By almost every measure, 2015 was a good year for the airline industry. U.S. airlines and foreign carriers serving the U.S. flew an all-time high of 895.5 million passengers last year, up 5% from the previous record high of 853.1 million reached in 2014, according to the U.S. Department of Transportation. Twenty-sixteen is on track to be another record-smasher.
TOP AIRPORT TERMINAL ARCHITECTURE AND A/E FIRMS
Rank, Firm, 2015 Revenue
1. Corgan $65,839,265
2. HOK $60,840,000
3. Gensler $44,390,000
4. Gresham, Smith and Partners $25,600,000
5. RS&H $24,300,000
6. Stantec $19,226,351
7. HNTB Corporation $15,998,381
8. HKS $15,309,071
9. Leo A Daly $13,529,252
10. Alliiance $11,260,000
That’s good news for AEC firms that design and construct airport facilities. “Airports and airlines are pulling the trigger on projects that have been in conceptual mode for many years,” says Robert Chicas, AIA, LEED AP, SVP/Director of Aviation and Transportation Practice at HOK. Terminal construction in the U.S. will grow from $5 billion in 2015 to $5.9 billion in 2016, according to the American Road & Transportation Builders Association. Terminal work will reach $8 billion in five years.
New York’s LaGuardia Airport has $4 billion of construction in the works. The domestic terminal at Atlanta’s mammoth Hartsfield-Jackson is undergoing a $393 million modernization. Most of the nation’s other major airport authorities also have expansion or modernization on their minds.
Self-service ticketing kiosks have already allowed airlines to reduce the number of ticketing agents and shrink ticket counters. “There may be a point where there are no ticket agents,” Chicas says. Less space for ticketing opens up more areas for revenue-generating services, he says. Airlines might even locate their premium flyers clubs in those locations.
Security operations are a critical factor in today’s terminal design. New technology could help alleviate this frustrating experience, but to have the biggest impact, airports have to revamp the whole security process, says Damon Brady, Division Leader for Intelligent Infrastructure at Leidos. “Infrastructure has been set up as a series of checkpoints—information display, ticketing, security, shopping, gate holding areas, boarding areas,” he says.
TOP AIRPORT TERMINAL ENGINEERING AND E/A FIRMS
Rank, Firm, 2015 Revenue
1. Jacobs $138,770,000
2. Burns & McDonnell $71,332,857
3. WSP | Parsons Brinckerhoff $61,418,000
4. Arup $38,079,330
5. Ghafari Associates $22,500,000
6. Ross & Baruzzini $11,121,605
7. Walter P Moore $7,476,835
8. Woolpert $6,272,452
9. Jensen Hughes $6,023,819
10. Leidos $5,707,000
Each step adds time to the procession from front door to departure gate. Instead, passengers could use mobile technology to check in, obtain boarding passes, and print out baggage tickets themselves.
Airports in Europe and Asia have already revamped customs procedures for international arrivals. In the past, passengers presented their passports before getting their bags, then proceeded to another checkpoint with bags in tow. Now, it’s a one-stop process: Passengers pick up their bags before queuing up at Customs. The new process does require larger pre-screening areas for passengers toting luggage, says Daniel Diez, RA, Senior Associate at contractor Heery International.
Some overseas airports have introduced pre-screening mobile apps that speed up the customs process. Passengers enter biographical and flight information that can be verified by computer before the plane lands. In the U.S., the TSA may follow suit, possibly for domestic flights as well, Diez says. These new technologies and procedures should improve passenger flow, but in the short term, the trend is toward larger security gate areas.
In Europe, there is a new approach to waiting areas near gates, says Fernando Gavarrete, AIA, Heery’s Vice President and South Florida Area Manager. “It used to be that you would provide seating for 80% of people waiting at the gate,” he says. “The trend in Europe is to only provide seats for a small percentage of the population, especially for the elderly and handicapped.” Everyone else waits in restaurants or elsewhere in the concession area.
TOP AIRPORT TERMINAL CONSTRUCTION AND CM FIRMS
Rank, Firm, 2015 Revenue
1. Hensel Phelps $664,080,000
2. Turner Construction Co. $400,203,029
3. Austin Industries $341,922,742
4. Skanska USA $313,740,376
5. Walsh Group, The $283,239,511
6. Balfour Beatty US $140,722,239
7. Whiting-Turner Contracting Co., The $133,323,660
8. Manhattan Construction Group $129,346,000
9. Clark Group $126,144,654
10. McCarthy Holdings $125,989,779
AIRPORT GIANTS SPONSORED BY:
For this strategy to work, passengers must have real-time flight schedule information within eyesight to ensure they can make their flights. This may require more flight information screens, though many passengers are using their mobile electronic devices for status updates.
Airport operators want to get passengers through security and into the concession area as quickly as possible. “When passengers are more relaxed, they are more likely to shop,” says Enrique Melendez, Leidos’s Market Technology Leader. Every airport operator wants to boost revenue via more and better concessions.
With concessions essentially becoming gate holding areas, there is an opportunity for merchants to bring their products to the people, Brady says. Dynamic, personalized advertising can allow waiting passengers to order and pay for food or goods on their mobile devices, then dash into the store to pick up their orders—or even have them delivered to their seats. Retailers might even want to demonstrate products in front of waiting passengers. Plenty of space to accommodate such sales techniques, comfortable seating, and ample smartphone charging outlets will be needed to optimize this strategy.
The recent introduction of Airbus’s giant A380 model, which holds up to 544 passengers, means gates have to be expanded to accommodate boarding and disembarking the megaplane. “When one comes in, 500 passengers are looking for a bathroom as soon as they get off the plane,” says Gaverette. More and bigger bathrooms might be needed as more of these behemoths take to the skies.
The demand for design and construction services to provide additional capacity and modernize terminals bodes well for AEC firms working in the airport market. Those trends should result in several years of strong demand—a welcome change from the doldrums of the Great Recession.
The new Air Traffic Control Tower at San Francisco International Airport was recently named the Grand Conceptor award winner by the American Council of Engineering Companies. The new tower, designed by Walter P Moore (SE) to withstand a magnitude 7.5 earthquake, replaced the 1960s-era tower that was temporarily knocked out of commission during the 1989 Loma Prieta earthquake. It will open in October. Photo: © John Swain Photography. Click to enlarge.
RETURN TO THE GIANTS 300 LANDING PAGE
Related Stories
| Feb 11, 2011
RS Means Cost Comparison Chart: Office Buildings
This month's RS Means Cost Comparison Chart focuses on office building construction.
| Feb 11, 2011
Sustainable features on the bill for dual-building performing arts center at Soka University of America
The $73 million Soka University of America’s new performing arts center and academic complex recently opened on the school’s Aliso Viejo, Calif., campus. McCarthy Building Companies and Zimmer Gunsul Frasca Architects collaborated on the two-building project. One is a three-story, 47,836-sf facility with a grand reception lobby, a 1,200-seat auditorium, and supports spaces. The other is a four-story, 48,974-sf facility with 11 classrooms, 29 faculty offices, a 150-seat black box theater, rehearsal/dance studio, and support spaces. The project, which has a green roof, solar panels, operable windows, and sun-shading devices, is going for LEED Silver.
| Feb 11, 2011
BIM-enabled Texas church complex can broadcast services in high-def
After two years of design and construction, members of the Gateway Church in Southland, Texas, were able to attend services in their new 4,000-seat facility in late 2010. Located on a 180-acre site, the 205,000-sf complex has six auditoriums, including a massive 200,000-sf Worship Center, complete with catwalks, top-end audio and video system, and high-definition broadcast capabilities. BIM played a significant role in the building’s design and construction. Balfour Beatty Construction and Beck Architecture formed the nucleus of the Building Team.
| Feb 11, 2011
Kentucky’s first green adaptive reuse project earns Platinum
(FER) studio, Inglewood, Calif., converted a 115-year-old former dry goods store in Louisville, Ky., into a 10,175-sf mixed-use commercial building earned LEED Platinum and holds the distinction of being the state’s first adaptive reuse project to earn any LEED rating. The facility, located in the East Market District, houses a gallery, event space, offices, conference space, and a restaurant. Sustainable elements that helped the building reach its top LEED rating include xeriscaping, a green roof, rainwater collection and reuse, 12 geothermal wells, 81 solar panels, a 1,100-gallon ice storage system (off-grid energy efficiency is 68%) and the reuse and recycling of construction materials. Local firm Peters Construction served as GC.
| Feb 11, 2011
Former Richardson Romanesque hotel now houses books, not beds
The Piqua (Ohio) Public Library was once a late 19th-century hotel that sat vacant and deteriorating for years before a $12.3 million adaptive reuse project revitalized the 1891 building. The design team of PSA-Dewberry, MKC Associates, and historic preservation specialist Jeff Wray Associates collaborated on the restoration of the 80,000-sf Richardson Romanesque building, once known as the Fort Piqua Hotel. The team restored a mezzanine above the lobby and repaired historic windows, skylight, massive fireplace, and other historic details. The basement, with its low ceiling and stacked stone walls, was turned into a castle-like children’s center. The Piqua Historical Museum is also located within the building.
| Feb 11, 2011
Justice center on Fall River harbor serves up daylight, sustainable elements, including eucalyptus millwork
Located on historic South Main Street in Fall River, Mass., the Fall River Justice Center opened last fall to serve as the city’s Superior and District Courts building. The $85 million facility was designed by Boston-based Finegold Alexander + Associates Inc., with Dimeo Construction as CM and Arup as MEP. The 154,000-sf courthouse contains nine courtrooms, a law library, and a detention area. Most of the floors have the same ceiling height, which will makes them easier to reconfigure in the future as space needs change. Designed to achieve LEED Silver, the facility’s elliptical design offers abundant natural daylight and views of the harbor. Renewable eucalyptus millwork is one of the sustainable features.
| Feb 11, 2011
Research facility separates but also connects lab spaces
California State University, Northridge, consolidated its graduate and undergraduate biology and mathematics programs into one 90,000-sf research facility. Architect of record Cannon Design worked on the new Chaparral Hall, creating a four-story facility with two distinct spaces that separate research and teaching areas; these are linked by faculty offices to create collaborative spaces. The building houses wet research, teaching, and computational research labs, a 5,000-sf vivarium, classrooms, and administrative offices. A four-story outdoor lobby and plaza and an outdoor staircase provide orientation. A covered walkway links the new facility with the existing science complex. Saiful/Bouquet served as structural engineer, Bard, Rao + Athanas Consulting Engineers served as MEP, and Research Facilities Design was laboratory consultant.
| Feb 11, 2011
A feast of dining options at University of Colorado community center, but hold the buffalo stew
The University of Colorado, Boulder, cooked up something different with its new $84.4 million Center for Community building, whose 900-seat foodservice area consists of 12 micro-restaurants, each with its own food options and décor. Centerbrook Architects of Connecticut collaborated with Denver’s Davis Partnership Architects and foodservice designer Baker Group of Grand Rapids, Mich., on the 323,000-sf facility, which also includes space for a career center, international education, and counseling and psychological services. Exterior walls of rough-hewn, variegated sandstone and a terra cotta roof help the new facility blend with existing campus buildings. Target: LEED Gold.
| Feb 11, 2011
Chicago high-rise mixes condos with classrooms for Art Institute students
The Legacy at Millennium Park is a 72-story, mixed-use complex that rises high above Chicago’s Michigan Avenue. The glass tower, designed by Solomon Cordwell Buenz, is mostly residential, but also includes 41,000 sf of classroom space for the School of the Art Institute of Chicago and another 7,400 sf of retail space. The building’s 355 one-, two-, three-, and four-bedroom condominiums range from 875 sf to 9,300 sf, and there are seven levels of parking. Sky patios on the 15th, 42nd, and 60th floors give owners outdoor access and views of Lake Michigan.
| Feb 11, 2011
Iowa surgery center addresses both inpatient and outpatient care
The 12,000-person community of Carroll, Iowa, has a new $28 million surgery center to provide both inpatient and outpatient care. Minneapolis-based healthcare design firm Horty Elving headed up the four-story, 120,000-sf project for St. Anthony’s Regional Hospital. The center’s layout is based on a circular process flow, and includes four 800-sf operating rooms with poured rubber floors to reduce leg fatigue for surgeons and support staff, two substerile rooms between each pair of operating rooms, and two endoscopy rooms adjacent to the outpatient prep and recovery rooms. Recovery rooms are clustered in groups of four. The large family lounge (left) has expansive windows with views of the countryside, and television monitors that display coded information on patient status so loved ones can follow a patient’s progress.