flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

5 reasons to enter the $20,000 Forge Prize

Steel Buildings

5 reasons to enter the $20,000 Forge Prize

Submissions for Stage 1 judging are due January 15.


By BD+C Staff | January 3, 2020
5 reasons to enter the $20,000 Forge Prize
5 reasons to enter the $20,000 Forge Prize

Calling all emerging architects. Don’t miss out on your chance to enter the $20,000 Forge Prize. Submissions for Stage 1 judging are due soon (January 15).

This unique design competition, established by the American Institute of Steel Construction (AISC), invites emerging architects to develop visionary design concepts that embrace steel as the primary structural component to increase project speed.

Here are five reasons to enter the $20,000 Forge Prize today:

1. Showcase your design talents on a national stage. All entries will be evaluated by a jury of design experts. The Finalists and Grand Prize Winner will be honored during an industry ceremony this spring. They will also be featured in national industry publications, including Modern Steel Construction and Building Design+Construction.

2. Solve a pressing social or industry issue. Whether environmental, economic, social, logistical, or technical, The Forge Prize is open to all ideas and concepts for building structures, as long as steel is the primary structural component on the project. 

3. Gain access to structural steel experts to enhance your design concept. All finalists will be paired with a steel fabricator who will provide advice and recommendations for enhancing the design submissions in preparation for final judging.

4. You'll have a chance to win one of three $10,000 finalist prizes to be used as a stipend to prepare for final judging.

5. You could be crowned the Grand Prize Winner and walk away with $20,000!

The Forge Prize is open to designers based in the United States. There is no entry fee. Enter by January 15, 2020.
 

ENTER THE FORGE PRIZE COMPETITION NOW

   

Related Stories

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 12, 2010

University of Toledo, Memorial Field House

27th Annual Reconstruction Awards—Silver Award. Memorial Field House, once the lovely Collegiate Gothic (ca. 1933) centerpiece (along with neighboring University Hall) of the University of Toledo campus, took its share of abuse after a new athletic arena made it redundant, in 1976. The ultimate insult occurred when the ROTC used it as a paintball venue.

| Oct 11, 2010

MBMA Releases Fire Resistance Design Guide for metal building systems

The Metal Building Manufacturers Association (MBMA) announces the release of the 2010 Fire Resistance Design Guide for Metal Building Systems. The guide provides building owners, architects, engineers, specifiers, fire marshals, building code officials, contractors, product vendors, builders and metal building manufacturers information on how to effectively meet fire resistance requirements of a project with metal building systems.

| Sep 13, 2010

7 Ways to Economize on Steel Buildings

Two veteran structural engineers give you the lowdown on how to trim costs the next time you build with steel.

| Sep 13, 2010

Stadium Scores Big with Cowboys' Fans

Jerry Jones, controversial billionaire owner of the Dallas Cowboys, wanted the team's new stadium in Arlington, Texas, to really amp up the fan experience. The organization spent $1.2 billion building a massive three-million-sf arena that seats 80,000 (with room for another 20,000) and has more than 300 private suites, some at field level-a first for an NFL stadium.

| Sep 13, 2010

Conquering a Mountain of Construction Challenges

Brutal winter weather, shortages of materials, escalating costs, occasional visits from the local bear population-all these were joys this Building Team experienced working a new resort high up in the Sierra Nevada.

| Aug 11, 2010

New data shows low construction prices may soon be coming to an end

New federal data released recently shows sharp increases in the prices of key construction materials like diesel, copper and brass mill shapes likely foreshadow future increases in construction costs, the Associated General Contractors of America said. The new November producer price index (PPI) report from the Bureau of Labor Statistics provide the strongest indication yet that construction prices are heading up, the association noted.

| Aug 11, 2010

Steel Joist Institute announces 2009 Design Awards

The Steel Joist Institute is now accepting entries for its 2009 Design Awards. The winning entries will be announced in November 2009 and the company with the winning project in each category will be awarded a $2,000 scholarship in its name to a school of its choice for an engineering student.

| Aug 11, 2010

Best AEC Firms of 2011/12

Later this year, we will launch Best AEC Firms 2012. We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021