Adolfson & Peterson, Inc. (A&P) has announced the appointment of Rick Whitney as Chief Executive Officer, effective October 1, 2014. In his new role, Whitney will be responsible for the company's strategic direction and the overall growth and performance of the business.
Whitney succeeds Interim CEO Steven Pinney, who has held the interim role since CEO Doug Jaeger stepped down in December 2013. Pinney will continue to serve A&P as Chairman of the Board of Directors.
Whitney brings broad experience in executive leadership roles and a strong background in construction management. For the last six years he held the position of President and Chief Executive Officer of M+W U.S., Inc., based in Watervliet, New York. M+W U.S. is part of the M+W Group, a leading design/builder of technology-driven manufacturing and research facilities headquartered in Stuttgart, Germany. Whitney also served as Chairman of the Board of M+W U.S., Inc. Throughout Whitney’s tenure as CEO, M+W U.S. experienced rapid and sustained growth. He spearheaded several initiatives to ensure the company’s profitability and led the company through the strategic acquisition of five companies.
Whitney’s career at M+W U.S. also included five years as Chief Operating Officer. In 2003 he founded Total Facility Solutions (TFS), a wholly owned subsidiary of M+W U.S., Inc., and served as the company’s CEO. TFS is a self-perform mechanical contractor specializing in high purity piping systems. Whitney also worked for Texas Instruments from 1983 until 1997, during which he oversaw construction in the Asia Pacific region for several years. He began his career as a civil engineer with the U.S. Army Corps of Engineers in both active duty and U.S. Army Reserve positions. Whitney holds a BS in Civil Engineering from The Citadel Military College of South Carolina and an MBA in Finance from the University of South Carolina.
“We welcome Rick to A&P at a pivotal time in our history,” said Interim CEO Steve Pinney. “A&P is firmly established as a national company with a well-diversified portfolio of work, and we are seeing many opportunities for growth. Rick’s strong leadership and his extensive background in engineering, construction and project management will be tremendous assets as we take A&P to the next level.”
Related Stories
| Nov 2, 2014
Top 10 LEED lessons learned from a green building veteran
M+W Group's David Gibney offers his top lessons learned from coordinating dozens of large LEED projects during the past 13 years.
| Oct 31, 2014
Dubai plans world’s next tallest towers
Emaar Properties has unveiled plans for a new project containing two towers that will top the charts in height, making them the world’s tallest towers once completed.
| Oct 29, 2014
Better guidance for appraising green buildings is steadily emerging
The Appraisal Foundation is striving to improve appraisers’ understanding of green valuation.
| Oct 29, 2014
Increasing number of design projects meeting carbon reduction targets, says AIA report
Of the 2,464 projects accounted for in AIA's 2030 Commitment 2013 Progress Report, 401 are meeting the 60% carbon reduction target—a 200% increase from 2012.
Sponsored | | Oct 29, 2014
Why you should manage progress rather than people
Telling your employees to become more engaged and productive won’t work. But putting mechanisms in place that encourages their progress will. SPONSORED CONTENT
Sponsored | | Oct 29, 2014
What’s the difference between your building’s coating chalking and fading?
While the reasons for chalk and fade are different, both occurrences are something to watch for. SPONSORED CONTENT
Sponsored | | Oct 29, 2014
Historic Washington elementary school incorporates modular design
More and more architects and designers are leveraging modern modular building techniques for expansion projects planned on historical sites. SPONSORED CONTENT
| Oct 29, 2014
Diller Scofidio + Renfro selected to design Olympic Museum in Colorado Springs
The museum is slated for an early 2018 completion, and will include a hall of fame, theater, retail space, and a 20,000-sf hall that will showcase the history of the Olympics and Paralympics.
Smart Buildings | Oct 29, 2014
SCAPE’s 'living breakwaters' resiliency development wins 2014 Buckminster Fuller Challenge
New York-based landscape architecture firm SCAPE won the Buckminster Fuller Institute’s 2014 Fuller Challenge, billed as socially responsible design’s highest award.
| Oct 28, 2014
4 keys to mastering 'design thinking' and the iteration process
When using design thinking and iteration, we’ll sometimes spend multiple days iterating idea after idea, heads down, only to realize we still don’t have it right, writes HDR's Amy Lussetto. She offers tips for success with these idea-nurturing tools.