flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AIA releases nine new contract documents

Architects

AIA releases nine new contract documents

Include six new forms for design-build projects.


By Peter Fabris, Contributing Editor | November 10, 2015
AIA releases nine new contract documents

Photo: Mark Kaletka/Creative Commons

The American Institute of Architects has released nine new contract documents.

They include a new owner/consultant agreement with two accompanying scope of service exhibits for land surveying and geotechnical engineering. Six new administrative forms for use on design-build projects are also available.

“Our customers expressed a need for a standard form of agreement owners could use to engage necessary consultants and leverage their expertise,” says Kenneth Cobleigh, Managing Director & Counsel, AIA Contract Documents. “The new C103 document addresses that need. These additions also cap off our design-build family of documents, which are preferred by the industry at large for commercial design-build projects.”

The C103–2015, Standard Form of Agreement Between Owner and Consultant without a Predefined Scope of Consultant’s Services, establishes expectations between an owner and consultant on a project. The agreement contains basic business terms related to copyrights and licenses, claims and disputes, termination or suspension, and compensation.

The new documents are currently available through the latest version of the AIA Contract Documents desktop software, as well as individually through AIA Documents-on-Demand and AIA Documents-on-Demand Plus.

Tags

Related Stories

| Mar 21, 2012

ABI remains positive for fourth straight month

Highest spike in inquiries for new projects since 2007.

| Mar 21, 2012

Iowa’s Mercy Medical Center’s new Emergency Department constructed using Lean design

New Emergency Department features a "racetrack" design with a central nurses' station encircled by 19 private patient examination rooms and 2 trauma treatment rooms. 

| Mar 21, 2012

Clary, Hendrickson named regional directors for HDR Architecture

New directors will be responsible for expanding and strengthening the firm throughout the central region. 

| Mar 20, 2012

FMI releases 2012 first quarter construction outlook

The last time construction put in place was at this level was 2000-2001.

| Mar 20, 2012

Ceco Building Systems names Romans marketing director

Romans joins Ceco Building Systems with over 15 years in marketing and customer service.

| Mar 20, 2012

UT Arlington launches David Dillon Center for Texas Architecture

Symposium about Texas architecture planned for April.

| Mar 20, 2012

Stanford’s Knight Management Center Awarded LEED Platinum

The 360,000-sf facility underscores what is taught in many of the school’s electives such as Environmental Entrepreneurship and Environmental Science for Managers and Policy Makers, as well as in core classes covering sustainability across the functions of business.

| Mar 20, 2012

New office designs at San Diego’s Sunroad Corporate Center

Traditional office space being transformed into a modern work environment, complete with private offices, high-tech conference rooms, a break room, and an art gallery, as well as standard facilities and amenities.

| Mar 19, 2012

Obama’s positioned to out-regulate Bush in second term

Proposed ozone rule would cost $19 billion to $90 billion in 2020, according to the White House.

| Mar 19, 2012

Skanska promotes Saunders to VP/GM of Bayshore Concrete Products

During his more than 13 years with Bayshore, Saunders has provided products for Victory Bridge in New Jersey, Route 52 Causeway in Ocean City, N.J., and for numerous piers at Naval Station Norfolk and the Norfolk Naval Shipyard. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021