An integrated design and engineering effort led by AECOM, with a team including William McDonough + Partners, has guided NASA to the USGBC’s Platinum LEED rating for the new N232 office building at the NASA Ames Research Center in California.
The facility, known as Sustainability Base, officially opened April 20.
When NASA planned to add the first new building in 20 years to the Ames Research Center, home to much of the agency’s most innovative technology, the goal was that the facility be an exemplar in sustainability. The result is a working environment that prioritizes user health and comfort with natural daylight, fresh air and temperature control while making minimal environmental impacts. Sustainability Base will save more than 60% of the energy and more than 80% of the water typically used by a facility of its type.
An onsite fuel cell, roof-mounted photovoltaic solar panels, a geothermal heat pump, passive and low-energy HVAC systems, and intelligent building controls that interact with users are among the building’s advanced engineering features.
AECOM served as architect, engineer and landscape architect of record for the project, bringing on William McDonough + Partners for development of the design vision and sustainability goals for the project.
The Building Team also included Loisos + Ubbelohde (lighting consultant), Siteworks Studio (landscape design), MBDC (materials assessment) and Todd Ecological (wastewater treatment). BD+C
Related Stories
Healthcare Facilities | Aug 28, 2015
Shhh!!! 6 ways to keep the noise down in new and existing hospitals
There’s a ‘decibel war’ going on in the nation’s hospitals. Progressive Building Teams are leading the charge to give patients quieter healing environments.
| Dec 28, 2014
New trends in ceiling designs and materials [AIA course]
A broad array of new and improved ceiling products offers designers everything from superior acoustics and closed-loop, recycled content to eased integration with lighting systems, HVAC diffusers, fire sprinkler heads, and other overhead problems. This course describes how Building Teams are exploring ways to go beyond the treatment of ceilings as white, monolithic planes.
| Mar 18, 2014
Charles Dalluge joins DLR Group as president, COO
CEO Griff Davenport announces addition of Dalluge to executive leadership team
| Nov 19, 2013
Top 10 green building products for 2014
Assa Abloy's power-over-ethernet access-control locks and Schüco's retrofit façade system are among the products to make BuildingGreen Inc.'s annual Top-10 Green Building Products list.
| Nov 18, 2013
ASSA ABLOY, CertainTeed team up to tackle classroom acoustics
The new alliance has uncovered easily accessible solutions to address these acoustical challenges and reduce the sound reverberation that further complicates noise issues.
| Apr 16, 2013
5 projects that profited from insulated metal panels
From an orchid-shaped visitor center to California’s largest public works project, each of these projects benefited from IMP technology.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.