In each issue of Building Design+Construction, we feature the latest new construction and renovation projects in a section called, On the Drawing Board. Here, we have assembled eight of the most notable cultural facility projects currently in the works. They include a soaring opera center in Hong Kong, a multi-tower music center in Calgary, and a massive expansion to the Country Music Hall of Fame and Museum in Nashville. Check them out below.
1. NATIONAL MUSIC CENTRE
UNITES ELEMENTS OF CANADIAN MUSICAllied Works Architecture is designing the National Music Centre, a project on the site of the historic King Edward Hotel and music venue in Calgary. The 160,000-sf museum, performance space, and teaching facility will combine new construction plus adaptive reuse of the “King Eddy,” ultimately comprising nine towers connected by pathways that bridge a major street. The old hotel will be completely refurbished, and will house a radio station, recording studios, classrooms, and performance and exhibition spaces. A new five-story building across the street will include museum and performance space. Also on the Building Team: Kasian (associate architect), Haley Sharpe Design (exhibition design), Fisher Dachs Associates (theater design), and CANA (CM).
2. DESIGN PARTNERSHIP TO CONDUCT PLANS FOR HONG KONG OPERA CENTER
Bing Thom Architects and Ronald Lu & Partners Company Ltd. have been chosen to design the Xiqu Centre, in Hong Kong. The opera center, scheduled to open in 2016, will be the first of 17 core arts and cultural venues to open in the West Kowloon Cultural District. The facility will include two auditoriums, with 1,100 and 400 seats, and a 280-seat teahouse, as well as training and educational facilities for the creation and development of Chinese and Cantonese opera works.
3. FORT LAUDERDALE PERFORMING ARTS CENTER TO GET UPGRADE
A joint venture between Stiles and Miller Construction Co. is renovating and expanding the 20-year-old Broward Center for the Performing Arts in downtown Fort Lauderdale, Fla. The 18-month upgrade is phased and planned to keep the center’s schedule of performances running smoothly while new amenities, a two-story waterfront pavilion, and terraced dining areas are added. A three-story arts education wing that will face Avenue of the Arts is also in the works. Wilson Butler Architects designed the project, with Jacobs Engineering Group as project manager.
4. NEW HOTEL, MUSEUM EXPANSION UNDER WAY IN MUSIC CITY
Brasfield & Gorrie is building the Omni Nashville Hotel and an addition to the Country Music Hall of Fame and Museum in downtown Nashville. The project, totaling 1.4 million sf, includes an 800-room hotel and 225,000-sf expansion to the Hall of Fame. The facility will encompass a ballroom, music venues, and restaurants. LEED Silver is targeted. Also on the Building Team: HKS (architect) and Earl Swennson Associates (associate architect).
5. NORTHWESTERN'S MUSIC SCHOOL AWAITS NEW HOME ON EVANSTON CAMPUS
The new home of Northwestern University’s Bienen School of Music will be located just south of the school’s Pick-Staiger Concert Hall on the southeastern edge of the Evanston campus. The 152,000-sf building will feature a 400-seat recital hall and a 150-seat opera rehearsal room-cum-black box theater. The project is slated to achieve at least LEED Silver certification. Building Team: Goettsch Partners (architect), Thornton Tomasetti (structural engineer), Cosentini Associates (MEP engineer), and Power Construction (general contractor). Planned completion: 2015.
6. ARTISTS AND VISITORS GO WITH THE FLOW AT NEW CONTEMPORARY ART INSTITUTE
The new Institute for Contemporary Art (ICA) at Virginia Commonwealth University, in Richmond, is designed to facilitate the way artists work today. Designed by Chris McVoy and Steven Holl of Steven Holl Architects, New York, N.Y., the 38,000-sf building will be part exhibition and performance space, part lab and incubator, fit to hold programming from visual art to theater to film. At the heart of the building will be a double-height “forum,” a flexible space that links the three levels of galleries. This floor plan will allow artists to create work that extends across spaces and permit visitors to circulate through the space via a variety of paths. BCWH Architects are the local architects on the project.
7. MARYLAND LIBRARY WILL HOUSE BOOKS WITH A SIDE OF ART
With a 22-month completion plan, The Lukmire Partnership (architect) and Costello Construction (general contractor) have teamed up to complete the 70,000-sf Silver Spring (Md.) Library. The five-story facility will house nonprofit art group Pyramid Atlantic in the basement and on the first two floors, with the library occupying floors three through five. The $35 million library, which is targeting LEED Silver certification, will feature all-glass curtain wall. A combined escalator system with ornamental staircase will be the focal point of the interior.
8. MEDGAR EVERS COLLEGE LIBRARY TO GET MAKEOVER
Medgar Evers College, a City University of New York (CUNY), is planning a $11 million renovation and addition to its 45,720-sf library in Brooklyn. The school commissioned ikon.5 Architects (architect) and MBI Group (general contractor) to head up the project, which will transform the 1980s facility into a contemporary information media commons. The 2,000-SF Welcome Center addition will feature a cafe with a full-height electronic media display, terrazzo floor, and bamboo-clad entry.
Related Stories
| Apr 24, 2014
Unbuilt and Famous: LEGO releases box set of Bjarke Ingels' LEGO museum
LEGO Architecture has created a box set that customers can use to build replicas of the LEGO Museum, which is not yet built in real life. The museum, designed by the Bjarke Ingels Group, will commemorate the history of LEGO.
| Apr 23, 2014
Ahead of the crowd: How architects can utilize crowdsourcing for project planning
Advanced methods of data collection, applied both prior to design and after opening, are bringing a new focus to the entire planning process.
| Apr 23, 2014
Developers change gears at Atlantic Yards after high-rise modular proves difficult
At 32 stories, the B2 residential tower at Atlantic Yards has been widely lauded as a bellwether for modular construction. But only five floors have been completed in 18 months.
| Apr 23, 2014
Experimental bot transfers CAD plans onto construction sites
The Archibot is intended to take technical data and translate it into full-scale physical markings on construction sites.
| Apr 23, 2014
Mean and Green: Top 10 green building projects for 2014 [slideshow]
The American Institute of Architects' Committee on the Environment has selected the top ten examples of sustainable architecture and ecological design projects that protect and enhance the environment. Projects range from a project for Portland's homeless to public parks to a LEED Platinum campus center.
| Apr 23, 2014
Architecture Billings Index dips in March
The March ABI score was 48.8, down sharply from a mark of 50.7 in February. This score reflects a decrease in design services.
Sponsored | | Apr 23, 2014
Ridgewood High satisfies privacy, daylight and code requirements with fire rated glass
For a recent renovation of a stairwell and exit corridors at Ridgewood High School in Norridge, Ill., the design team specified SuperLite II-XL 60 in GPX Framing for its optical clarity, storefront-like appearance, and high STC ratings.
| Apr 22, 2014
Transit-friendly apartment building now under construction
The new $44 million community is situated on eight acres, directly adjacent to the local Park-n-Ride, and a quick walk from a nearby light rail station.
| Apr 22, 2014
Bright and bustling: Grimshaw reveals plans for the Istanbul Grand Airport [slideshow]
In partnership with the Nordic Office of Architecture and Haptic Architects, Grimshaw Architects has revealed its plans for the terminal of what will be one of the world's busiest airports. The terminal is expected to serve 150 million passengers per year.
| Apr 21, 2014
10 design-build best practices
Design-build requires more than a good contract and appropriate risk allocation, says the DBIA. Everyone from the owner to the subcontractors must understand the process, the expectations, and fully engage in the collaboration.