Consolidation among architectural firms across the country marches forward, as Eppstein Uhen Architects, a 110-year-old firm based in Milwaukee, expanded its national reach with its acquisition of Denver-based Burkettdesign.
As a result of this transaction, whose terms were not disclosed, Burkettdesign, which was founded in 1990, will change its name to BurkettEUA. The combined firm now has licensed architects in 35 states, up from 25. Burkettdesign’s 27-person staff increases EUA’s employee count to more than 200.
Burkett’s leadership team—including owner Rick Burkett, AIA, NCARB, LEED AP; and principals Catherine Quintero, NCIDQ, ASID, IIDA, LEED AP ID+C; Michele Ponicsan, AIA, LEED AP; Gillian Hallock Johnson, Associate IIDA, LEED AP ID+C; and Kitty Yuen, AIA, NCIDQ, CDT, LEED AP—will become shareholders in Eppstein Uhen. Associate Principal Ben Niamthet, Associate AIA, also joins the other principals as a member of the core leadership team of BurkettEUA, according to the Milwaukee Journal-Sentinel.
“The fact that five principals are investing and becoming shareholders in EUA demonstrates our mutual long-term commitment to our clients and each other,” says Rich Tennessen, EUA’s president.
EUA specializes in designing schools, offices, health care facilities, senior living facilities and science and technology facilities. Its clients include a range of private and public organizations, such as GE Healthcare, Ascension, Baird, Northwestern Mutual and Johnson Controls.
BurkettEUA’s practices encompass healthcare, offices, financial institutions, education, hospitality, and culture. Its services include interior design and urban master planning.
Greg Uhen, AIA, NCARB, EUA’s chief executive, says his firm decided to expand into Denver based on that region’s growth projections. One of the plusses of merging with Burkett, he explains, is that the geographic overlap between the two firms is limited.
Related Stories
| Jul 2, 2014
First Look: Qatar World Cup stadium design references nomadic heritage
Organizers of the Qatar 2022 World Cup, the Supreme Committee for Delivery and Legacy, recently unveiled designs for the second stadium.
| Jul 2, 2014
SHoP designs what would be Brooklyn's tallest building
JDS Development partners with SHoP to construct a 70-story building at 775-feet tall, unprecedented for downtown Brooklyn.
| Jul 2, 2014
The doctor is in the firehouse: New clinic to be built in California fire station
Designed by WRNS Studio, the Firehouse Clinic will encourage local residents with limited healthcare access to consider them as an alternative to the emergency room, especially for preventive care.
| Jul 2, 2014
Emerging trends in commercial flooring
Rectangular tiles, digital graphic applications, the resurgence of terrazzo, and product transparency headline today’s commercial flooring trends.
| Jul 2, 2014
Grimshaw's 'kit of parts' design scheme selected for Qatar sports facilities program
The series of projects, called the Al Farjan Recreational Sports Facilities, have been designed in such a way that the same basic design can be adapted to the specific requirements of each site.
| Jul 1, 2014
Peter Zumthor's LA art museum plan modified with bridge-like section across main thoroughfare
After his design drew concerns about potential damage to LA's La Brea Tar Pits, Peter Zumthor has dramatically revised his concept for the Los Angeles Museum of Art.
| Jul 1, 2014
China's wild circular skyscraper opens in Guangzhou [slideshow]
The 33-story Guanghzou Circle takes the shape of a giant ribbon spool, with the floor space housed in a series of boxes suspended between two massive "wheels."
| Jul 1, 2014
Hyper-speed rendering: How Gensler turns BIM models into beauty shots in seconds
In search of a fast rendering solution, Gensler looked to the gaming and moviemaking industries for the next breakthrough tool: Octane Render.
| Jul 1, 2014
Sochi's 'kinetic façade' may steal the show at the Winter Olympics
The temporary pavilion for Russian telecom operator MegaFon will be wrapped with a massive digital "pin screen" that will morph into the shape of any face.
| Jul 1, 2014
7 ways to cut waste in BIM implementation
Process mapping, split models, and streamlined coordination meetings are among the timesaving techniques AEC firms are employing to improve BIM/VDC workflows.