flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AIA releases updated edition of its A201 flagship documents

Codes and Standards

AIA releases updated edition of its A201 flagship documents

These core documents are updated once a decade.


By Peter Fabris, Contributing Editor | May 18, 2017

American Institute of Architects, Wikimedia Commons

The American Institute of Architects (AIA) recently released the 2017 edition of the A201 family of documents.

This release includes updated versions of the AIA’s flagship documents developed for the design-bid-build delivery model. The AIA Documents Committee updates this core set of documents every 10 years.

“It is critically important that industry professionals learn about the 2017 revisions,” says Kenneth Cobleigh, Esq., Managing Director and Counsel of AIA Contract Documents. “The changes impact the roles and responsibilities of each of the parties directly, and understanding the changes will help everyone to promptly review and finalize project contracts.”

Major owner/architect changes include:

  • Single Sustainable Projects Exhibit that can be used on any project and added to most AIA contracts to address risks and responsibilities associated with sustainable design and construction services.
  • Agreements contain a fill point to prompt the parties to discuss and insert an appropriate “Termination Fee” for terminations for the owner’s convenience.
  • Architect is no longer required to re-design for no additional compensation if he or she could not have reasonably anticipated the market conditions that caused the bids or proposals to exceed the owner’s budget.
  • Services beyond Basic Services and identified at the time of agreement are now categorized as Supplemental Services, to avoid confusing them with Additional Services that arise during the course of the project.
  • Agreements clarify how the Architect’s progress payments will be calculated if compensation is based on a percentage of the owner’s budget for the Work.

Related Stories

Codes and Standards | Feb 18, 2022

Proposal would make all new buildings in Los Angeles carbon-neutral

Los Angeles may become the next large city to ban fossil fuels from new construction if legislation recently introduced in the city council becomes law.

Codes and Standards | Feb 18, 2022

U.S. Army outlines ambitious renewable energy and decarbonization goals

Net-zero emissions in all procurements and a microgrid at every base among aims.

Codes and Standards | Feb 17, 2022

Pandemic won’t alter urban planning

City planners focused on returning to ‘old normal’.

Codes and Standards | Feb 16, 2022

California court rules affordable housing developers exempt from local zoning

Case could set precedent on state law that overrides local rules.

Codes and Standards | Feb 15, 2022

FORTIFIED resiliency standard expanded to include multifamily sector

Voluntary, beyond-code program aims to protect buildings from severe weather.

Codes and Standards | Feb 10, 2022

Number of Americans at risk of flooding to double in 30 years

Most new risk from new development, not climate change.

Codes and Standards | Feb 10, 2022

Intl. Code Council committee on diversity seeks applicants

New board aims to increase diversity in the membership association.

Codes and Standards | Feb 9, 2022

Climate impact of gas stoves in U.S. equal to half a million cars

New study could increase momentum to ban fossil fuels in new buildings.

Codes and Standards | Feb 7, 2022

Energy efficiency ratings not reflecting true energy use

Highest rated U.K. buildings are less efficient than lower rated ones.

Codes and Standards | Feb 3, 2022

Illinois tops USGBC list of states with the most LEED certified projects in 2021

Top 10 states plus D.C. certified more than 247 million gross square feet.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021