Adolfson & Peterson, Inc. (A&P) has announced the appointment of Rick Whitney as Chief Executive Officer, effective October 1, 2014. In his new role, Whitney will be responsible for the company's strategic direction and the overall growth and performance of the business.
Whitney succeeds Interim CEO Steven Pinney, who has held the interim role since CEO Doug Jaeger stepped down in December 2013. Pinney will continue to serve A&P as Chairman of the Board of Directors.
Whitney brings broad experience in executive leadership roles and a strong background in construction management. For the last six years he held the position of President and Chief Executive Officer of M+W U.S., Inc., based in Watervliet, New York. M+W U.S. is part of the M+W Group, a leading design/builder of technology-driven manufacturing and research facilities headquartered in Stuttgart, Germany. Whitney also served as Chairman of the Board of M+W U.S., Inc. Throughout Whitney’s tenure as CEO, M+W U.S. experienced rapid and sustained growth. He spearheaded several initiatives to ensure the company’s profitability and led the company through the strategic acquisition of five companies.
Whitney’s career at M+W U.S. also included five years as Chief Operating Officer. In 2003 he founded Total Facility Solutions (TFS), a wholly owned subsidiary of M+W U.S., Inc., and served as the company’s CEO. TFS is a self-perform mechanical contractor specializing in high purity piping systems. Whitney also worked for Texas Instruments from 1983 until 1997, during which he oversaw construction in the Asia Pacific region for several years. He began his career as a civil engineer with the U.S. Army Corps of Engineers in both active duty and U.S. Army Reserve positions. Whitney holds a BS in Civil Engineering from The Citadel Military College of South Carolina and an MBA in Finance from the University of South Carolina.
“We welcome Rick to A&P at a pivotal time in our history,” said Interim CEO Steve Pinney. “A&P is firmly established as a national company with a well-diversified portfolio of work, and we are seeing many opportunities for growth. Rick’s strong leadership and his extensive background in engineering, construction and project management will be tremendous assets as we take A&P to the next level.”
Related Stories
| Oct 13, 2010
HQ renovations aim for modern look
Gerner Kronick + Valcarcel Architects’ renovations to the Commonwealth Bank of Australia’s New York City headquarters will feature a reworked reception lobby with back-painted glass, silk-screened logos, and a video wall.
| Oct 13, 2010
New health center to focus on education and awareness
Construction is getting pumped up at the new Anschutz Health and Wellness Center at the University of Colorado, Denver. The four-story, 94,000-sf building will focus on healthy lifestyles and disease prevention.
| Oct 13, 2010
Community center under way in NYC seeks LEED Platinum
A curving, 550-foot-long glass arcade dubbed the “Wall of Light” is the standout architectural and sustainable feature of the Battery Park City Community Center, a 60,000-sf complex located in a two-tower residential Lower Manhattan complex. Hanrahan Meyers Architects designed the glass arcade to act as a passive energy system, bringing natural light into all interior spaces.
| Oct 13, 2010
Community college plans new campus building
Construction is moving along on Hudson County Community College’s North Hudson Campus Center in Union City, N.J. The seven-story, 92,000-sf building will be the first higher education facility in the city.
| Oct 13, 2010
Bookworms in Silver Spring getting new library
The residents of Silver Spring, Md., will soon have a new 112,000-sf library. The project is aiming for LEED Silver certification.
| Oct 13, 2010
County building aims for the sun, shade
The 187,032-sf East County Hall of Justice in Dublin, Calif., will be oriented to take advantage of daylighting, with exterior sunshades preventing unwanted heat gain and glare. The building is targeting LEED Silver. Strong horizontal massing helps both buildings better match their low-rise and residential neighbors.
| Oct 12, 2010
Holton Career and Resource Center, Durham, N.C.
27th Annual Reconstruction Awards—Special Recognition. Early in the current decade, violence within the community of Northeast Central Durham, N.C., escalated to the point where school safety officers at Holton Junior High School feared for their own safety. The school eventually closed and the property sat vacant for five years.
| Oct 12, 2010
Guardian Building, Detroit, Mich.
27th Annual Reconstruction Awards—Special Recognition. The relocation and consolidation of hundreds of employees from seven departments of Wayne County, Mich., into the historic Guardian Building in downtown Detroit is a refreshing tale of smart government planning and clever financial management that will benefit taxpayers in the economically distressed region for years to come.
| Oct 12, 2010
Richmond CenterStage, Richmond, Va.
27th Annual Reconstruction Awards—Bronze Award. The Richmond CenterStage opened in 1928 in the Virginia capital as a grand movie palace named Loew’s Theatre. It was reinvented in 1983 as a performing arts center known as Carpenter Theatre and hobbled along until 2004, when the crumbling venue was mercifully shuttered.
| Oct 12, 2010
University of Toledo, Memorial Field House
27th Annual Reconstruction Awards—Silver Award. Memorial Field House, once the lovely Collegiate Gothic (ca. 1933) centerpiece (along with neighboring University Hall) of the University of Toledo campus, took its share of abuse after a new athletic arena made it redundant, in 1976. The ultimate insult occurred when the ROTC used it as a paintball venue.