Government work is scattered among dozens of federal civilian agencies, the Pentagon and the military branches, the 50 states, and tens of thousands of municipalities. The only thing these disparate entities have in common is a tight hold on their pocketbooks. With the federal stimulus having faded into the ether, and with state and municipal collections of sales and property taxes down, government construction at all levels will be slow to recover.“We’ll be lucky to see 2007 numbers by 2017,” says Margaret Bowker, Vice President, JE Dunn Construction.
Inside the Beltway, the GSA, the National Institutes of Health, the Naval Facilities Engineering Command, and the U.S. Army Corps of Engineers are still posting RFPs, but there’s a sense that “spending has been put on hold to wait and see the outcome of the election,” says Barry Perkins, LEED AP BD+C, Vice President – Government Construction, James G. Davis Construction Corp.“Certainly the size and type of projects has changed, with more smaller renovations and retrofits than larger new construction,” he says.
SCROLL DOWN FOR GIANTS 300 GOVERNMENT FIRM RANKINGS
“We’re showing up to prebids and competing against firms that never used to pursue city or county work,” says Dennis Thompson, Executive Vice President for Business Development, Manhattan Construction Co. “Competition has increased five- or six-fold, so you see an erosion of fees.”
The result: “You have the same firms chasing a smaller pool of projects,” says Len Vetrone, Webcor Builders’ Senior Vice President for Public and Federal Work.
MAKING THE ADJUSTMENT TO GOVERNMENT WORK
For newbies to federal work, learning how to work with the bureaucracy can be an eye-opener. When the economy went into the tank in 2008, Pepper Construction Group took on its first two GSA projects—the renovation of the Mies van der Rohe-designed John C. Kluczynski Federal Building, in Chicago, and the John Weld Peck Federal Building, in Cincinnati.
“There’s just an enormous amount of paperwork, forms, and protocols that are required on government jobs compared to our private work,” says Senior Vice President Rich Tilghman, PE. “We have high-quality teams with lots of experience renovating large buildings in the private sector, and GSA recognized that,” he says, adding that the $100 million in revenue for the two projects was certainly welcome.
Even firms with decades of federal civilian and military experience have to keep constantly attuned to client needs. Reynolds Smith & Hills has been designing and maintaining facilities for NASA for 50 years. Recently, the firm replaced almost 10,000 square feet of windows in the Launch Control Center at the Kennedy Space Center, a highly sensitive project. “NASA is a wonderful client, always looking for innovative solutions, but you have to create a low-risk environment for them,” says RS&H Vice President Richard Hammett, AIA, LEED AP.
Public-private partnerships are “starting to catch on” at the state and local level, says Webcor Builders’ Vetrone. “We’re talking to some of the cities we work for in California which have major public projects with no funding, looking at how P3 could make those a reality,” he says. A recently awarded P3 for a courthouse in Long Beach has attracted a lot of interest from the local AEC community, he says.
Manhattan Construction’s Thompson says privatization seems to be gaining traction with some federal clients. His firm is serving as contracting partner in such a developer leaseback scheme for a VA clinic in Grand Rapids, Mich., with U.S. Federal Properties.
SOME BRIGHT SPOTS ON THE HORIZON
Even with budget cuts, there will still be public-sector jobs for AEC firms. For example, Webcor Builders’ Vetrone reports “a fair amount” of aviation projects in California. “The big work at LAX and Sacramento has been awarded, but SFO still has a fairly aggressive program,” he says.
Manhattan Construction’s Thompson says some state and local government agencies may be rethinking their procurement policies because “service and delivery quality have been affected” by their reliance on super-low bidders. “The trend is back to technical qualifications plus low price, but at least it’s not just low price,” he says.
Vetrone says Webcor Builders is being “pretty selective” as to which government projects it bids on. “We’re looking for clients who want to hire on a best-value basis, whether design-build or CM at risk, where your qualifications, technical competence, and people count as much as your price,” he says.
More commissioning of government and military buildings could also be a godsend for AEC firms. “We’ve done enhanced commissioning for the Air Force, and we’re finding that the buildings have a marked increase in performance,” says RS&H’s Hammett. “If anything was a no-brainer, commissioning would be it.”
Portfolio optimization is becoming much more important to governments at all levels, as they seek to reduce overhead while improving employee productivity. “They’re looking for a trifecta—asset preservation, sustainability, and innovative workplace solutions,” says Becky Greco, Principal, HGA Architects and Engineers. Public-sector clients want to emulate the corporate model of “better, faster, more cost-efficient,” she says.
Lisa Bottom, a Principal at Gensler, agrees. “Government workplaces are moving away from a hierarchical structure and embracing an open plan” based on actual space usage and employee mobility patterns, she says. The goal: flexible offices that will meet current and future needs of the workforce at all levels of government. +
TOP 25 GOVERNMENT SECTOR ARCHITECTURE FIRMS
Rank | Company | 2011 Government Revenue ($) |
1 | HOK | 143,334,571 |
2 | Heery International | 103,832,000 |
3 | SmithGroupJJR | 77,652,837 |
4 | IBI Group | 57,347,163 |
5 | Perkins+Will | 48,059,661 |
6 | HDR Architecture | 46,000,000 |
7 | EYP Architecture & Engineering | 40,892,580 |
8 | Skidmore, Owings & Merrill | 33,907,000 |
9 | HNTB Architecture | 31,338,712 |
10 | PageSoutherlandPage | 27,263,377 |
11 | NBBJ | 24,958,000 |
12 | LEO A DALY | 24,141,694 |
13 | Hammel, Green and Abrahamson | 24,028,000 |
14 | PGAL | 24,018,100 |
15 | Reynolds, Smith and Hills | 18,900,000 |
16 | ZGF Architects | 17,653,791 |
17 | RTKL Associates | 17,075,180 |
18 | DLR Group | 17,000,000 |
19 | Gensler | 17,000,000 |
20 | Moseley Architects | 13,700,000 |
21 | Beyer Blinder Belle Architects & Planners | 12,450,000 |
22 | Sasaki Associates | 12,356,441 |
23 | Cannon Design | 12,000,000 |
24 | KMD Architects | 11,913,372 |
25 | Fentress Architects | 11,830,262 |
TOP 25 GOVERNMENT SECTOR ENGINEERING FIRMS
Rank | Company | 2011 Government Revenue ($) |
1 | AECOM Technology Corp. | 2,485,000,000 |
2 | Fluor Corp. | 1,127,862,000 |
3 | Jacobs | 924,100,000 |
4 | URS Corp. | 309,987,000 |
5 | STV | 133,396,000 |
6 | Stantec | 117,000,000 |
7 | Dewberry | 57,006,253 |
8 | Atkins North America | 43,330,846 |
9 | Parsons Brinckerhoff | 35,515,523 |
10 | H&A Architects & Engineers | 31,641,856 |
11 | Michael Baker Jr., Inc. | 30,830,000 |
12 | Science Applications International Corp. | 15,431,116 |
13 | Walter P Moore | 12,531,123 |
14 | Coffman Engineers | 12,400,000 |
15 | SSOE Group | 12,321,198 |
16 | WSP USA | 10,900,000 |
17 | Arup | 10,580,870 |
18 | TLC Engineering for Architecture | 8,528,328 |
19 | Sebesta Blomberg | 8,450,225 |
20 | Interface Engineering | 8,103,067 |
21 | Walker Parking Consultants | 7,887,763 |
22 | Simpson Gumpertz & Heger | 7,800,000 |
23 | KPFF Consulting Engineers | 7,000,000 |
24 | RMF Engineering | 7,000,000 |
25 | Wiss, Janney, Elstner Associates | 6,936,000 |
TOP 25 GOVERNMENT SECTOR CONSTRUCTION FIRMS
Rank | Company | 2011 Government Revenue ($) |
1 | Turner Corporation, The | 2,268,320,925 |
2 | Jacobs | 924,100,000 |
3 | Clark Group | 850,491,577 |
4 | Whiting-Turner Contracting Co., The | 749,080,537 |
5 | Gilbane Building Co. | 736,199,000 |
6 | Hensel Phelps Construction | 669,080,000 |
7 | Walsh Group, The | 552,751,904 |
8 | Skanska USA | 550,758,448 |
9 | Webcor Builders | 484,567,966 |
10 | Tutor Perini | 385,311,000 |
11 | Balfour Beatty US | 341,774,742 |
12 | URS Corp. | 309,987,000 |
13 | Manhattan Construction Group | 274,683,334 |
14 | Alberici Corp. | 247,423,509 |
15 | PCL Construction Enterprises | 245,007,223 |
16 | Mortenson | 233,863,000 |
17 | Flintco | 223,200,000 |
18 | McCarthy Holdings | 218,000,000 |
19 | James G. Davis Construction | 208,000,000 |
20 | Yates Companies, The | 187,800,000 |
21 | Ryan Companies US | 156,858,437 |
22 | DPR Construction | 146,889,203 |
23 | JE Dunn Construction | 135,637,557 |
24 | Sundt Construction | 100,393,850 |
25 | CORE Construction | 94,340,532 |
Related Stories
| May 18, 2011
Eco-friendly San Antonio school combines history and sustainability
The 113,000-sf Rolling Meadows Elementary School in San Antonio is the Judson Independent School District’s first sustainable facility, with green features such as vented roofs for rainwater collection and regionally sourced materials.
| May 18, 2011
New Reform Jewish Independent school opens outside Boston
The Rashi School, one of only 17 Reform Jewish independent schools in North American and Israel, opened a new $30 million facility on a 166-acre campus shared with the Hebrew SeniorLife community on the Charles River in Dedham, Mass.
| May 18, 2011
Design diversity celebrated at Orange County club
The Orange County, Calif., firm NKDDI designed the 22,000-sf Luna Lounge & Nightclub in Pomona, Calif., to be a high-end multipurpose event space that can transition from restaurant to lounge to nightclub to music venue.
| May 18, 2011
Lab personnel find comfort in former Winchester gun factory
The former Winchester Repeating Arms Factory in New Haven, Conn., is the new home of PepsiCo’s Biology Innovation Research Laboratory.
| May 18, 2011
Addition provides new school for pre-K and special-needs kids outside Chicago
Perkins+Will, Chicago, designed the Early Learning Center, a $9 million, 37,000-sf addition to Barrington Middle School in Barrington, Ill., to create an easily accessible and safe learning environment for pre-kindergarten and special-needs students.
| May 18, 2011
Raphael Viñoly’s serpentine-shaped building snakes up San Francisco hillside
The hillside location for the Ray and Dagmar Dolby Regeneration Medicine building at the University of California, San Francisco, presented a challenge to the Building Team of Raphael Viñoly, SmithGroup, DPR Construction, and Forell/Elsesser Engineers. The 660-foot-long serpentine-shaped building sits on a structural framework 40 to 70 feet off the ground to accommodate the hillside’s steep 60-degree slope.
| May 18, 2011
New center provides home to medical specialties
Construction has begun on the 150,000-sf Medical Arts Pavilion at the University Medical Center in Princeton, N.J.
| May 18, 2011
Improvements add to Detroit convention center’s appeal
Interior and exterior renovations and updates will make the Detroit Cobo Center more appealing to conventioneers. A new 40,000-sf ballroom will take advantage of the center’s riverfront location, with views of the river and downtown.
| May 18, 2011
One of Delaware’s largest high schools seeks LEED for Schools designation
The $82 million, 280,000-sf Dover (Del.) High School will have capacity for 1,800 students and feature a 900-seat theater, a 2,500-seat gymnasium, and a 5,000-seat football stadium.