The Modular Building Institute recently revealed the winners of its annual Awards of Distinction contest. There were 42 winners in all across six categories: Permanent Modular, Relocatable Modular, Renovated Reuse, Marketing Pieces, Green Building Designs, and Student Green Building.
Here are five winning projects that caught our eye (images and descriptions were provided by MBI):
1. MEG Energy Christina Lake Lodge, Near Conklin, A.B. - Permanent Modular
Voted the Judge's Choice for the competition, this lodge combines quality materials and fine craftsmanship to create the feel of a high-end ski lodge. The core facility features wood and metal inlays throughout and includes fireplaces, a theater, a recreational center, meeting rooms, a first-class fitness facility, and offices.
A number of large windows allow natural light into the buildings. The kitchen was designed with high attention to culinary processes, including high-end appliances, food handling flow and storage, efficient workspaces, and ease of cleaning.
The two-story dormitories are equipped with sound attenuating properties for the executive-level, 300-sf bedrooms. Each bedroom features a private bathroom, a workstation, refrigerator, large television, and a PTAC heating and cooling system controlled by a wall-mounted thermostat.
The lodge includes a pre-engineered gymnasium with full basketball court, rich wood panelling, and clerestory windows.
Category: Permanent: Commercial Housing: over 10,000 sf
Company: ATCO Structures & Logistics Ltd.
Building Use: Housing for Oil Sands Workers
Average Size of Modules: 12 x 60 x 12 feet
Total Square Feet: 120,000 sf
Days to complete: 856
2. Coal Yard Apartments, Ithaca, N.Y. - Permanent Modular
This four-story apartment building was designed to match architecturally to the existing buildings already at Coal Yard Apartments and the broad roof overhangs and the substantial colorful brackets that are reminiscent of the former terminal.
The building is a center corridor design with two- and three-bedroom apartments spanning multiple modules, making the apartments feel open and airy to the prospective renters. Interior amenities are matched to the requirements of the local market for this type of renter and include hardwood flooring, custom kitchens with extended height wall cabinets, and granite counter tops.
The modules are situated on a concrete parking garage that houses parking, the elevator, and mechanical systems. At the roof level, there is a garden terrace for tenants to enjoy the views over town as well as the sky and simple relaxation.
Category: Permanent: Commercial Housing: over 10,000 sf
Company: Champion Commercial Structures
Affiliate: Champion Commercial Structures (Direct)
Building Use: Graduate Student Apartments
Average Size of Modules: 14 x 62 x 12 feet
Total Square Feet: 27,800 sf
Days to complete: 389
[pagebreak]
3. Aviara Sales Centre, Burnaby, B.C. - Relocatable Modular
This 48 x 50-foot temporary pre-construction presentation center was designed to showcase a state-of-the-art, master-planned residential high-rise community located in the heart of one of the most vibrant neighborhoods in the city.
The presentation area incorporates a model room featuring photo and video displays of the proposed building. A stunning curved glass wall offers spectacular views of the architect-designed gardens and water feature overlooking the city below. Prospective buyers are invited to walk through to full-scale display suites replicating the layout, cools, and finishes of the living spaces being sold.
Category: Relocatable: Retail or Hospitality: over 2,000 sf
Company: Britco
Building Use: Custom Presentation Center
Average Size of Modules: 12 x 50 x 10 feet
Total Square Feet: 2,400 sf
Days to complete: 161
4. Tecno Fast ATCO Rental Office, Santiago, Chile - Renovated Reuse
To support the space requirements of an expanding business, Tecno Fast ATCO built a new office facility utilizing renovated units from a rental fleet. The main floor houses a comfortable lobby area with gourmet coffee point, low couches, pleasant lighting, meeting rooms, and kitchen facilities. The second floor features an open-plan office and a fitness facility.
Large windows throughout the office allow the ingress of natural light, while providing views over our modular manufacturing plant, service yard, and the Andes Mountains in the distance.
The two-story building uses repurposed modular buildings of different lengths, resulting in an interesting facade with a clearly defined and inviting entryway. Located on Ruta 5, the main north/south highway in Chile, the office serves as a highly visible advertisement for the company.
Category: Renovated Reuse: Greatest Renovation: under 10,000 sf
Company: ATCO Structures & Logistics Ltd.
Building Use: Office
Average Size of Modules: 10 x 38 x 9 feet
Total Square Feet: 6835 sf
Days to complete: 92
5. First Solar - AV Solar Ranch One, Los Angeles
Located in the Antelope Valley area of North Los Angeles County, the building houses the operations and maintenance team of a 230MW solar site that will produce sufficient electricity to support the annual energy needs of approximately 75,000 homes.
The project was developed to utilize a photovoltaic array for all building energy uses resulting in a net-zero building. A single-ply cool roof was combined with increased thermal insulation throughout the building to provide a highly efficient building envelope. Potable water usage was reduced by over 30% through the installation of high efficiency fixtures.
The building will continue to provide significant cost savings in the future since it is fully powered by the on site photovoltaic panels. As a Net Zero Energy building, the annual energy costs will be non-existent.
Main Category: Green Building Design
Category: Green Building
Entrant: Silver Creek Industries
Size: 89 x 49 x 15 feet
Total Square Feet: 4,361 sf
Read about all the Modular Building Institute Awards of Distinction winners.
Related Stories
| Sep 6, 2013
U40 Summit featured speaker: Arthur Gensler on how to build a world-class AEC practice
Gensler, founder of the world’s largest architecture firm, will talk about the role of the architect in society, the impact of great design, and the practicalities of starting and running a practice, and will offer advice for today’s young design and construction professionals.
| Sep 4, 2013
Augmented reality: 12 applications for design and construction professionals
Building Design+Construction reached out to AEC professionals who have studied and applied augmented reality and asked them to pinpoint applications that are ripe for the technology. Here’s what they had to offer.
| Sep 4, 2013
Augmented reality goes mainstream: 12 applications for design and construction firms
Thanks to inexpensive mobile devices and increasingly advanced software apps, Building Teams are finally able to bring their BIM models to life on the job site.
| Sep 4, 2013
K-12 school design that pays off for students
More and more educators are being influenced by the Reggio Emilia approach to pedagogy, with its mantra of “environment as the third teacher”—an approach that gives Building Teams a responsibility to pay even closer attention to the special needs of today’s schools.
| Sep 4, 2013
Smart building technology: Talking results at the BUILDINGChicago/ Greening the Heartland show
Recent advancements in technology are allowing owners to connect with facilities as never before, leveraging existing automation systems to achieve cost-effective energy improvements. This BUILDINGChicago presentation will feature Procter & Gamble’s smart building management program.
| Sep 4, 2013
Last chance to pre-register for BUILDINGChicago/Greening the Heartland Conference at 20% savings
Attendees of the BUILDINGChicago/Greening the Heartland Expo and Conference can still save 20% off the at-site registration fee by registering online in these final days before the event opens on September 9 and concludes on September 11.
| Sep 3, 2013
'School in a box' project will place school in San Diego public library
Thinking outside the box, LPA Inc. is designing a school inside a box. With an emphasis on three E’s—Engage, Educate, and Empower—e3 Civic High is now being constructed on the sixth and seventh floors of a public library in downtown San Diego. Library patrons will be able to see into the school via glass elevators, but will not have physical access to the school.
| Sep 3, 2013
Delinquency rate for commercial real estate loans at lowest level in three years
The delinquency rate for US commercial real estate loans in CMBS dropped for the third straight month to 8.38%. This represents a 10-basis-point drop since July's reading and a 175-basis-point improvement from a year ago.
| Sep 3, 2013
EDGE studio, GBBN announce merger
GBBN Architects and EDGE studio of Pittsburgh, Pennsylvania are very pleased to announce the merger of their firms under GBBN Architects effective September 1, 2013.
| Sep 3, 2013
Jon Pettit (1952-2013) - DLR Group Managing Principal
Jonathan (Jon) E. Pettit, AIA, died August 19, 2013 in Seattle following treatment for cancer. He was 61. Pettit was a DLR Group managing principal and practiced for his entire professional career with DLR Group.