The American Architectural Manufacturers Association (AAMA) updated a document for evaluating the performance and durability of rollers used in the operation of sliding doors and lift and slide doors.
AAMA 906-18, "Voluntary Specification for Sliding Door and Lift and Slide Roller Assemblies," was first released in 2005 and was last updated in 2015. "The 906 document was updated to reflect testing of large weight capacity rated sliding door rollers," said Jan Huml, chair of the AAMA 906 Lift and Slide Roller Assemblies Task Group.
“We changed the dwell cycle time because test labs were concerned about injuries during testing, with rollers being tested at weights up to 1,500 pounds per pair with fast dwell speeds,” Huml said. A panel weighing up to 1,500 pounds operates at slow operating speeds in the real world, which the new dwell time changes address, he added.
Representative samples of the door rollers are evaluated for performance at the weight rating specified by the roller manufacturer by cycling the rollers under load for 10,000 cycles. Clearance and operating force measurements are taken before and after the cycle test to ensure performance remains within specified tolerances.
Related Stories
Codes and Standards | Dec 5, 2018
Canadian retailer builds net-zero stores
Other chains also boost green efforts with PVs, EV charging stations.
Codes and Standards | Dec 4, 2018
Action on building codes would spur low-carbon cities
Faster retrofit cycles, increased energy-efficiency requirements for existing buildings needed.
Codes and Standards | Nov 30, 2018
Best solution to prevent California wildfire disasters: Stop building in places likely to burn
Approach would be unpopular as people attracted to stunning wooded landscapes.
Codes and Standards | Nov 29, 2018
USGBC and BRE form partnership
Two green standards groups will collaborate on standards, platforms, and research.
Codes and Standards | Nov 29, 2018
Parking garages in N.Y. State will have to be inspected every three years
Professional engineer must assess conditions.
Codes and Standards | Nov 28, 2018
To build water-efficient cities, water managers and urban planners must coordinate better
Lack of time and resources, and practitioners not in habit of working together hamper efforts.
Codes and Standards | Nov 26, 2018
All LEED-certified buildings eligible for LEED recertification
Projects must submit 12 months of data demonstrating continued or improved performance.
Codes and Standards | Nov 20, 2018
OSHA publishes updates to crane operator certification requirements
Long-delayed rules accept certifications by type or type and capacity.
Codes and Standards | Nov 19, 2018
Guide offers understanding of elements that create successful multi-floor communal spaces
CTBUH technical document analyzes how to approach tall urban habitat.
Codes and Standards | Nov 16, 2018
2018 International Green Construction Code released
Updated version helps governments streamline code development and adoption.