In each issue of Building Design+Construction, we feature the latest new construction and renovation projects in our On the Drawing Board section. Here's a collection of recently profiled high-rise projects in the works around the world. They include Adrian Smith and Gordon Gill's whimsical Dancing Dragons tower in Seoul and a 1,312-foot-tall finance and trade center under construction in Nanning, China.
1. Mixed-use Towers in Seoul awake the dancing dragons
Adrian Smith + Gordon Gill Architecture designed Dancing Dragons, a pair of landmark mixed-use towers, for the new Yongsan International Business District in Seoul, South Korea. Slender mini-towers cantilevered around a central core make up the buildings, which include residential, “officetel,” and retail elements. The design aesthetic, including the building skin, includes aspects of traditional Korean culture. In both buildings the mini-tower cuts are clad in glass at the top and bottom, making for dramatic skylights above the units at the highest levels and a transparent floor beneath the units at the lowest levels. The Building Team also includes PositivEnergy Practice and Werner Sobek.
2. Supertall skyscraper planned for capital of Guangxi province
John Portman & Associates has been selected by developer Guangxi Wei Zhuang Real Estate Co. to design Tian Long Fortune Center, the first supertall skyscraper in Nanning, China. With a height of 1,312 feet, the building will provide new headquarters for member companies of ASEAN (Association of Southeast Asian Nations) and is envisioned as a finance and trade center. The upper portion of the tower will include an atrium hotel with a fitness center, pool, executive club, and restaurants. The building also will contain a public observation complex, providing a 360-degree view.
3. Residential building will offer luxury in newly enlivened Boston neighborhood
Blake Middleton, FAIA, and Deborah Moelis of Handel Architects designed Millennium Place, a 15-story residential building in Boston, located on the corner of Avery and Washington Streets. Developed by Millennium Partners, the building will serve as the keystone of the Avery Street Corridor, part of a new neighborhood recently brought to life. The 155-foot building consists of 256 residences, with one, two, and three bedrooms, ranging in size from 750 sf to 2,400 sf. Residences are expected to range in price from $550,000 to $2.8 million. Millennium Place is slated for initial occupancy in fall 2013. Suffolk Construction is the builder.
4. Corporate HQ in the works in Xiaoshan district
A 52-story office building is currently in development in the Xiaoshan District in Hangzhou, China. Designed by Chicago’s Turner + DeCelles for the Zhejiang Hengyi Group, the tower will provide office space for ~2,000 employees. A below-grade transit “superstation” will house conference facilities, retail shops, and parking. Approximately half of the office space will be held for future growth but leased to tenants on an interim basis. Also on the Building Team: BMP Project Consulting (program manager) and Tongji Architectural Design of Shanghai (local design firm).
5. 'Glass waterfall' façade highlights design of Education First HQ
Phase one of the 10-story, 300,000-sf headquarters for EF Education First, a Cambridge, Mass.-based private education company, is under way. Designed by Wingardh Arkitektkontor AB of Sweden and Wilson Architects, the facility will provide 230,000 sf of office and educational space, a 65,000-sf parking garage, a 14,000-sf restaurant, and 31,000 sf of ground- and mezzanine-level public space. In a design-build partnership, Skanska USA Building will serve as contractor, while TG Gallagher will provide HVAC, plumbing, and fire protection services.
6. Fourth-tallest building in Vancouver under construction on a tight site
Westbank Projects Corp. commissioned BIG-Bjarke Ingels Group to design a 49-story, 600-unit mixed-use tower in downtown Vancouver. Beach and Howe tower combines 653,890 sf of residential, retail, and commercial space in an urban complex at the entrance to the Granville Street Bridge. In response to a constricted urban site, BIG designed the tower to be inverted. The tower’s small triangular base curves away from the bridge to allow light and air to enter lower apartments. As it rises, the building’s shape transforms into larger, rectangular floor plates that culminate in a square top. Buro Happold engineering firm, working with the local engineer of record, Glotman Simpson, designed a concrete core with post-tensioned walls to protect against damage in case of an earthquake and also to improve performance. Other Building Team members: design firm Dialog, Cobalt Engineering, planning and landscape architecture firm PFS, and local architect James Cheng.
7. Downtown Dallas development will provide many tenant options
BOKA Powell, working with commercial real estate development and investment firm KDC, has created an adaptable design for the new 400,000-sf, Class A office tower at the Victory Park mixed-use development in downtown Dallas. The 23-story building, with more than 14 floors of office space above an eight-story parking structure, is designed to accommodate a wide variety of floor plate sizes, ranging from 25,000 to 54,000 sf, to meet the needs of a range of potential tenants. Construction is expected to begin in the fall. KDC will pursue LEED certification.
Related Stories
| Dec 17, 2013
Nation's largest net-zero K-12 school among winners of 2013 Best of Green Schools award
The Lady Bird Johnson Middle School in Irving, Texas, was named a winner of USGBC's annual award, along with nine other schools, individuals and communities working toward the common goal of healthy, high-performing learning places.
| Dec 16, 2013
Irving, Texas building state’s second net-zero school
Lee Elementary School, scheduled to open in fall 2014, will be net-zero-ready, and if the school board decides to sell district bonds and allow the purchase of additional solar panels, will be a true net-zero facility.
| Dec 13, 2013
Safe and sound: 10 solutions for fire and life safety
From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies.
| Dec 10, 2013
16 great solutions for architects, engineers, and contractors
From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.
| Dec 9, 2013
Tips for designing higher education's newest building type: the learning commons
In this era of scaled-down budgets, maximized efficiencies, new learning methods and social media’s domination of face time, college and university campuses are gravitating toward a new space type: the learning commons.
| Dec 5, 2013
Exclusive BD+C survey shows reaction to Sandy Hook tragedy
More than 60% of AEC professionals surveyed by BD+C said their firms experienced heightened interest in security measures from school districts they worked with.
| Nov 27, 2013
Exclusive survey: Revenues increased at nearly half of AEC firms in 2013
Forty-six percent of the respondents to an exclusive BD+C survey of AEC professionals reported that revenues had increased this year compared to 2012, with another 24.2% saying cash flow had stayed the same.
| Nov 27, 2013
Wonder walls: 13 choices for the building envelope
BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina.
| Nov 27, 2013
University reconstruction projects: The 5 keys to success
This AIA CES Discovery course discusses the environmental, economic, and market pressures affecting facility planning for universities and colleges, and outlines current approaches to renovations for critical academic spaces.
| Nov 26, 2013
Construction costs rise for 22nd straight month in November
Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.