Today Abbott Construction announced that they have merged with STO Building Group to become a member of the STO family of companies. The merger will allow both firms to leverage each other’s geographic reach to better serve clients with multiple locations and enhance the services and areas of expertise they can offer across that expanded footprint.
“We see joining the STO family as an exciting next step in what we can offer our clients and our employees without sacrificing who we are and have been for the past 35-plus years,” says Troy Stedman, president and CEO of Abbott. “We know from first-hand experience working together that our companies value integrity, collaboration, and a client-first way of doing business, so formally joining forces makes perfect sense.”
“From our existing relationship working with Abbott on two significant joint venture projects, we are confident that this merger is a great fit for both companies,” says David Layton, president and CEO of Layton Construction, who Abbott will report through. “And with Layton’s proximity to the Pacific Northwest and existing presence in Southern California, we’re looking forward to helping Abbott grow in those core markets.”
Founded in 1983, Abbott is a West Coast commercial builder known for superior planning and execution. They work with clients in a variety of sectors such as healthcare, hospitality, education, non-profit, retail, and tenant interiors. Some of their most notable recent projects include the Mary Bridge Children’s Hospital and University of Puget Sound Welcome Center in Tacoma, WA; FAA Northwest Mountain Regional Headquarters in Des Moines, WA; Big Fish Games Seattle headquarters, the UCLA Margo Leavin Graduate Art Studios in Culver City, CA, and h. Club Los Angeles.
“The Pacific Northwest has been a key strategic market for the STO Building Group, and Abbott is a terrific addition to our family of companies,” says Robert Mullen, STO Building Group CEO. “By joining forces, both firms can leverage each other’s geographic reach and take advantage of each other’s strengths, relationships, geographies, and resources to better serve our clients across the globe.”
Formerly operating as the Structure Tone Organization, STO restructured as the STO Building Group in 2018 to provide a platform for growth that allows each of its member companies to maintain their cultural identity while leveraging the strengths of a multicompany organization. In the last four years, Canadian firm Govan Brown and US firms Ajax Building Company, BCCI Construction, and Layton Construction have merged with STO Building Group.
“The opportunity to merge with such an incredible firm as Abbott is exactly why we shifted our structure to STO Building Group,” says James Donaghy, STO Building Group executive chairman. “We value the reputation and heritage of the firms who merge with our organization, and each has kept its identity as a way to honor that legacy. As we continue to grow, we want to respect that history, but also reflect the collective expertise our companies offer and allow our employees to benefit from the larger organization’s resources.”
Now part of the STO Building Group family of companies, Abbott will keep its identity, and its current leaders will retain an ownership position in the organization and maintain their roles as the senior leadership team of the business. It is anticipated that new job opportunities will be created as a result of the merger to support the company’s projected growth for 2021 and beyond.
Related Stories
Coronavirus | May 18, 2020
Infection control in office buildings: Preparing for re-occupancy amid the coronavirus
Making workplaces safer will require behavioral resolve nudged by design.
Data Centers | May 8, 2020
Data centers as a service: The next big opportunity for design teams
As data centers compete to process more data with lower latency, the AEC industry is ideally positioned to develop design standards that ensure long-term flexibility.
Coronavirus | Apr 30, 2020
Gilbane shares supply-chain status of products affected by coronavirus
Imported products seem more susceptible to delays
Coronavirus | Apr 14, 2020
COVID-19 alert: Missouri’s first Alternate Care Facility ready for coronavirus patients
Missouri’s first Alternate Care Facility ready for coronavirus patients
AEC Tech | Apr 13, 2020
A robotic dog becomes part of Swinerton’s construction technology arsenal
Boston Dynamics, the robot’s creator, has about 100 machines in the field currently.
Coronavirus | Apr 8, 2020
COVID-19 alert: Most U.S. roofing contractors hit by coronavirus, says NRCA
NRCA survey shows 52% of roofing contractor said COVID-19 pandemic was having a significant or very significant impact on their businesses.
Coronavirus | Apr 5, 2020
COVID-19: Most multifamily contractors experiencing delays in projects due to coronavirus pandemic
The NMHC Construction Survey is intended to gauge the magnitude of the disruption caused by the COVID-19 outbreak on multifamily construction.
Coronavirus | Apr 4, 2020
COVID-19: Construction completed on first phase of Chicago's McCormick Place into Alternate Care Facility
Walsh Construction, one of the largest contractors in the city of Chicago and in the United States, is leading the temporary conversion of a portion of the McCormick Place Convention Center into an Alternate Care Facility (ACF) for novel coronavirus patients. Construction on the first 500 beds was completed on April 3.
Coronavirus | Mar 21, 2020
Associated General Contractors launches eight-part webinar series around COVID-19
The programming, which begins Monday, will offer advice on how businesses might need to adjust during the virus.