flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AIA reports: Hotels, retail to lead U.S. construction recovery

AIA reports: Hotels, retail to lead U.S. construction recovery


January 25, 2011

NEW YORK, Jan 26 (Reuters) - U.S. nonresidential construction activity will decline this year but recover in 2012, led by hotel and retail sectors, according to a twice-yearly forecast by an architects' trade group.

Overall nonresidential construction spending is expected to fall by 2% this year before rising by 5% in 2012, adjusted for inflation, the American Institute of Architects (AIA) said on Wednesday.

The projected decline marks a deteriorating outlook compared to the prior survey in July 2010, when a 2011 recovery was expected.

That recovery has been pushed back by historically low lending rates for real estate projects, lingering effects of overbuilding and an unfavorable bond market that has limited municipalities' access to funding, the AIA said.

Potential higher borrowing costs and rising energy prices are areas of concern for the architecture and construction industry, said AIA chief economist Kermit Baker.

Construction of industrial space is seen falling 11.8% this year, with smaller declines projected for office buildings, hotels and retail space. Spending is seen lower both this year and next on public safety infrastructure, but is expected to be up slightly in areas like healthcare, religious and recreational facilities.

The consensus forecast counts predictions from McGraw Hill Construction, IHS-Global Insight, Moody's economy.com, and others.

The AIA's monthly billings index, a leading indicator of activity because it measures work architects have performed, last month reached its best level since November 2007 and has pointed to increasing demand for design services for two consecutive months.

The billings index is considered an indicator of construction activity nine to 12 months in the future, and is tracked by companies that generate sales from the sector.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021