Muskegon, Mich.; new telephone system for 26 buildings operated by the Traverse City Area Public Schools.

EXTRACURRICULAR
Regular presenter on security technology design at conferences and meetings (Michigan Department of Corrections, Michigan Department of Education).

Member, Plainfield (Mich.) Township Zoning Board of Appeals.

OFF THE CLOCK
Emerson is building a house, runs to stay in shape, and dabbles in farming. “I have started growing pumpkins as a hobby. It isn’t office work, and it gets me outside. It ties me back to my youth growing up on a farm.”

 

 

 

LORI JAMES
IIDA, NCIDQ, LEED AP ID+C

Principal
SmithGroupJJR, Detroit
Class of 2012

ACCOMPLISHMENTS
Since her U40 recognition, James has been promoted to a Principal and stockholder, and elevated to lead the Interior Design group in Detroit.

Represents her site in the companywide Interior Design Discipline Committee, which develops standards and best practices.  Has assumed new responsibilities with the firm’s Workplace Practice and led virtual training to teach nationwide staff about the proprietary WorkSIM database and planning tool.

Participated in a two-day Client Advisory Board hosted by the firm’s Learning Practice, attended by leaders in the nursing and allied health community.

EXTRACURRICULAR
Selected for the Urban Land Institute-Michigan’s Larson Center for Leadership, an eight-month program covering land use and economic, governmental, and infrastructure issues.

Mentors interior design students at Wayne State and Michigan State universities.

Leads the firm’s local involvement in Herman Miller’s annual holiday WeCare event, benefiting the Boys & Girls Clubs of America.

Committee member, DIFFA Dining by Design auction and gala supporting the Michigan AIDS Coalition.

OFF THE CLOCK
James has recently taken up aerial yoga. “There is something incredibly exhilarating about suspending yourself in a fabric trapeze. It is physically and mentally challenging. You have to trust in your personal strength and flexibility, as well as the trapeze.”

 


 

LAST CHANCE! SIGN UP FOR THIS YEAR'S U40 LEADERSHIP SUMMIT

Join our 40 Under 40 alumni and other outstanding young AEC professionals nominated by their firms at the 3rd Annual Under 40 Leadership Summit (Hyatt Regency San Francisco, October 9-11). Visit our website for information about this inspiring, AIA-accredited opportunity for learning and networking: www.BDCnetwork.com/Under40Summit/index.html.

Related Stories

| Nov 3, 2010

Park’s green education center a lesson in sustainability

The new Cantigny Outdoor Education Center, located within the 500-acre Cantigny Park in Wheaton, Ill., earned LEED Silver. Designed by DLA Architects, the 3,100-sf multipurpose center will serve patrons of the park’s golf courses, museums, and display garden, one of the largest such gardens in the Midwest.

| Nov 3, 2010

Public works complex gets eco-friendly addition

The renovation and expansion of the public works operations facility in Wilmette, Ill., including a 5,000-sf addition that houses administrative and engineering offices, locker rooms, and a lunch room/meeting room, is seeking LEED Gold certification.

| Nov 3, 2010

Sailing center sets course for energy efficiency, sustainability

The Milwaukee (Wis.) Community Sailing Center’s new facility on Lake Michigan counts a geothermal heating and cooling system among its sustainable features. The facility was designed for the nonprofit instructional sailing organization with energy efficiency and low operating costs in mind.

| Nov 3, 2010

Seattle University’s expanded library trying for LEED Gold

Pfeiffer Partners Architects, in collaboration with Mithun Architects, programmed, planned, and designed the $55 million renovation and expansion of Lemieux Library and McGoldrick Learning Commons at Seattle University. The LEED-Gold-designed facility’s green features include daylighting, sustainable and recycled materials, and a rain garden.

| Nov 3, 2010

Recreation center targets student health, earns LEED Platinum

Not only is the student recreation center at the University of Arizona, Tucson, the hub of student life but its new 54,000-sf addition is also super-green, having recently attained LEED Platinum certification.

| Nov 3, 2010

New church in Connecticut will serve a growing congregation

Tocci Building Companies will start digging next June for the Black Rock Congregational Church in Fairfield, Conn. Designed by Wiles Architects, the 103,000-sf multiuse facility will feature a 900-person worship center with tiered stadium seating, a children’s worship center, a chapel, an auditorium, a gymnasium, educational space, administrative offices, commercial kitchen, and a welcome center with library and lounge.

| Nov 3, 2010

Senior housing will be affordable, sustainable

Horizons at Morgan Hill, a 49-unit affordable senior housing community in Morgan Hill, Calif., was designed by KTGY Group and developed by Urban Housing Communities. The $21.2 million, three-story building will offer 36 one-bed/bath units (773 sf) and 13 two-bed/bath units (1,025 sf) on a 2.6-acre site.

| Nov 3, 2010

Designs complete for new elementary school

SchenkelShultz has completed design of the new 101,270-sf elementary Highlands Elementary School, as well as designs for three existing buildings that will be renovated, in Kissimmee, Fla. The school will provide 48 classrooms for 920 students, a cafeteria, a media center, and a music/art suite with outdoor patio. Three facilities scheduled for renovations total 19,459 sf and include an eight-classroom building that will be used as an exceptional student education center, a older media center that will be used as a multipurpose building, and another building that will be reworked as a parent center, with two meeting rooms for community use. W.G. Mills/Ranger is serving as CM for the $15.1 million project.

| Nov 3, 2010

Chengdu retail center offers a blend of old and new China

The first phase of Pearl River New Town, an 80-acre project in Chengdu, in China’s Wenjiang District, is under way along the banks of the Jiang’an River. Chengdu was at one time a leading center for broadcloth production, and RTKL, which is overseeing the project’s master planning, architecture, branding, and landscape architecture, designed the project’s streets, pedestrian pathways, and bridges to resemble a woven fabric.

| Nov 3, 2010

Rotating atriums give Riyadh’s first Hilton an unusual twist

Goettsch Partners, in collaboration with Omrania & Associates (architect of record) and David Wrenn Interiors (interior designer), is serving as design architect for the five-star, 900-key Hilton Riyadh.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021