flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

8 cool cultural projects in the works

8 cool cultural projects in the works

Learn which AEC firms are behind some of the most notable performing arts, library, and museum projects.


By BD+C Staff | March 22, 2013
This article first appeared in the BD+C March 2013 issue of BD+C.

In each issue of Building Design+Construction, we feature the latest new construction and renovation projects in a section called, On the Drawing Board. Here, we have assembled eight of the most notable cultural facility projects currently in the works. They include a soaring opera center in Hong Kong, a multi-tower music center in Calgary, and a massive expansion to the Country Music Hall of Fame and Museum in Nashville. Check them out below.

 

 

 

1. NATIONAL MUSIC CENTRE UNITES ELEMENTS OF CANADIAN MUSIC

Allied Works Architecture is designing the National Music Centre, a project on the site of the historic King Edward Hotel and music venue in Calgary. The 160,000-sf museum, performance space, and teaching facility will combine new construction plus adaptive reuse of the “King Eddy,” ultimately comprising nine towers connected by pathways that bridge a major street. The old hotel will be completely refurbished, and will house a radio station, recording studios, classrooms, and performance and exhibition spaces. A new five-story building across the street will include museum and performance space. Also on the Building Team: Kasian (associate architect), Haley Sharpe Design (exhibition design), Fisher Dachs Associates (theater design), and CANA (CM).

 

2. DESIGN PARTNERSHIP TO CONDUCT PLANS FOR HONG KONG OPERA CENTER

Bing Thom Architects and Ronald Lu & Partners Company Ltd. have been chosen to design the Xiqu Centre, in Hong Kong. The opera center, scheduled to open in 2016, will be the first of 17 core arts and cultural venues to open in the West Kowloon Cultural District. The facility will include two auditoriums, with 1,100 and 400 seats, and a 280-seat teahouse, as well as training and educational facilities for the creation and development of Chinese and Cantonese opera works.

 

3. FORT LAUDERDALE PERFORMING ARTS CENTER TO GET UPGRADE

A joint venture between Stiles and Miller Construction Co. is renovating and expanding the 20-year-old Broward Center for the Performing Arts in downtown Fort Lauderdale, Fla. The 18-month upgrade is phased and planned to keep the center’s schedule of performances running smoothly while new amenities, a two-story waterfront pavilion, and terraced dining areas are added. A three-story arts education wing that will face Avenue of the Arts is also in the works. Wilson Butler Architects designed the project, with Jacobs Engineering Group as project manager.

 

4. NEW HOTEL, MUSEUM EXPANSION UNDER WAY IN MUSIC CITY

Brasfield & Gorrie is building the Omni Nashville Hotel and an addition to the Country Music Hall of Fame and Museum in downtown Nashville. The project, totaling 1.4 million sf, includes an 800-room hotel and 225,000-sf expansion to the Hall of Fame. The facility will encompass a ballroom, music venues, and restaurants. LEED Silver is targeted. Also on the Building Team: HKS  (architect) and Earl Swennson Associates (associate architect).

 

5. NORTHWESTERN'S MUSIC SCHOOL AWAITS NEW HOME ON EVANSTON CAMPUS

The new home of Northwestern University’s Bienen School of Music will be located just south of the school’s Pick-Staiger Concert Hall on the southeastern edge of the Evanston campus. The 152,000-sf building will feature a 400-seat recital hall and a 150-seat opera rehearsal room-cum-black box theater. The project is slated to achieve at least LEED Silver certification. Building Team: Goettsch Partners (architect), Thornton Tomasetti (structural engineer), Cosentini Associates (MEP engineer), and Power Construction (general contractor). Planned completion: 2015.

 

6. ARTISTS AND VISITORS GO WITH THE FLOW AT NEW CONTEMPORARY ART INSTITUTE

The new Institute for Contemporary Art (ICA) at Virginia Commonwealth University, in Richmond, is designed to facilitate the way artists work today. Designed by Chris McVoy and Steven Holl of Steven Holl Architects, New York, N.Y., the 38,000-sf building will be part exhibition and performance space, part lab and incubator, fit to hold programming from visual art to theater to film. At the heart of the building will be a double-height “forum,” a flexible space that links the three levels of galleries. This floor plan will allow artists to create work that extends across spaces and permit visitors to circulate through the space via a variety of paths. BCWH Architects are the local architects on the project.

7. MARYLAND LIBRARY WILL HOUSE BOOKS WITH A SIDE OF ART

With a 22-month completion plan, The Lukmire Partnership (architect) and Costello Construction (general contractor) have teamed up to complete the 70,000-sf Silver Spring (Md.) Library. The five-story facility will house nonprofit art group Pyramid Atlantic in the basement and on the first two floors, with the library occupying floors three through five. The $35 million library, which is targeting LEED Silver certification, will feature all-glass curtain wall. A combined escalator system with ornamental staircase will be the focal point of the interior.

 

8. MEDGAR EVERS COLLEGE LIBRARY TO GET MAKEOVER

Medgar Evers College, a City University of New York (CUNY), is planning a $11 million renovation and addition to its 45,720-sf library in Brooklyn. The school commissioned ikon.5 Architects (architect) and MBI Group (general contractor) to head up the project, which will transform the 1980s facility into a contemporary information media commons. The 2,000-SF Welcome Center addition will feature a cafe with a full-height electronic media display, terrazzo floor, and bamboo-clad entry. 

Related Stories

| Feb 11, 2011

RS Means Cost Comparison Chart: Office Buildings

This month's RS Means Cost Comparison Chart focuses on office building construction.

| Feb 11, 2011

Sustainable features on the bill for dual-building performing arts center at Soka University of America

The $73 million Soka University of America’s new performing arts center and academic complex recently opened on the school’s Aliso Viejo, Calif., campus. McCarthy Building Companies and Zimmer Gunsul Frasca Architects collaborated on the two-building project. One is a three-story, 47,836-sf facility with a grand reception lobby, a 1,200-seat auditorium, and supports spaces. The other is a four-story, 48,974-sf facility with 11 classrooms, 29 faculty offices, a 150-seat black box theater, rehearsal/dance studio, and support spaces. The project, which has a green roof, solar panels, operable windows, and sun-shading devices, is going for LEED Silver.

| Feb 11, 2011

BIM-enabled Texas church complex can broadcast services in high-def

After two years of design and construction, members of the Gateway Church in Southland, Texas, were able to attend services in their new 4,000-seat facility in late 2010. Located on a 180-acre site, the 205,000-sf complex has six auditoriums, including a massive 200,000-sf Worship Center, complete with catwalks, top-end audio and video system, and high-definition broadcast capabilities. BIM played a significant role in the building’s design and construction. Balfour Beatty Construction and Beck Architecture formed the nucleus of the Building Team.

| Feb 11, 2011

Kentucky’s first green adaptive reuse project earns Platinum

(FER) studio, Inglewood, Calif., converted a 115-year-old former dry goods store in Louisville, Ky., into a 10,175-sf mixed-use commercial building earned LEED Platinum and holds the distinction of being the state’s first adaptive reuse project to earn any LEED rating. The facility, located in the East Market District, houses a gallery, event space, offices, conference space, and a restaurant. Sustainable elements that helped the building reach its top LEED rating include xeriscaping, a green roof, rainwater collection and reuse, 12 geothermal wells, 81 solar panels, a 1,100-gallon ice storage system (off-grid energy efficiency is 68%) and the reuse and recycling of construction materials. Local firm Peters Construction served as GC.

| Feb 11, 2011

Former Richardson Romanesque hotel now houses books, not beds

The Piqua (Ohio) Public Library was once a late 19th-century hotel that sat vacant and deteriorating for years before a $12.3 million adaptive reuse project revitalized the 1891 building. The design team of PSA-Dewberry, MKC Associates, and historic preservation specialist Jeff Wray Associates collaborated on the restoration of the 80,000-sf Richardson Romanesque building, once known as the Fort Piqua Hotel. The team restored a mezzanine above the lobby and repaired historic windows, skylight, massive fireplace, and other historic details. The basement, with its low ceiling and stacked stone walls, was turned into a castle-like children’s center. The Piqua Historical Museum is also located within the building.

| Feb 11, 2011

Justice center on Fall River harbor serves up daylight, sustainable elements, including eucalyptus millwork

Located on historic South Main Street in Fall River, Mass., the Fall River Justice Center opened last fall to serve as the city’s Superior and District Courts building. The $85 million facility was designed by Boston-based Finegold Alexander + Associates Inc., with Dimeo Construction as CM and Arup as MEP. The 154,000-sf courthouse contains nine courtrooms, a law library, and a detention area. Most of the floors have the same ceiling height, which will makes them easier to reconfigure in the future as space needs change. Designed to achieve LEED Silver, the facility’s elliptical design offers abundant natural daylight and views of the harbor. Renewable eucalyptus millwork is one of the sustainable features.

| Feb 11, 2011

Research facility separates but also connects lab spaces

California State University, Northridge, consolidated its graduate and undergraduate biology and mathematics programs into one 90,000-sf research facility. Architect of record Cannon Design worked on the new Chaparral Hall, creating a four-story facility with two distinct spaces that separate research and teaching areas; these are linked by faculty offices to create collaborative spaces. The building houses wet research, teaching, and computational research labs, a 5,000-sf vivarium, classrooms, and administrative offices. A four-story outdoor lobby and plaza and an outdoor staircase provide orientation. A covered walkway links the new facility with the existing science complex. Saiful/Bouquet served as structural engineer, Bard, Rao + Athanas Consulting Engineers served as MEP, and Research Facilities Design was laboratory consultant.

| Feb 11, 2011

A feast of dining options at University of Colorado community center, but hold the buffalo stew

The University of Colorado, Boulder, cooked up something different with its new $84.4 million Center for Community building, whose 900-seat foodservice area consists of 12 micro-restaurants, each with its own food options and décor. Centerbrook Architects of Connecticut collaborated with Denver’s Davis Partnership Architects and foodservice designer Baker Group of Grand Rapids, Mich., on the 323,000-sf facility, which also includes space for a career center, international education, and counseling and psychological services. Exterior walls of rough-hewn, variegated sandstone and a terra cotta roof help the new facility blend with existing campus buildings. Target: LEED Gold.

| Feb 11, 2011

Chicago high-rise mixes condos with classrooms for Art Institute students

The Legacy at Millennium Park is a 72-story, mixed-use complex that rises high above Chicago’s Michigan Avenue. The glass tower, designed by Solomon Cordwell Buenz, is mostly residential, but also includes 41,000 sf of classroom space for the School of the Art Institute of Chicago and another 7,400 sf of retail space. The building’s 355 one-, two-, three-, and four-bedroom condominiums range from 875 sf to 9,300 sf, and there are seven levels of parking. Sky patios on the 15th, 42nd, and 60th floors give owners outdoor access and views of Lake Michigan.

| Feb 11, 2011

Iowa surgery center addresses both inpatient and outpatient care

The 12,000-person community of Carroll, Iowa, has a new $28 million surgery center to provide both inpatient and outpatient care. Minneapolis-based healthcare design firm Horty Elving headed up the four-story, 120,000-sf project for St. Anthony’s Regional Hospital. The center’s layout is based on a circular process flow, and includes four 800-sf operating rooms with poured rubber floors to reduce leg fatigue for surgeons and support staff, two substerile rooms between each pair of operating rooms, and two endoscopy rooms adjacent to the outpatient prep and recovery rooms. Recovery rooms are clustered in groups of four. The large family lounge (left) has expansive windows with views of the countryside, and television monitors that display coded information on patient status so loved ones can follow a patient’s progress.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021