flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

After 60 years of student lobbying, new activity center opens at University of Texas

After 60 years of student lobbying, new activity center opens at University of Texas


March 23, 2011

AUSTIN, TEXAS, March 22, 2011 – The new Student Activity Center (SAC) at the University of Texas campus in Austin is of the students, by the students, and for the students. The SAC is the result of almost 60 years of student lobbying for another dedicated social and cultural center on campus. Located in the heart of the campus, this 149,000 square foot facility is designed to serve as the “campus living room” – it is a place for students “to see and be seen”. The facility should earn a LEED Gold certification, a first for the campus.

Extensive student input and design workshops generated the main project goals, which were easy accessibility, more activity spaces and overall sustainability. Overland Partners Architects of San Antonio, TX and associate architect WTW Architects of Pittsburgh, PA responded with a contemporary building on the East Mall of campus, the primary pedestrian point of entry to the campus. The new SAC is geographically and functionally complementary to the existing student union on the West Mall, and important in serving the growing student body.  

To meet the student goal of dedicated activity spaces, the SAC includes a 5,000 square foot ballroom, a 500-seat auditorium, a black box theatre, 12 student conference/meeting rooms, student organization offices, and a student government chamber. The ballroom is already booked for months with events like comedian Zach Braff, a 3-D Gaming tournament, and a concert by Chuck D. and Common. There are also ample group study lounges and informal individual study areas scattered throughout the facility. An indoor food court featuring regional fast food favorites and a coffee bar sits adjacent to more than 46,000 square feet of landscaped outdoor gathering space, substantially increasing the seating and providing an enjoyable dining experience in the moderate Austin climate.

The new SAC has struck a powerful chord at the university in response to project goals.

“I have to say that a mark of any successful building is how it makes one wonder how we managed without it,” Juan González, Vice-President for Student Affairs, said. “It is truly a major enhancement to not only the area, but the whole campus environment. It is especially rewarding to see so many students embrace the facility from the moment we opened the doors.”

The SAC is a modern take on the traditional campus architecture. The simple forms and clean lines of the SAC distinguish it, yet the limestone walls and red tile roofs unify it with the existing campus buildings. Tucked behind a mature oak grove, abundant windows throughout the building bring in ample daylighting and take advantage of the surrounding landscape. There is an accessible rooftop courtyard with an adjacent green roof, and a cistern that collects and recycles rainwater for landscape irrigation.

Renowned international artist James Turrell is designing a skyspace installation for the SAC opening in fall 2012. The enclosed rooftop space will have an opening in the roof surrounded by LED lights that will affect the viewer’s perception of the sky.

The project has only been open since January, yet students are already using every available inch of space. Early student reviews of the SAC are glowing.

 “I went to peak at the new structure, and OH MAN. It’s awesome. Though we have the Union, academic center, and library, UT always lacked a central place where students could take a break between places, grab a bite to eat, nap, cram for a test, or hold student org meetings. The SAC provides all of the above and with style,” according to one UT student blog.

About Overland Partners

Overland Partners Architects, founded in 1987 in San Antonio, Texas, is the realization of a vision to bring together a wide range of talents in architecture and planning in order to provide comprehensive design services. Sensitive to the environmental and aesthetic contexts of its projects, the firm strives for a thoughtful integration of technology, art, and craft through highly sustainable solutions. Overland Partners offers its clients the ultimate goal of creating beautiful, functional and enduring designs through a collaborative process that inspires long-term relationships. In addition to the Student Activity Center at the University of Texas the firm is currently working on the university’s new College of Liberal Arts. The firm completed the Lady Bird Johnson Wildflower Center at the University of Texas in Austin, winner of more than 10 regional and national design awards. Other higher education projects within the firm’s design portfolio include the new Business School Building at Baylor University in Waco, Texas; the new Academic Building at the University of North Texas at Dallas; the new Continuing Education Center at Rice University in Houston; and the School of Architecture and Landscape Architecture at Pennsylvania State University in University Park, Pennsylvania. 

Related Stories

| Dec 17, 2010

Luxury condos built for privacy

A new luxury condominium tower in Los Angeles, The Carlyle has 24 floors with 78 units. Each of the four units on each floor has a private elevator foyer. The top three floors house six 5,000-sf penthouses that offer residents both indoor and outdoor living space. KMD Architects designed the 310,000-sf structure, and Elad Properties was project developer.

| Dec 17, 2010

Subway entrance designed to exude Hollywood charm

The Hollywood/Vine Metro portal and public plaza in Los Angeles provides an entrance to the Red Line subway and the W Hollywood Hotel. Local architect Rios Clementi Hale Studio designed the portal and plaza to flow with the landmark theaters and plazas that surround it.

| Dec 17, 2010

New engineering building goes for net-zero energy

A new $90 million, 250,000-sf classroom and laboratory facility with a 450-seat auditorium for the College of Electrical and Computer Engineering at the University of Illinois at Urbana/Champaign is aiming for LEED Platinum.

| Dec 17, 2010

Vietnam business center will combine office and residential space

The 300,000-sm VietinBank Business Center in Hanoi, Vietnam, designed by Foster + Partners, will have two commercial towers: the first, a 68-story, 362-meter office tower for the international headquarters of VietinBank; the second, a five-star hotel, spa, and serviced apartments. A seven-story podium with conference facilities, retail space, restaurants, and rooftop garden will connect the two towers. Eco-friendly features include using recycled heat from the center’s power plant to provide hot water, and installing water features and plants to improve indoor air quality. Turner Construction Co. is the general contractor.

| Dec 17, 2010

Toronto church converted for condos and shopping

Reserve Properties is transforming a 20th-century church into Bellefair Kew Beach Residences, a residential/retail complex in The Beach neighborhood of Toronto. Local architecture firm RAWdesign adapted the late Gothic-style church into a five-story condominium with 23 one- and two-bedroom units, including two-story penthouse suites. Six three-story townhouses also will be incorporated. The project will afford residents views of nearby Kew Gardens and Lake Ontario. One façade of the church was updated for retail shops.

| Dec 17, 2010

ARRA-funded Navy hospital aims for LEED Gold

The team of Clark/McCarthy, HKS Architects, and Wingler & Sharp are collaborating on the design of a new naval hospital at Camp Pendleton in Southern California. The $451 million project is the largest so far awarded by the U.S. Navy under the American Recovery and Reinvestment Act. The 500,000-sf, 67-bed hospital, to be located on a 70-acre site, will include facilities for emergency and primary care, specialty care clinics, surgery, and intensive care. The Building Team is targeting LEED Gold.

| Dec 17, 2010

Arizona outpatient cancer center to light a ‘lantern of hope’

Construction of the Banner MD Anderson Cancer Center in Gilbert, Ariz., is under way. Located on the Banner Gateway Medical Center campus near Phoenix, the three-story, 131,000-sf outpatient facility will house radiation oncology, outpatient imaging, multi-specialty clinics, infusion therapy, and various support services. Cannon Design incorporated a signature architectural feature called the “lantern of hope” for the $90 million facility.

| Dec 17, 2010

Cladding Do’s and Don’ts

A veteran structural engineer offers expert advice on how to avoid problems with stone cladding and glass/aluminum cladding systems.

| Dec 17, 2010

5 Tips on Building with SIPs

Structural insulated panels are gaining the attention of Building Teams interested in achieving high-performance building envelopes in commercial, industrial, and institutional projects.

| Dec 17, 2010

How to Win More University Projects

University architects representing four prominent institutions of higher learning tell how your firm can get the inside track on major projects.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021