flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Abrazo Cave Creek Hospital completes in Cave Creek, Ariz.

Healthcare Facilities

Abrazo Cave Creek Hospital completes in Cave Creek, Ariz.

E4H Architecture designed the project.


By David Malone, Associate Editor | June 10, 2021
Abrazo Cave Creek Hospital exterior

Courtesy Abrazo Health

Abrazo Cave Creek Hospital, a 35,000-sf hospital located in Cave Creek, Ariz., has completed construction.

The new hospital features a 13-bed emergency department; an operating room and a three-bed pre-op/post-anesthesia care unit; eight inpatient rooms for overnight stays; an imaging suite for x-ray, ultrasound, and CT scans; and a laboratory. The emergency room will be open year-round, 24/7.

“Demand for micro hospitals in the Southwest has continued to grow, and our ability to quickly construct and deliver a hospital like this one enables providers to meet their patients’ medical needs closer to home,” said Scott Salyer, Regional Manager for Adolfson & Peterson Construction.

Construction on the hospital began in January 2020 and it is expected to open for patient care after completing equipment and supply delivery and setup in mid-2021. E4H Architecture designed the project and Adolfson & Peterson Construction was the general contractor.

Related Stories

| May 1, 2013

Groups urge Congress: Keep energy conservation requirements for government buildings

More than 350 companies urge rejection of special interest efforts to gut key parts of Energy Independence and Security Act

| May 1, 2013

World’s tallest children’s hospital pushes BIM to the extreme

The Building Team for the 23-story Lurie Children’s Hospital in Chicago implements an integrated BIM/VDC workflow to execute a complex vertical program.

| Apr 30, 2013

Tips for designing with fire rated glass - AIA/CES course

Kate Steel of Steel Consulting Services offers tips and advice for choosing the correct code-compliant glazing product for every fire-rated application. This BD+C University class is worth 1.0 AIA LU/HSW.

| Apr 30, 2013

Healthcare lighting innovation: Overhead fixture uses UV to kill airborne pathogens

Designed specifically for hospitals, nursing homes, child care centers, and other healthcare facilities where infection control is a concern, the Arcalux Health Risk Management System (HRMS) is an energy-efficient lighting fixture that doubles as a germ-killing machine.

| Apr 24, 2013

North Carolina bill would ban green rating systems that put state lumber industry at disadvantage

North Carolina lawmakers have introduced state legislation that would restrict the use of national green building rating programs, including LEED, on public projects.

| Apr 24, 2013

Los Angeles may add cool roofs to its building code

Los Angeles Mayor Antonio Villaraigosa wants cool roofs added to the city’s building code. He is also asking the Department of Water and Power (LADWP) to create incentives that make it financially attractive for homeowners to install cool roofs.

| Apr 10, 2013

ASHRAE publishes second edition to HVAC manual for healthcare facilities

The American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) has published a second edition of its “HVAC Design Manual for Hospitals and Clinics.”

| Apr 2, 2013

6 lobby design tips

If you do hotels, schools, student unions, office buildings, performing arts centers, transportation facilities, or any structure with a lobby, here are six principles from healthcare lobby design that make for happier users—and more satisfied owners.

| Apr 2, 2013

4 hospital lobbies provide a healthy perspective

A carefully considered entry zone can put patients at ease while sending a powerful branding message for your healthcare client. Our experts show how to do it through four project case studies.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021