flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Academy Museum of Motion Pictures set to open on Sept. 30 in Los Angeles

Museums

The Academy Museum of Motion Pictures set to open on Sept. 30 in Los Angeles

Renzo Piano Building Workshop designed the project.


By David Malone, Managing Editor | September 27, 2021
The Academy Museum of Motion Pictures sphere building
Patrick W. Price Architectural Photographer

The new Academy Museum of Motion Pictures is set to open on Sept. 30 at Wilshire Boulevard and Fairfax Avenue in Los Angeles. Renzo Piano Building Workshop designed the project in collaboration with Gensler as the executive architect.

The 300,000-sf project combines two contrasting structures; the renovated and expanded May Company building, a 1939 Streamline Moderne landmark now dubbed the Saban Building, and a new glass-and-concrete spherical building.

The 250,000-sf Saban Building houses the Fairfax Avenue entrance and Sidney Poitier Grand Lobby, the museum’s exhibition galleries, the 288-seat Ted Mann Theater, the Shirley Temple Education Studio, the Debbie Reynolds Conservation Studio, Fanny’s restaurant and cafe, and the Academy Museum Store. The 45,000-sf sphere building houses the 1,000-seat David Geffen Theater and the Dolby Family Terrace. The museum's massive, 690-panel orb theater is balanced on four mega-column supports designed to protect the museum from earthquakes.

Academy Museum aerial view
Patrick W. Price Architectural Photographer

Visitors can access the Sphere Building from the Saban Building via the Casey Wasserman Bridge at mezzanine level. The pedestrian bridge crosses over the David Geffen Theater and the Barbra Streisand Bridge on the fifth floor, which crosses over to the Dolby Family Terrace.

At the base of the sphere outside the northern entrance to the museum is The Walt Disney Company Piazza, which features dwarf southern magnolia trees and kart shrubs, California fan palms, vinca minor, Mexican fan palms, and jacaranda trees.

The Academy Museum’s 50,000 sf of gallery space will open with a series of exhibitions that honor the museum’s mission to share the history of cinema. Exhibitions will include the three-floor core exhibition Stories of Cinema, the first ever Hayao Miyazaki retrospective in North America, and other temporary exhibitions that advance the understanding, celebration, and preservation of cinema.

The Academy Museum build team comprised:

Architects: Renzo Piano Building Workshop in collaboration with Gensler

Project Manager: Paratus Group

Engineers and Consultants (in structural engineering; mechanical, electrical and plumbing engineering, lighting design, environmental design, energy modeling, and IT systems): Buro Happold

The project has been awarded LEED Gold certification.

Tags

Related Stories

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| Apr 6, 2012

Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning

The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.

| Mar 29, 2012

Construction completed on Las Vegas’ newest performing arts center

The Smith Center will be the first major multi-purpose performance center in the U.S. to earn Silver LEED certification.

| Mar 5, 2012

Franklin Institute in Philadelphia selects Skanska to construct new pavilion

The building has been designed by SaylorGregg Architects and will apply for LEED Silver certification.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Nov 9, 2011

Lincoln Center Pavilion wins national architecture and engineering award

The project team members include owner Lincoln Center for the Performing Arts, New York; design architect and interior designer of the restaurant, Diller Scofidio + Renfro, New York; executive architect, FXFOWLE, New York; and architect and interior designer of the film center, Rockwell Group, New York; structural engineer Arup (AISC Member), New York; and general contractor Turner Construction Company (AISC Member), New York. 

| Oct 12, 2011

BIM Clarification and Codification in a Louisiana Sports Museum

The Louisiana State Sports Hall of Fame celebrates the sporting past, but it took innovative 3D planning and coordination of the future to deliver its contemporary design.

| Oct 12, 2011

Consigli Construction breaks ground for Bigelow Laboratory Center for Ocean Health

  Consigli to build third phase of 64-acre Ocean Science and Education Campus, design by WBRC Architects , engineers in association with Perkins + Will

boombox1
boombox2
native1

More In Category

Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.




Museums

The Tampa Museum of Art will soon undergo a $110 million expansion

In Tampa, Fla., the Tampa Museum of Art will soon undergo a 77,904-sf Centennial Expansion project. The museum plans to reach its $110 million fundraising goal by late 2024 or early 2025 and then break ground. Designed by Weiss/Manfredi, and with construction manager The Beck Group, the expansion will redefine the museum’s surrounding site.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021