The Modular Building Institute recently revealed the winners of its annual Awards of Distinction contest. There were 42 winners in all across six categories: Permanent Modular, Relocatable Modular, Renovated Reuse, Marketing Pieces, Green Building Designs, and Student Green Building.
Here are five winning projects that caught our eye (images and descriptions were provided by MBI):
1. MEG Energy Christina Lake Lodge, Near Conklin, A.B. - Permanent Modular
Voted the Judge's Choice for the competition, this lodge combines quality materials and fine craftsmanship to create the feel of a high-end ski lodge. The core facility features wood and metal inlays throughout and includes fireplaces, a theater, a recreational center, meeting rooms, a first-class fitness facility, and offices.
A number of large windows allow natural light into the buildings. The kitchen was designed with high attention to culinary processes, including high-end appliances, food handling flow and storage, efficient workspaces, and ease of cleaning.
The two-story dormitories are equipped with sound attenuating properties for the executive-level, 300-sf bedrooms. Each bedroom features a private bathroom, a workstation, refrigerator, large television, and a PTAC heating and cooling system controlled by a wall-mounted thermostat.
The lodge includes a pre-engineered gymnasium with full basketball court, rich wood panelling, and clerestory windows.
Category: Permanent: Commercial Housing: over 10,000 sf
Company: ATCO Structures & Logistics Ltd.
Building Use: Housing for Oil Sands Workers
Average Size of Modules: 12 x 60 x 12 feet
Total Square Feet: 120,000 sf
Days to complete: 856
2. Coal Yard Apartments, Ithaca, N.Y. - Permanent Modular
This four-story apartment building was designed to match architecturally to the existing buildings already at Coal Yard Apartments and the broad roof overhangs and the substantial colorful brackets that are reminiscent of the former terminal.
The building is a center corridor design with two- and three-bedroom apartments spanning multiple modules, making the apartments feel open and airy to the prospective renters. Interior amenities are matched to the requirements of the local market for this type of renter and include hardwood flooring, custom kitchens with extended height wall cabinets, and granite counter tops.
The modules are situated on a concrete parking garage that houses parking, the elevator, and mechanical systems. At the roof level, there is a garden terrace for tenants to enjoy the views over town as well as the sky and simple relaxation.
Category: Permanent: Commercial Housing: over 10,000 sf
Company: Champion Commercial Structures
Affiliate: Champion Commercial Structures (Direct)
Building Use: Graduate Student Apartments
Average Size of Modules: 14 x 62 x 12 feet
Total Square Feet: 27,800 sf
Days to complete: 389
[pagebreak]
3. Aviara Sales Centre, Burnaby, B.C. - Relocatable Modular
This 48 x 50-foot temporary pre-construction presentation center was designed to showcase a state-of-the-art, master-planned residential high-rise community located in the heart of one of the most vibrant neighborhoods in the city.
The presentation area incorporates a model room featuring photo and video displays of the proposed building. A stunning curved glass wall offers spectacular views of the architect-designed gardens and water feature overlooking the city below. Prospective buyers are invited to walk through to full-scale display suites replicating the layout, cools, and finishes of the living spaces being sold.
Category: Relocatable: Retail or Hospitality: over 2,000 sf
Company: Britco
Building Use: Custom Presentation Center
Average Size of Modules: 12 x 50 x 10 feet
Total Square Feet: 2,400 sf
Days to complete: 161
4. Tecno Fast ATCO Rental Office, Santiago, Chile - Renovated Reuse
To support the space requirements of an expanding business, Tecno Fast ATCO built a new office facility utilizing renovated units from a rental fleet. The main floor houses a comfortable lobby area with gourmet coffee point, low couches, pleasant lighting, meeting rooms, and kitchen facilities. The second floor features an open-plan office and a fitness facility.
Large windows throughout the office allow the ingress of natural light, while providing views over our modular manufacturing plant, service yard, and the Andes Mountains in the distance.
The two-story building uses repurposed modular buildings of different lengths, resulting in an interesting facade with a clearly defined and inviting entryway. Located on Ruta 5, the main north/south highway in Chile, the office serves as a highly visible advertisement for the company.
Category: Renovated Reuse: Greatest Renovation: under 10,000 sf
Company: ATCO Structures & Logistics Ltd.
Building Use: Office
Average Size of Modules: 10 x 38 x 9 feet
Total Square Feet: 6835 sf
Days to complete: 92
5. First Solar - AV Solar Ranch One, Los Angeles
Located in the Antelope Valley area of North Los Angeles County, the building houses the operations and maintenance team of a 230MW solar site that will produce sufficient electricity to support the annual energy needs of approximately 75,000 homes.
The project was developed to utilize a photovoltaic array for all building energy uses resulting in a net-zero building. A single-ply cool roof was combined with increased thermal insulation throughout the building to provide a highly efficient building envelope. Potable water usage was reduced by over 30% through the installation of high efficiency fixtures.
The building will continue to provide significant cost savings in the future since it is fully powered by the on site photovoltaic panels. As a Net Zero Energy building, the annual energy costs will be non-existent.
Main Category: Green Building Design
Category: Green Building
Entrant: Silver Creek Industries
Size: 89 x 49 x 15 feet
Total Square Feet: 4,361 sf
Read about all the Modular Building Institute Awards of Distinction winners.
Related Stories
| Dec 7, 2010
Product of the Week: Petersen Aluminum’s column covers used in IBM’S new offices
IBM’s new offices at Dulles Station West in Herndon, Va., utilized Petersen’s PAC-1000 F Flush Series column covers. The columns are within the office’s Mobility Area, which is designed for a mobile workforce looking for quick in-and-out work space. The majority of workspaces in the office are unassigned and intended to be used on a temporary basis.
| Dec 6, 2010
Honeywell survey
Rising energy costs and a tough economic climate have forced the nation’s school districts to defer facility maintenance and delay construction projects, but they have also encouraged districts to pursue green initiatives, according to Honeywell’s second annual “School Energy and Environment Survey.”
| Dec 2, 2010
GKV Architects wins best guest room design award for Park Hyatt Istanbul
Gerner Kronick + Valcarcel, Architects, PC won the prestigious Gold Key Award for Excellence in Hospitality Design for best guest room, Park Hyatt Macka Palas, Istanbul, Turkey. Park Hyatt Maçka Palace marries historic and exotic elements with modern and luxurious, creating a unique space perpetuating Istanbul’s current culture. In addition to the façade restoration, GKV Architects designed 85 guestrooms, five penthouse suites, an ultra-hip rooftop bar, and a first-of-its-kind for Istanbul – a steakhouse, for the luxury hotel.
| Dec 2, 2010
U.S Energy Secretary Chu announces $21 Million to improve energy use in commercial buildings
U.S. Energy Secretary Steven Chu announced that 24 projects are receiving a total of $21 million in technical assistance to dramatically reduce the energy used in their commercial buildings. This initiative will connect commercial building owners and operators with multidisciplinary teams including researchers at DOE's National Laboratories and private sector building experts. The teams will design, construct, measure, and test low-energy building plans, and will help accelerate the deployment of cost-effective energy-saving measures in commercial buildings across the United States.
| Nov 29, 2010
Data Centers: Keeping Energy, Security in Check
Power consumption for data centers doubled from 2000 and 2006, and it is anticipated to double again by 2011, making these mission-critical facilities the nation’s largest commercial user of electric power. Major technology companies, notably Hewlett-Packard, Cisco Systems, and International Business Machines, are investing heavily in new data centers. HP, which acquired technology services provider EDS in 2008, announced in June that it would be closing many of its older data centers and would be building new, more highly optimized centers around the world.
| Nov 29, 2010
New Design Concepts for Elementary and Secondary Schools
Hard hit by the economy, new construction in the K-12 sector has slowed considerably over the past year. Yet innovation has continued, along with renovations and expansions. Today, Building Teams are showing a keener focus on sustainable design, as well as ways to improve indoor environmental quality (IEQ), daylighting, and low-maintenance finishes such as flooring.
| Nov 29, 2010
Renovating for Sustainability
Motivated by the prospect of increased property values, reduced utility bills, and an interest in jumping on the sustainability bandwagon, a noted upturn in green building upgrades is helping designers and real estate developers stay busy while waiting for the economy to recover. In fact, many of the larger property management outfits have set up teams to undertake projects seeking LEED for Existing Buildings: Operations & Maintenance (LEED-EBOM, also referred to as LEED-EB), a certification by the U.S. Green Building Council.
| Nov 23, 2010
The George W. Bush Presidential Center, which will house the former president’s library
The George W. Bush Presidential Center, which will house the former president’s library and museum, plus the Bush Institute, is aiming for LEED Platinum. The 226,565-sf center, located at Southern Methodist University, in Dallas, was designed by architect Robert A.M. Stern and landscape architect Michael Van Valkenburgh.
| Nov 23, 2010
Honeywell's School Energy and Environment Survey: 68% of districts delayed or eliminated improvements because of economy
Results of Honeywell's second annual “School Energy and Environment Survey” reveal that almost 90% of school leaders see a direct link between the quality and performance of school facilities, and student achievement. However, districts face several obstacles when it comes to keeping their buildings up to date and well maintained. For example, 68% of school districts have either delayed or eliminated building improvements in response to the economic downturn.