The Modular Building Institute recently revealed the winners of its annual Awards of Distinction contest. There were 42 winners in all across six categories: Permanent Modular, Relocatable Modular, Renovated Reuse, Marketing Pieces, Green Building Designs, and Student Green Building.
Here are five winning projects that caught our eye (images and descriptions were provided by MBI):
1. MEG Energy Christina Lake Lodge, Near Conklin, A.B. - Permanent Modular
Voted the Judge's Choice for the competition, this lodge combines quality materials and fine craftsmanship to create the feel of a high-end ski lodge. The core facility features wood and metal inlays throughout and includes fireplaces, a theater, a recreational center, meeting rooms, a first-class fitness facility, and offices.
A number of large windows allow natural light into the buildings. The kitchen was designed with high attention to culinary processes, including high-end appliances, food handling flow and storage, efficient workspaces, and ease of cleaning.
The two-story dormitories are equipped with sound attenuating properties for the executive-level, 300-sf bedrooms. Each bedroom features a private bathroom, a workstation, refrigerator, large television, and a PTAC heating and cooling system controlled by a wall-mounted thermostat.
The lodge includes a pre-engineered gymnasium with full basketball court, rich wood panelling, and clerestory windows.
Category: Permanent: Commercial Housing: over 10,000 sf
Company: ATCO Structures & Logistics Ltd.
Building Use: Housing for Oil Sands Workers
Average Size of Modules: 12 x 60 x 12 feet
Total Square Feet: 120,000 sf
Days to complete: 856
2. Coal Yard Apartments, Ithaca, N.Y. - Permanent Modular
This four-story apartment building was designed to match architecturally to the existing buildings already at Coal Yard Apartments and the broad roof overhangs and the substantial colorful brackets that are reminiscent of the former terminal.
The building is a center corridor design with two- and three-bedroom apartments spanning multiple modules, making the apartments feel open and airy to the prospective renters. Interior amenities are matched to the requirements of the local market for this type of renter and include hardwood flooring, custom kitchens with extended height wall cabinets, and granite counter tops.
The modules are situated on a concrete parking garage that houses parking, the elevator, and mechanical systems. At the roof level, there is a garden terrace for tenants to enjoy the views over town as well as the sky and simple relaxation.
Category: Permanent: Commercial Housing: over 10,000 sf
Company: Champion Commercial Structures
Affiliate: Champion Commercial Structures (Direct)
Building Use: Graduate Student Apartments
Average Size of Modules: 14 x 62 x 12 feet
Total Square Feet: 27,800 sf
Days to complete: 389
[pagebreak]
3. Aviara Sales Centre, Burnaby, B.C. - Relocatable Modular
This 48 x 50-foot temporary pre-construction presentation center was designed to showcase a state-of-the-art, master-planned residential high-rise community located in the heart of one of the most vibrant neighborhoods in the city.
The presentation area incorporates a model room featuring photo and video displays of the proposed building. A stunning curved glass wall offers spectacular views of the architect-designed gardens and water feature overlooking the city below. Prospective buyers are invited to walk through to full-scale display suites replicating the layout, cools, and finishes of the living spaces being sold.
Category: Relocatable: Retail or Hospitality: over 2,000 sf
Company: Britco
Building Use: Custom Presentation Center
Average Size of Modules: 12 x 50 x 10 feet
Total Square Feet: 2,400 sf
Days to complete: 161
4. Tecno Fast ATCO Rental Office, Santiago, Chile - Renovated Reuse
To support the space requirements of an expanding business, Tecno Fast ATCO built a new office facility utilizing renovated units from a rental fleet. The main floor houses a comfortable lobby area with gourmet coffee point, low couches, pleasant lighting, meeting rooms, and kitchen facilities. The second floor features an open-plan office and a fitness facility.
Large windows throughout the office allow the ingress of natural light, while providing views over our modular manufacturing plant, service yard, and the Andes Mountains in the distance.
The two-story building uses repurposed modular buildings of different lengths, resulting in an interesting facade with a clearly defined and inviting entryway. Located on Ruta 5, the main north/south highway in Chile, the office serves as a highly visible advertisement for the company.
Category: Renovated Reuse: Greatest Renovation: under 10,000 sf
Company: ATCO Structures & Logistics Ltd.
Building Use: Office
Average Size of Modules: 10 x 38 x 9 feet
Total Square Feet: 6835 sf
Days to complete: 92
5. First Solar - AV Solar Ranch One, Los Angeles
Located in the Antelope Valley area of North Los Angeles County, the building houses the operations and maintenance team of a 230MW solar site that will produce sufficient electricity to support the annual energy needs of approximately 75,000 homes.
The project was developed to utilize a photovoltaic array for all building energy uses resulting in a net-zero building. A single-ply cool roof was combined with increased thermal insulation throughout the building to provide a highly efficient building envelope. Potable water usage was reduced by over 30% through the installation of high efficiency fixtures.
The building will continue to provide significant cost savings in the future since it is fully powered by the on site photovoltaic panels. As a Net Zero Energy building, the annual energy costs will be non-existent.
Main Category: Green Building Design
Category: Green Building
Entrant: Silver Creek Industries
Size: 89 x 49 x 15 feet
Total Square Feet: 4,361 sf
Read about all the Modular Building Institute Awards of Distinction winners.
Related Stories
| May 8, 2013
Preventable curtain wall failures - AIA/CES course
In many cases, curtain wall failures are caused by fairly simple errors that occur during the fabrication and installation process. This presentation will highlight common errors and when they typically occur.
| May 8, 2013
NBBJ appoints Tim Leberecht Chief Marketing Officer
NBBJ, a global architecture and design firm, today announced that it has appointed Tim Leberecht as its Chief Marketing Officer. Leberecht joins NBBJ from Frog Design where he led the marketing organization from 2006 to 2013 and helped transform the company into one of the world’s foremost design and innovation consultancies.
| May 7, 2013
First look: Golden State Warriors stadium by Snøhetta, AECOM
Architects Snøhetta and AECOM have revealed their latest renderings of a new stadium for NBA basketball team the Golden State Warriors on the waterfront in San Francisco.
| May 7, 2013
Renovated bridge building will anchor Nashville riverfront master plan
Renovations to the former Nashville Bridge Company building were recently completed, including a newly-built modern wing. The facility has been re-dubbed The Bridge Building and now offers spaces for meetings, parties, weddings, and other events.
| May 7, 2013
First look: Adrian Smith + Gordon Gill skyscraper designed to 'confuse the wind'
The 400-meter-high, 116-story Imperial Tower in Mumbai will feature a slender, rounded form optimized to withstand the area's strong wind currents.
| May 6, 2013
SAFTI FIRST announces 3D Autodesk Revit models for fire rated wall, window, and door systems
SAFTI FIRST, leading USA-manufacturer of fire rated glass and faming systems, is proud to announce that Autodesk Revit models are now available for its fire rated walls, window and door systems via www.safti.com and Autodesk Seek.
| May 6, 2013
7 major multifamily residential projects in the works
A $140 million redevelopment of a landmark, 45-building apartment complex in Los Angeles is among the nation's significant multifamily developments under way.
| May 3, 2013
5 common failures in paints and coatings
As experienced designers, contractors, and owners know, most paint and coating problems are correctable, but some are especially stubborn to address. Here is a partial compendium of typical failure modes and methods for addressing the problem.