flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Adolfson & Peterson names Rick Whitney CEO

Adolfson & Peterson names Rick Whitney CEO

For the last six years, Whitney has held the position of President and CEO of M+W U.S., Inc.


By Adolfson & Peterson | September 3, 2014

Adolfson & Peterson, Inc. (A&P) has announced the appointment of Rick Whitney as Chief Executive Officer, effective October 1, 2014. In his new role, Whitney will be responsible for the company's strategic direction and the overall growth and performance of the business.

Whitney succeeds Interim CEO Steven Pinney, who has held the interim role since CEO Doug Jaeger stepped down in December 2013. Pinney will continue to serve A&P as Chairman of the Board of Directors.

Whitney brings broad experience in executive leadership roles and a strong background in construction management.  For the last six years he held the position of President and Chief Executive Officer of M+W U.S., Inc., based in Watervliet, New York. M+W U.S. is part of the M+W Group, a leading design/builder of technology-driven manufacturing and research facilities headquartered in Stuttgart, Germany. Whitney also served as Chairman of the Board of M+W U.S., Inc. Throughout Whitney’s tenure as CEO, M+W U.S. experienced rapid and sustained growth. He spearheaded several initiatives to ensure the company’s profitability and led the company through the strategic acquisition of five companies.

Whitney’s career at M+W U.S. also included five years as Chief Operating Officer. In 2003 he founded Total Facility Solutions (TFS), a wholly owned subsidiary of M+W U.S., Inc., and served as the company’s CEO.  TFS is a self-perform mechanical contractor specializing in high purity piping systems. Whitney also worked for Texas Instruments from 1983 until 1997, during which he oversaw construction in the Asia Pacific region for several years. He began his career as a civil engineer with the U.S. Army Corps of Engineers in both active duty and U.S. Army Reserve positions. Whitney holds a BS in Civil Engineering from The Citadel Military College of South Carolina and an MBA in Finance from the University of South Carolina. 

“We welcome Rick to A&P at a pivotal time in our history,” said Interim CEO Steve Pinney. “A&P is firmly established as a national company with a well-diversified portfolio of work, and we are seeing many opportunities for growth.  Rick’s strong leadership and his extensive background in engineering, construction and project management will be tremendous assets as we take A&P to the next level.”

Tags

Related Stories

| Sep 17, 2013

AIA sees uptick in architecture billings for August

AIA's Architecture Billings Index was 53.8 in August, up from 52.7 the previous month, signaling increased demand for design services nationwide. The West and Northeast regions saw the biggest ABI gains last month. 

| Sep 17, 2013

First look: BIG+MVVA proposal for Pier 6 at Brooklyn Bridge Park

BIG’s proposal for Brooklyn Bridge Park, a project that has revitalized the New York City waterfront, consists of a 6,000 ft2 (560 m2) triangular cross-laminated timber structure, serving both as pavilion and platform.  Sloping upwards 17.5 feet (5.3 m) in height from the foot of the large gathering lawn, the platform provides magnificent views of the surrounding harbor, the Statue of Liberty, the Manhattan skyline, and the Brooklyn Bridge. 

| Sep 17, 2013

World's first 'invisible' tower planned in South Korea

The 1,476-foot-tall structure will showcase Korean cloaking technology that utilizes an LED façade fitted with optical cameras that will display the landscape directly behind the building, thus making it invisible.

| Sep 17, 2013

Complex stained glass restoration under way on Wisconsin Capitol Building

Work is under way at the Wisconsin State Capitol on an extensive $2.7 million, 14-month renovation to the skylights above the House and Senate chambers, along with the barrel vault skyline above the grand staircase and the panels in the rotunda dome.

| Sep 16, 2013

Study analyzes effectiveness of reflective ceilings

Engineers at Brinjac quantify the illuminance and energy consumption levels achieved by increasing the ceiling’s light reflectance.

| Sep 16, 2013

Does brainstorming work?

The idea-generating process known as brainstorming has come under some intense fire recently. Critics contend that it suspends much-needed criticism and conflict while suppressing the creative ideas of introverts.

| Sep 16, 2013

Passive solar, enhanced envelope crucial to Univ. of Illinois net-zero project

Passive solar strategies and an enhanced envelope are keys to achieving net-zero on the new 230,000 sf Department of Electrical and Computer Engineering building at the University of Illinois at Urbana-Champaign.

| Sep 16, 2013

Forty-three percent of energy leaders will invest more in efficiency next year (infographic)

Forty-three percent of energy leaders say their investment in energy efficiency next year is projected to be more than it was last year, according to survey results released today by Schneider Electric. Twenty-two percent said their projected investment would stay the same, and 10 percent reported their investment would be less than last year.

| Sep 16, 2013

Forty-three percent of energy leaders will invest more in efficiency next year (infographic)

 Forty-three percent of energy leaders say their investment in energy efficiency next year is projected to be more than it was last year, according to survey results released today by Schneider Electric. Twenty-two percent said their projected investment would stay the same, and 10 percent reported their investment would be less than last year.

| Sep 16, 2013

Construction spending hits four-year high in July: AGC report

Total construction spending hit a four-year high in July as private residential and nonresidential activity increased while public spending declined, according to an analysis of new Census Bureau data by the Associated General Contractors of America. Association officials urged lawmakers in Washington to make infrastructure investment a top federal priority before funding runs out at the end of September.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021