flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AIA releases nine new contract documents

Architects

AIA releases nine new contract documents

Include six new forms for design-build projects.


By Peter Fabris, Contributing Editor | November 10, 2015
AIA releases nine new contract documents

Photo: Mark Kaletka/Creative Commons

The American Institute of Architects has released nine new contract documents.

They include a new owner/consultant agreement with two accompanying scope of service exhibits for land surveying and geotechnical engineering. Six new administrative forms for use on design-build projects are also available.

“Our customers expressed a need for a standard form of agreement owners could use to engage necessary consultants and leverage their expertise,” says Kenneth Cobleigh, Managing Director & Counsel, AIA Contract Documents. “The new C103 document addresses that need. These additions also cap off our design-build family of documents, which are preferred by the industry at large for commercial design-build projects.”

The C103–2015, Standard Form of Agreement Between Owner and Consultant without a Predefined Scope of Consultant’s Services, establishes expectations between an owner and consultant on a project. The agreement contains basic business terms related to copyrights and licenses, claims and disputes, termination or suspension, and compensation.

The new documents are currently available through the latest version of the AIA Contract Documents desktop software, as well as individually through AIA Documents-on-Demand and AIA Documents-on-Demand Plus.

Tags

Related Stories

| Oct 14, 2011

AIA Continuing Education: optimizing moisture protection and air barrier systems

Earn 1.0 AIA/CES learning units by studying this article and passing the online exam.

| Oct 12, 2011

BIM Clarification and Codification in a Louisiana Sports Museum

The Louisiana State Sports Hall of Fame celebrates the sporting past, but it took innovative 3D planning and coordination of the future to deliver its contemporary design.

| Oct 12, 2011

Vertical Transportation Systems Reach New Heights

Elevators and escalators have been re-engineered to help building owners reduce energy consumption and move people more efficiently. 

| Oct 12, 2011

Building a Double Wall

An aged federal building gets wrapped in a new double wall glass skin.

Office Buildings | Oct 12, 2011

8 Must-know Trends in Office Fitouts

Office designs are adjusting to dramatic changes in employee work habits. Goodbye, cube farm. Hello, bright, open offices with plenty of collaborative space.

| Oct 12, 2011

FMI’s Construction Outlook: Third Quarter 2011 Report

  Construction Market Forecast: The general economy is seeing mixed signs.

| Oct 12, 2011

Bulley & Andrews celebrates 120 years of construction

The family-owned and operated general contractor attributes this significant milestone to the strong foundation built decades ago on honesty, integrity, and service in construction. 

| Oct 12, 2011

Consigli Construction breaks ground for Bigelow Laboratory Center for Ocean Health

  Consigli to build third phase of 64-acre Ocean Science and Education Campus, design by WBRC Architects , engineers in association with Perkins + Will

| Oct 11, 2011

AIA introduces five new documents for use on sustainable projects

These new documents will be available in the first quarter of 2012 as part of the new AIA Contract Documents service and AIA Documents on Demand.

| Oct 11, 2011

Pink light bulbs donated to Society of Memorial Sloan-Kettering Cancer Center

  For every Bulbrite Pink Light Bulb that is purchased through the Cancer Center Thrift Shop, 100% of the proceeds will be donated to help support breast cancer research, education, screening, and treatment. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021