Five AIA Contract Documents are going green. Developed using AIA’s flagship documents as a base, and incorporating concepts and model language from the AIA’s Guide for Sustainable Projects, the new documents address the unique roles, risks and opportunities encountered on sustainable design and construction projects.
“The development of these new documents for sustainable projects is a natural next step following the release of the Guide for Sustainable Projects in the spring,” said Ken Cobleigh, Managing Director and Counsel for AIA Contract Documents Content. “We continue to see a demand for incorporating sustainable elements in projects. The AIA Contract Documents program continues to revise existing documents and develop new documents and guides, as necessary, to remain current with trends and changes in the industry and law.”
The new AIA Contract Documents created for use on sustainable projects include:
- A101-2007 SP, Standard Form of Agreement between Owner and Contractor, for use on a Sustainable Project where the basis of payment is a Stipulated Sum
- B101-2007 SP, Standard Form of Agreement Between Owner and Architect, for use on a Sustainable Project
- A201-2007 SP, General Conditions of the Contract for Construction, for use on a Sustainable Project
- C401-2007 SP, Standard Form of Agreement Between Architect and Consultant, for use on a Sustainable Project
- A401-2007 SP, Standard Form of Agreement Between Contractor and Subcontractor, for use on a Sustainable Project
AIA Document D503-2011, Guide for Sustainable Projects, including Agreement Amendments and Supplementary Conditions, was released by the AIA in May 2011. In the short time since it was released, over 4,000 users have downloaded the Guide. In addition to providing model language that may be used to amend or supplement AIA Contract Documents for design-bid-build projects, the Guide discusses the applicability of key concepts to other delivery models such as design-build, construction management and integrated project delivery.
Because the AIA believes the Guide is an important resource for the design and construction industry, it is available as a free download at www.aia.org/sustainableprojectsguide.
These new documents will be available in the first quarter of 2012 as part of the new AIA Contract Documents service and AIA Documents on Demand. To purchase these and other AIA Contract Documents, please go to http://www.aia.org/contractdocs/index.htm. BD+C
Related Stories
Museums | Aug 11, 2010
Design guidelines for museums, archives, and art storage facilities
This column diagnoses the three most common moisture challenges with museums, archives, and art storage facilities and provides design guidance on how to avoid them.
| Aug 11, 2010
Broadway-style theater headed to Kentucky
One of Kentucky's largest performing arts venues should open in 2011—that's when construction is expected to wrap up on Eastern Kentucky University's Business & Technology Center for Performing Arts. The 93,000-sf Broadway-caliber theater will seat 2,000 audience members and have a 60×24-foot stage proscenium and a fly loft.
| Aug 11, 2010
Citizenship building in Texas targets LEED Silver
The Department of Homeland Security's new U.S. Citizenship and Immigration Services facility in Irving, Texas, was designed by 4240 Architecture and developed by JDL Castle Corporation. The focal point of the two-story, 56,000-sf building is the double-height, glass-walled Ceremony Room where new citizens take the oath.
| Aug 11, 2010
Carpenters' union helping build its own headquarters
The New England Regional Council of Carpenters headquarters in Dorchester, Mass., is taking shape within a 1940s industrial building. The Building Team of ADD Inc., RDK Engineers, Suffolk Construction, and the carpenters' Joint Apprenticeship Training Committee, is giving the old facility a modern makeover by converting the existing two-story structure into a three-story, 75,000-sf, LEED-certif...
| Aug 11, 2010
Utah research facility reflects Native American architecture
A $130 million research facility is being built at University of Utah's Salt Lake City campus. The James L. Sorenson Molecular Biotechnology Building—a USTAR Innovation Center—is being designed by the Atlanta office of Lord Aeck & Sargent, in association with Salt-Lake City-based Architectural Nexus.
| Aug 11, 2010
San Bernardino health center doubles in size
Temecula, Calif.-based EDGE was awarded the contract for California State University San Bernardino's health center renovation and expansion. The two-phase, $4 million project was designed by RSK Associates, San Francisco, and includes an 11,000-sf, tilt-up concrete expansion—which doubles the size of the facility—and site and infrastructure work.
| Aug 11, 2010
Goettsch Partners wins design competition for Soochow Securities HQ in China
Chicago-based Goettsch Partners has been selected to design the Soochow Securities Headquarters, the new office and stock exchange building for Soochow Securities Co. Ltd. The 21-story, 441,300-sf project includes 344,400 sf of office space, an 86,100-sf stock exchange, classrooms, and underground parking.
| Aug 11, 2010
New hospital expands Idaho healthcare options
Ascension Group Architects, Arlington, Texas, is designing a $150 million replacement hospital for Portneuf Medical Center in Pocatello, Idaho. An existing facility will be renovated as part of the project. The new six-story, 320-000-sf complex will house 187 beds, along with an intensive care unit, a cardiovascular care unit, pediatrics, psychiatry, surgical suites, rehabilitation clinic, and ...
| Aug 11, 2010
Colonnade fixes setback problem in Brooklyn condo project
The New York firm Scarano Architects was brought in by the developers of Olive Park condominiums in the Williamsburg section of Brooklyn to bring the facility up to code after frame out was completed. The architects designed colonnades along the building's perimeter to create the 15-foot setback required by the New York City Planning Commission.