AECOM is suing Zurich American Insurance alleging that the carrier’s “all-risk” policies should include claims for losses due to the impact of COVID-19.
The design firm alleges that Zurich refused to pay coronavirus-related claims when such coverage was not specifically excluded in AECOM's “all-risk” property insurance policies. AECOM claims its COVID-19 damages run in the millions of dollars.
According to AECOM’s suit, the insurance industry has a standard virus and bacteria exclusion form, but Zurich did not include it in AECOM policies. Some of the losses AECOM claims Zurich will not cover are for installation of physical barriers to isolate aerosolized droplets produced by those who are infected by the disease.
AECOM also said in the court filing that Zurich knew or should have known that many courts have determined that the presence of a hazardous substance in a property, including within its airspace, is considered property damage. Further, there may be direct physical loss to the property even without any physical damage. The lawsuit also noted that AECOM has offices, operations, and projects around the world where more than 500 AECOM employees have tested positive for COVID-19.
Related Stories
| Jun 21, 2012
Brazilian engineering/construction firm Odebrecht sues Florida over ban on companies doing business in Cuba
Odebrecht Construction Inc., a Brazilian engineering and construction company, is suing the State of Florida over a new law that bans governments from hiring companies with business ties to Cuba.
| Jun 21, 2012
String of shattered glass balcony panels prompts call for code reform in Ontario
Since last summer, glass balconies have shattered at 13 different buildings in Toronto.
| Jun 21, 2012
California adds window film to building code
California is the first state to add window film into its building code. Window film, a polymer material, offers cost-effective energy savings.
| Jun 21, 2012
New ISO standard to improve environmental management of concrete
A new ISO standard will help the construction industry better manage the environmental impacts of concrete.
| Jun 21, 2012
On net-zero projects, Building Teams will be held accountable for energy-efficiency performance
The building team will be held accountable for how net-zero energy buildings perform two, five, and maybe ten years after completion.
| Jun 14, 2012
USGBC co-founder launches rating system for building product manufacturers
U.S. Green Building Council co-founder David Gottfried’s new venture, Regenerative Ventures, has established a rating system for building product manufacturers.
| Jun 14, 2012
Green standard set for single-ply roofing membrane
A sustainability standard has been established for single-ply roofing membranes used on commercial buildings.
| Jun 14, 2012
Minnesota Vikings stadium plan gets legislative go-ahead
Legislation that approved the construction of a new billion dollar stadium for the Minnesota Vikings passed the Minnesota legislature.
| Jun 14, 2012
Report alleges New York’s prevailing construction wages are miscalculated, costing billions
A miscalculation in how prevailing wages are calculated in New York reportedly costs the state $3 billion a year in public-infrastructure projects.