flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

$61,000 awarded to students in Cleveland’s ACE Mentor Program

$61,000 awarded to students in Cleveland’s ACE Mentor Program

Mayor Frank G. Jackson gives keynote address at scholarship event for 80 Cleveland Metropolitan School District students involved in the ACE Mentor Program, which provides guidance and assistance for students interested in careers in the integrated construction industry.


By Posted by Tim Gregorski, Senior Editor | May 21, 2012
CMSD students in the ACE program received scholarships totaling more than $61,00
CMSD students in the ACE program received scholarships totaling more than $61,000

University Hospitals, together with Gilbane Building Co., and Regency Construction Services, Inc., awarded $61,000 in scholarships to students in the ACE (Architecture, Construction and Engineering) Mentor Program. This is the second $50,000 scholarship award made from the health system’s $200,000 donation to the ACE Mentor Program of Cleveland.  Individual student scholarships were provided by Gilbane and Regency while Kent State University, Cuyahoga Community College, and Cleveland State University provided matching scholarship awards to senior students entering architecture and engineering programs next fall.

Students presented their final design projects to a crowd of more than 250 family members, fellow students, community leaders and local businesses. A special guest panel of industry professionals provided input into the presentations, including Terry Schwartz, Director, Cleveland Urban Design Collaborative; Bob Brown, Director of City Planning, City of Cleveland; Hunter Morison, Director, YSU Urban Design Center; and Aparna Bapu, The Rise Group.

Thirty-five local architecture, engineering and construction firms provided more than 50 volunteers to mentor the students throughout the school year.  A selection of participating companies include Array Healthcare Facility Solutions, Architect; Barber & Hoffman, Structural Engineer; Chas E. Phipps Company, Material Supplier; Cleveland Educational Design Alliance, Architect; CT Consultants, Civil Engineer; Gilbane Building Company, Construction Manager; Herschman Architects, Architect; Michael Benza & Associates, Civil Engineer; PCS, Construction Manager; Regency Construction Services, Inc., Construction Manager; Stantec, Architect; Turner Construction Company, Construction Manager; URS, Architect/Engineer and VIP Restoration, Masonry Contractor. +

Related Stories

| Aug 11, 2010

Great Solutions: Healthcare

11. Operating Room-Integrated MRI will Help Neurosurgeons Get it Right the First Time A major limitation of traditional brain cancer surgery is the lack of scanning capability in the operating room. Neurosurgeons do their best to visually identify and remove the cancerous tissue, but only an MRI scan will confirm if the operation was a complete success or not.

| Aug 11, 2010

Great Solutions: Collaboration

9. HOK Takes Videoconferencing to A New Level with its Advanced Collaboration Rooms To help foster collaboration among its 2,212 employees while cutting travel time, expenses, and carbon emissions traveling between its 24 office locations, HOK is fitting out its major offices with prototype videoconferencing rooms that are like no other in the U.

| Aug 11, 2010

2009 Judging Panel

A Matthew H. Johnson, PE Associate Principal Simpson Gumpertz & HegerWaltham, Mass. B K. Nam Shiu, SE, PEVP Walker Restoration Consultants Elgin, Ill. C David P. Callan, PE, CEM, LEED APSVPEnvironmental Systems DesignChicago D Ken Osmun, PA, DBIA, LEED AP Group President, ConstructionWight & Company Darien, Ill.

| Aug 11, 2010

Inspiring Offices: Office Design That Drives Creativity

Office design has always been linked to productivity—how many workers can be reasonably squeezed into a given space—but why isn’t it more frequently linked to creativity? “In general, I don’t think enough people link the design of space to business outcome,” says Janice Linster, partner with the Minneapolis design firm Studio Hive.

| Aug 11, 2010

BIM school, green school: California's newest high-performance school

Nestled deep in the Napa Valley, the city of American Canyon is one of a number of new communities in Northern California that have experienced tremendous growth in the last five years. Located 42 miles northeast of San Francisco, American Canyon had a population of just over 9,000 in 2000; by 2008, that figure stood at 15,276, with 28% of the population under age 18.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021