Alan Greenberger, FAIA, former Philadelphia Deputy Mayor and Chairman of the City Planning Commission, has been selected to receive the 2017 Thomas Jefferson Award. The Thomas Jefferson Award recognizes excellence in architectural advocacy and achievement. Greenberger will be honored at the AIA Conference on Architecture 2017 in Orlando.
Lured from his role as a principal at Philadelphia’s MGA Partners by former Philadelphia Mayor Michael Nutter, Greenberger quickly assumed a dual role as deputy mayor and chairman of the City Planning Commission. Responsible for the Department of Commerce as well as oversight of planning and 10 additional agencies, Greenberger spearheaded an audacious initiative to rewrite the city’s antiquated and convoluted zoning code and create Philadelphia2035, a comprehensive plan for the city’s renaissance. During his tenure, he also completed and approved plans for all 37 miles of the city’s waterfront and led Philadelphia to its greatest redevelopment and population influx since the mid-20th century.
When the Nutter administration reached its two-term limit, Greenberger left full-time public office. He now shares his knowledge and wealth of experience with the next generation of design professionals as the Distinguished Teaching Professor and Lind Fellow in the Department of Architecture and Interiors at Drexel University. Later this year, he will assume the role of department head. Greenberger remains active with the city he helped become a UNESCO World Heritage site in 2015, serving as chairman of the Philadelphia Art Commission. An independent body, it is tasked with design oversight of all public facilities, signage, and artwork.
Related Stories
| Jun 13, 2013
AIA partners with industry groups to launch $30,000 'Designing Recovery' design competition
The program will award a total of $30,000 to three winning designs, divided equally between three locations: Joplin, Mo., New Orleans, and New York.
| Jun 12, 2013
More than 90% of New York City schools have code violations
More than 90% of New York City schools have at least one outstanding building code violation. Loose wires, stuck doors and inadequate ventilation are just some of the problems.
| Jun 12, 2013
5 building projects that put the 'team' in teamwork
The winners of the 2013 Building Team Awards show that great buildings cannot be built without the successful collaboration of the Building Team.
| Jun 12, 2013
Sacred synergy achieves goals for religious education [2013 Building Team Award winner]
A renovation/addition project at Columbia Theological Seminary unites a historic residence hall with a modern classroom facility.
| Jun 12, 2013
‘Talking’ Braille maps help the visual impaired
Talking pen technology, combined with tactile maps, allows blind people to more easily make their way around BART stations in the Bay Area.
| Jun 11, 2013
Music/dance building supports sweet harmony [2013 Building Team Award winner]
A LEED Gold project enhances a busy Chicago neighborhood, meeting ambitious criteria for acoustical design and adaptability.
| Jun 11, 2013
Vertical urban campus fills a tall order [2013 Building Team Award winner]
Roosevelt University builds a 32-story tower to satisfy students’ needs for housing, instruction, and recreation.
| Jun 11, 2013
Building a better box: High-bay lab aims for net-zero [2013 Building Team Award winner]
Building Team cooperation and expertise help Georgia Tech create a LEED Platinum building for energy science.
| Jun 11, 2013
Finnish elevator technology could facilitate supertall building design
KONE Corporation has announced a new elevator technology that could make it possible for supertall buildings to reach new heights by eliminating several problems of existing elevator technology. The firm's new UltraRope hoisting system uses a rope with a carbon-fiber core and high-friction coating, rather than conventional steel rope.
| Jun 10, 2013
Lake Washington STEM school combines modular and site-built construction to meet ambitious schedule
When the Lake Washington School District outside Seattle needed a new high school built on an ambitious permitting and construction schedule of seven months, modular construction proved to be an ideal solution.