flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Amazon office building doubles as emergency housing for Seattle families

Office Buildings

Amazon office building doubles as emergency housing for Seattle families

The Amazon office dedicated eight floors to Mary's Place, a nonprofit that supports families experiencing homelessness.


By Quinn Purcell, Managing Editor | December 1, 2023
Mary’s Place Family Center for families experiencing homelessness
Mary’s Place Family Center, Seattle, Wash. Photo © Benjamin Benschneider, courtesy Graphite Design Group

In collaboration with Amazon, Graphite Design Group designed Mary’s Place Family Center, a nonprofit supporting families experiencing homelessness. The center provides emergency housing and services to families inside the downtown Seattle Amazon office building.

The unusual location for services of this kind serves over 300 people per day. Mary's Place spreads across eight of the office's floors—all designed by Graphite—testing the status quo for its experimental approach to homelessness support.

Emergency Housing for Seattle Families

Each floor provides various services and amenities for the sheltered:

  • Level P1: Parking, Storage, Facilities Workshop
  • Level G: Loading Dock and Staging, Storage, Dogwash
  • Level 1: Lobby, Multipurpose Room, Conference Room
  • Level 2: Diversion Sleep Floor
  • Level 3: Standard Sleep Floor
  • Level 4: Popsicle Place
  • Level 5: Popsicle Place
  • Level 6: Welcome and Intake, Heat Treat, Staff Area, Marketplace
  • Level 7: Dining Room, Full Kitchen, Play Area, Interfaith Prayer Room
  • Level 8: Rec Room, Terrace, Laundry, Games, Large Conference Room

 

Family in emergency housing shelter
Photo © Benjamin Benschneider, courtesy Graphite Design Group

While designing the center, Graphite invited Mary's Place staff to contribute ideas to best support guests. The group brainstormed words, images, and scenarios that eventually helped craft the space into a community-serving shelter.

Mary’s Place Family Center was also recognized at the AIA Seattle Honor Awards and the Council for Tall Buildings and Urban Habitat Awards for its novel approach to urban development. Graphite believes the project acts as a model for how other cities can activate underutilized space to answer larger urban housing challenges while balancing growth and social equity.

On the Building Team:
Owner: Amazon, Global Real Estate and Facilities team and Mary's Place
Developer: Seneca Group
Architect: Graphite Design Group
Structural/Civil Engineer: Coughlin Porter Lundeen
Electrical/Acoustic Engineer: Stantec
Mechanical/Energy Design: WSP
GC: GLY Construction

Related Stories

Office Buildings | May 8, 2020

The pillars of work

The workplace will most certainly look different in the future, but how different it looks will be unique to every organization. There (still) is no one-size-fits-all solution.

Office Buildings | Mar 24, 2020

Morphosis designs lululemon’s new global headquarters

The HQ’s design is meant to serve as an extension of lululemon’s core values.

Office Buildings | Mar 16, 2020

Investments in ‘human experiences’ are paying off for employers

A recent survey conducted by JLL and Harvard Business Review found that more companies are giving their employees greater say in changing their work environments. 

Coronavirus | Mar 15, 2020

Designing office building lobbies to respond to the coronavirus

Touch-free design solutions and air purifiers can enhance workplace wellness.

Plumbing | Mar 13, 2020

Pioneer Industries launches new website

Pioneer Industries launches new website

Architects | Mar 9, 2020

New York's façade inspection program gets an overhaul following a death from falling terra cotta

January 14, 2020, kicked off big changes to the NYC Local Law 11 Façade Inspection and Safety Program (FISP) for Cycle 9.

Office Buildings | Mar 5, 2020

SOM design’s Disney’s New York HQ

The HQ is being built in the Hudson Square neighborhood.  

Office Buildings | Feb 13, 2020

CareerBuilder’s Chicago HQ undergoes renovation

Perkins and Will designed the project.

boombox1
boombox2
native1

More In Category



Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.


MFPRO+ News

San Francisco unveils guidelines to streamline office-to-residential conversions

The San Francisco Department of Building Inspection announced a series of new building code guidelines clarifying adaptive reuse code provisions and exceptions for converting office-to-residential buildings. Developed in response to the Commercial to Residential Adaptive Reuse program established in July 2023, the guidelines aim to increase the viability of converting underutilized office buildings into housing by reducing regulatory barriers in specific zoning districts downtown. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021