flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

5 award-winning modular buildings

5 award-winning modular buildings

A ski-lodge-like worker housing complex in Canada and a net-zero office building in Los Angeles are among the notable Modular Building Institute award winners.


By BD+C Staff | April 3, 2013

The Modular Building Institute recently revealed the winners of its annual Awards of Distinction contest. There were 42 winners in all across six categories: Permanent Modular, Relocatable Modular, Renovated Reuse, Marketing Pieces, Green Building Designs, and Student Green Building.

Here are five winning projects that caught our eye (images and descriptions were provided by MBI):

 

 



1. MEG Energy Christina Lake Lodge, Near Conklin, A.B. - Permanent Modular

 

Voted the Judge's Choice for the competition, this lodge combines quality materials and fine craftsmanship to create the feel of a high-end ski lodge. The core facility features wood and metal inlays throughout and includes fireplaces, a theater, a recreational center, meeting rooms, a first-class fitness facility, and offices.

A number of large windows allow natural light into the buildings. The kitchen was designed with high attention to culinary processes, including high-end appliances, food handling flow and storage, efficient workspaces, and ease of cleaning.
The two-story dormitories are equipped with sound attenuating properties for the executive-level, 300-sf bedrooms. Each bedroom features a private bathroom, a workstation, refrigerator, large television, and a PTAC heating and cooling system controlled by a wall-mounted thermostat.

The lodge includes a pre-engineered gymnasium with full basketball court, rich wood panelling, and clerestory windows.

 

Category: Permanent: Commercial Housing: over 10,000 sf
Company: ATCO Structures & Logistics Ltd.
Building Use: Housing for Oil Sands Workers
Average Size of Modules: 12 x 60 x 12 feet
Total Square Feet: 120,000 sf
Days to complete: 856

 

 

2. Coal Yard Apartments, Ithaca, N.Y. - Permanent Modular

 

This four-story apartment building was designed to match architecturally to the existing buildings already at Coal Yard Apartments and the broad roof overhangs and the substantial colorful brackets that are reminiscent of the former terminal.

The building is a center corridor design with two- and three-bedroom apartments spanning multiple modules, making the apartments feel open and airy to the prospective renters. Interior amenities are matched to the requirements of the local market for this type of renter and include hardwood flooring, custom kitchens with extended height wall cabinets, and granite counter tops.

The modules are situated on a concrete parking garage that houses parking, the elevator, and mechanical systems. At the roof level, there is a garden terrace for tenants to enjoy the views over town as well as the sky and simple relaxation.

 

Category: Permanent: Commercial Housing: over 10,000 sf
Company: Champion Commercial Structures
Affiliate: Champion Commercial Structures (Direct)
Building Use: Graduate Student Apartments
Average Size of Modules: 14 x 62 x 12 feet
Total Square Feet: 27,800 sf
Days to complete: 389

[pagebreak]

3. Aviara Sales Centre, Burnaby, B.C. - Relocatable Modular

 

This 48 x 50-foot temporary pre-construction presentation center was designed to showcase a state-of-the-art, master-planned residential high-rise community located in the heart of one of the most vibrant neighborhoods in the city.

The presentation area incorporates a model room featuring photo and video displays of the proposed building. A stunning curved glass wall offers spectacular views of the architect-designed gardens and water feature overlooking the city below. Prospective buyers are invited to walk through to full-scale display suites replicating the layout, cools, and finishes of the living spaces being sold.

 

Category: Relocatable: Retail or Hospitality: over 2,000 sf
Company: Britco
Building Use: Custom Presentation Center
Average Size of Modules: 12 x 50 x 10 feet
Total Square Feet: 2,400 sf
Days to complete: 161

 

4. Tecno Fast ATCO Rental Office, Santiago, Chile - Renovated Reuse

 

To support the space requirements of an expanding business, Tecno Fast ATCO built a new office facility utilizing renovated units from a rental fleet. The main floor houses a comfortable lobby area with gourmet coffee point, low couches, pleasant lighting, meeting rooms, and kitchen facilities. The second floor features an open-plan office and a fitness facility.

Large windows throughout the office allow the ingress of natural light, while providing views over our modular manufacturing plant, service yard, and the Andes Mountains in the distance.

The two-story building uses repurposed modular buildings of different lengths, resulting in an interesting facade with a clearly defined and inviting entryway. Located on Ruta 5, the main north/south highway in Chile, the office serves as a highly visible advertisement for the company.

 

Category: Renovated Reuse: Greatest Renovation: under 10,000 sf
Company: ATCO Structures & Logistics Ltd.
Building Use: Office
Average Size of Modules: 10 x 38 x 9 feet
Total Square Feet: 6835 sf
Days to complete: 92

 

5. First Solar - AV Solar Ranch One, Los Angeles

 

Located in the Antelope Valley area of North Los Angeles County, the building houses the operations and maintenance team of a 230MW solar site that will produce sufficient electricity to support the annual energy needs of approximately 75,000 homes.

The project was developed to utilize a photovoltaic array for all building energy uses resulting in a net-zero building. A single-ply cool roof was combined with increased thermal insulation throughout the building to provide a highly efficient building envelope. Potable water usage was reduced by over 30% through the installation of high efficiency fixtures.

The building will continue to provide significant cost savings in the future since it is fully powered by the on site photovoltaic panels. As a Net Zero Energy building, the annual energy costs will be non-existent.

 



Main Category: Green Building Design
Category: Green Building
Entrant: Silver Creek Industries
Size: 89 x 49 x 15 feet
Total Square Feet: 4,361 sf

Read about all the Modular Building Institute Awards of Distinction winners.

Related Stories

| Jun 3, 2014

Libeskind's latest skyscraper breaks ground in the Philippines

The Century Spire, Daniel Libeskind's latest project, has just broken ground in Century City, southwest of Manila. It is meant to accommodate apartments and offices.

| Jun 2, 2014

Registration is open for 2014 BUILDINGChicago/Greening the Heartland Expo and Conference

BUILDINGChicago is a major conference and trade expo serving architects, engineers, contractors, property owners, real estate developers, government officials and community organizations in the Midwest.

| Jun 2, 2014

Nonresidential construction spending expands in April

Ten of 16 nonresidential construction subsectors posted increases in spending in April, according to the latest U.S. Census Bureau data. 

| Jun 2, 2014

Parking structures group launches LEED-type program for parking garages

The Green Parking Council, an affiliate of the International Parking Institute, has launched the Green Garage Certification program, the parking industry equivalent of LEED certification.

| Jun 2, 2014

SOM unveils plans for Miami transit hub

The elevated station will be a key portal within All Aboard Florida’s rail system, the nation's only privately owned, operated, and financed rail network.

| Jun 1, 2014

Architect license upon graduation? NCARB aims to accelerate licensing process

Incorporating internship and examination requirements into university education, the regulatory organization looks to simplify and shorten the licensing process.

| May 30, 2014

MIT researchers create 'home in a box' transformable wall system for micro apartments

Dubbed CityHome, the system integrates furniture, storage, exercise equipment, lighting, office equipment, and entertainment systems into a compact wall unit. 

| May 30, 2014

Riding high: L.A., Chicago working on their version of the High Line elevated park

Cities around the U.S. are taking notice of New York's highly popular High Line elevated park system. Both Chicago and Los Angeles are currently working on High Line-like projects.

| May 30, 2014

Developer will convert Dallas' storied LTV Building into mixed-use residential tower

New Orleans-based HRI Properties recently completed the purchase of one of the most storied buildings in downtown Dallas. The developer will convert the LTV Building into a mixed-use complex, with 171 hotel rooms and 186 luxury apartments.

| May 29, 2014

Turn your pen-and-paper sketches into digital drawings in seconds with this nifty gadget [video]

Funded through Kickstarter, iSketchnote uses a smart pen to instantly digitize hand-written notes and drawings.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021