flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AIA releases nine new contract documents

Architects

AIA releases nine new contract documents

Include six new forms for design-build projects.


By Peter Fabris, Contributing Editor | November 10, 2015
AIA releases nine new contract documents

Photo: Mark Kaletka/Creative Commons

The American Institute of Architects has released nine new contract documents.

They include a new owner/consultant agreement with two accompanying scope of service exhibits for land surveying and geotechnical engineering. Six new administrative forms for use on design-build projects are also available.

“Our customers expressed a need for a standard form of agreement owners could use to engage necessary consultants and leverage their expertise,” says Kenneth Cobleigh, Managing Director & Counsel, AIA Contract Documents. “The new C103 document addresses that need. These additions also cap off our design-build family of documents, which are preferred by the industry at large for commercial design-build projects.”

The C103–2015, Standard Form of Agreement Between Owner and Consultant without a Predefined Scope of Consultant’s Services, establishes expectations between an owner and consultant on a project. The agreement contains basic business terms related to copyrights and licenses, claims and disputes, termination or suspension, and compensation.

The new documents are currently available through the latest version of the AIA Contract Documents desktop software, as well as individually through AIA Documents-on-Demand and AIA Documents-on-Demand Plus.

Tags

Related Stories

| Jul 10, 2014

Unique design of Toronto's townhome The Tree House

Plans for a new Toronto townhome brings cutting-edge design.

| Jul 10, 2014

Berkeley Lab opens 'world's most comprehensive building efficiency simulator'

  DOE’s new FLEXLAB is a first-of-its-kind simulator that lets users test energy-efficient building systems individually or as an integrated system, under real-world conditions.

| Jul 10, 2014

Steinberg SF Studio launches in San Francisco, plans to transform its own office space

Grant and Saheba left their previous architectural firms, AECOM and Handel respectively, because they saw the opportunity to bring their agile, provocative design aesthetic to clients in San Francisco, Silicon Valley, and Oakland.

| Jul 9, 2014

Dragon-inspired hotel conveys Vietnamese hospitality [2014 Building Team Awards]

An international Building Team unites to create Vietnam’s first JW Marriott luxury property.

| Jul 9, 2014

Harvard Business School to build large-scale conference center

Expected to open in 2018, the facility will combine the elements of a large-scale conference center, a performance space, and an intimate community forum. The new building will be designed by Boston-based William Rawn and Associates.

| Jul 9, 2014

Top U.S. cities for design professionals

Though New York and Los Angeles are often seen as the sole hubs for design jobs, other design epicenters are scattered between the coasts.

| Jul 9, 2014

The one misstep that could be slowing your company’s growth

Change. It’s inevitable. And success for any professional may very well depend on how well we adapt to it. SPONSORED CONTENT

| Jul 9, 2014

First Look: SOM's design for All Aboard Florida Fort Lauderdale rail station

The lightweight and luminous design "responds to its setting and creates a striking infrastructural icon for the city," said SOM Design Partner Roger Duffy. 

| Jul 8, 2014

Fast-track naval hospital sparks sea change in project delivery [2014 Building Team Awards]

Through advanced coordination methods and an experimental contract method, the Building Team for Camp Pendleton’s new hospital campus sets a new standard for project delivery.

| Jul 8, 2014

Does Zaha Hadid’s Tokyo Olympic Stadium have a design flaw?

After being criticized for the cost and size of her stadium design for the 2020 Olympics in Tokyo, a Japanese architect points out a major design flaw in the stadium that may endanger the spectators.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021