flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

4.8-megawatt solar power system completed at Jersey Gardens Mall

4.8-megawatt solar power system completed at Jersey Gardens Mall

Solar array among the largest rooftop systems in North America.


By By BD+C Staff | February 16, 2012
The project is comprised of more than 15,000 high efficiency SunPower panels, an
The project is comprised of more than 15,000 high efficiency SunPower panels, and generates approximately the amount of power re

Glimcher Realty Trust announced the completion of a 4.8-megawatt SunPower rooftop solar system at Jersey Gardens in Elizabeth, N.J. The project, which is among the largest rooftop systems in North America, broke ground in June 2011 and began producing power this week.

Anchored by tenants like Gap Outlet, H&M, Lord & Taylor Outlet, Neiman Marcus Last Call, Nike Factory Store and Saks Fifth Avenue Off 5th, Jersey Gardens is the largest outlet mall in New Jersey. The mall was built by Glimcher Realty Trust in 1999 on the site of a former landfill.

The project is comprised of more than 15,000 high efficiency SunPower panels, and generates approximately the amount of power required for 564 New Jersey homes. It is expected to generate the equivalent of 11 percent of the mall’s electrical demand.  

The solar power system at Jersey Gardens was made possible through a partnership with Gerding Edlen Development, Inc. and Gerding Edlen Sustainable Solutions.

 This project is the result of a power purchase agreement between Glimcher Realty Trust and Clean Focus Corporation. Under the agreement, Clean Focus financed and owns the system. All solar renewable energy credits and environmental benefits associated with the system will be owned by Clean Focus. Jersey Gardens will buy the electricity at a predetermined, predictable price, providing a long-term hedge against rising power prices with no initial capital investment.

 The Jersey Gardens solar system was designed and installed by SunPower Corp., which will also operate and maintain the system. The system uses the SunPowerT5 Solar Roof Tile, which is the solar industry’s first non-penetrating rooftop product that combines a high-efficiency SunPower solar panel, frame and mounting system into a single, pre-engineered unit. Tilted at a 5-degree angle, the system will approximately double the energy generated per square meter compared to other systems that are mounted flat onto commercial rooftops. BD+C

Related Stories

| Nov 29, 2011

Turner Construction establishes partnership with Clark Builders

Partnership advances growth in the Canadian marketplace.

| Nov 29, 2011

AIA launches stalled projects database

To populate this database with both stalled projects and investors interested in financing them, the AIA in the last week initiated a communications campaign to solicit information about stalled projects around the country from its members and allied professionals.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 28, 2011

Armstrong acquires Simplex Ceilings

Simplex will become part of the Armstrong Building Products division.

| Nov 28, 2011

Nauset Construction completes addition for Franciscan Hospital for Children

The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.

| Nov 23, 2011

Lord, Aeck & Sargent opens fourth U.S. office, acquiring architecture firm in Austin, Texas

Strategic move offers growth opportunity and strengthens the firm’s historic preservation portfolio.

| Nov 23, 2011

Griffin Electric completes Gwinnett Tech project

Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices.

| Nov 22, 2011

Corporate America adopting revolutionary technology

The survey also found that by 2015, the standard of square feet allocated per employee is expected to drop from 200 to estimates ranging from 50 to 100 square feet per person dependent upon the industry sector. 

| Nov 22, 2011

Report finds that L.A. lags on solar energy, offers policy solutions

Despite robust training programs, L.A. lacks solar jobs; lost opportunity for workers in high-need communities.

| Nov 22, 2011

Saskatchewan's $1.24 billion carbon-capture project

The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021