flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Acentech adds audiovisual expertise to Trevose, Penn. office

Acentech adds audiovisual expertise to Trevose, Penn. office

Artese focuses on advising, overseeing, and maintaining the client’s vision for the project from the initial kick-off meeting to the final commissioning of the completed systems.


By Posted by Tim Gregorski, Senior Editor | September 13, 2012
Perry J. Artese
Perry J. Artese

September 12, 2012 – Acentech Inc., multidisciplinary acoustics, audiovisual systems design, and vibration consulting firm, named Perry J. Artese to the firms’s Trevose, Penn. office as a senior consultant in the audiovisual systems design group.

Building on the firm’s audiovisual systems design expertise, Acentech is excited to apply Artese’s broad experience to projects in the mid-Atlantic region. Artese has many years of experience designing, specifying, and commissioning audiovisual systems for higher education, government, non-profits, and corporate/commercial facilities. His design work, coupled with his practical experience in the field, makes him qualified to envision projects from conception to completion. His years of experience have afforded Mr. Artese many opportunities to design a wide variety of current audiovisual technologies, including display, video, and audio conferencing, control, audio/video transport, lecture capture systems, and digital signage systems in signature facilities such as the FAA Headquarters and Temple University’s Fox School of Business.

As a senior consultant at Acentech, Artese focuses on advising, overseeing, and maintaining the client’s vision for the project from the initial kick-off meeting to the final commissioning of the completed systems. Artese is currently working on projects for Westminster Choir College New Academic Building, Temple University, The Shipley School, and Louis Brown Rutgers Athletic Center Expansion Project. +

Tags

Related Stories

| Nov 14, 2011

Griffin Electric completes electrical work at Cary Arts Center

  The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

| Nov 14, 2011

VanSumeren appointed to Traco general manager

VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco. 

| Nov 11, 2011

By the Numbers

What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 11, 2011

AIA: Engineered Brick + Masonry for Commercial Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam. 

| Nov 11, 2011

How Your Firm Can Win Federal + Military Projects

The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.

| Nov 10, 2011

BD+C's 28th Annual Reconstruction Awards

A total of 13 projects recognized as part of BD+C's 28th Annual Reconstruction Awards.

| Nov 10, 2011

Grousbeck Center for Students & Technology opens doors

New Perkins School for the Blind Building is dedicated to innovation, interaction, and independence for students.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021